1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013.

Slides:



Advertisements
Similar presentations
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Assurance Services Independent professional services that “improve the quality of information, or its context, for decision makers” Assurance service encompass.
Revaluation of non-current assets
Events occurring after the end of the reporting period
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
1 BANK PROFITABILITY (BP) PROGRESS REPORT Working Party on Financial Statistics Paris 2,3 October 2007 D. Campion STD/NAFS OECD.
1 Welcome Safety Regulatory Function Handbook April 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Mr. Bing Yuan Liou, Senior Specialist, Bureau of Standards, Metrology and Inspection, Ministry of Economic Affairs BSMI web site:
The Implementation Structure DG AGRI, October 2005
1 DG TAXUD/C/213/05/2005 Future of Preferential Rules of Origin Commission Communication The Rules of Origin in Preferential Trade Arrangements Orientations.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 2 Q 3 Q 4 Q 5 Q 6Q 16Q 11Q 21 Q 7Q 12Q 17Q 22 Q 8Q 13Q 18 Q 23 Q 9 Q 14Q 19Q 24 Q 10Q 15Q 20Q 25 Final Jeopardy Writing Terms.
August 8, 2013 Texas Education Agency | Office of Assessment and Accountability Division of Performance Reporting Shannon Housson, Director Overview of.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Audit Evidence Week 11.
Project Appraisal Module 5 Session 6.
ZMQS ZMQS
STATISTICAL INFERENCE ABOUT MEANS AND PROPORTIONS WITH TWO POPULATIONS
Blanket Purchase Orders Training Presentation for Supply Chain Platform: BAE Systems July 2012.
The SCPS Professional Growth System
Marketing University Technologies : Linking University Research and Industry Interests Heidjer Staecker, J.D., LLM TreMonti Consulting LLC
Copyright © 2012 Pearson Prentice Hall. All rights reserved. CHAPTER 23 Risk Management in Financial Institutions.
Regulation and Credit Framework for the Conferment of Awards Quality and Standards Office.
AEMCPAGE Relaunch 1 June 2009.
Additional Assurance Services: Other Information
1 Regulation of Sponsors and Independent Financial Advisers Joint HKEx / SFC Press Conference 19 October 2004.
© 2005 KPMG IFRG Limited, a UK registered company, limited by guarantee, and a member firm of KPMG International, a Swiss cooperative. All rights reserved.
SAI Performance Measurement Framework
CIP Version 5 Transition Guidance September 2013 Open-Webinar
© 2007 Lawrenceville Press Slide 1 Chapter 3 Margins.
1 Training Package Re-Design and its opportunities.
Heemskirk Tin Project - Tasmania Tim Callaghan Geology and Resources September ASX: SRZ.
Internal Control–Integrated Framework
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Compliance Assurance Process (CAP) Permanency
1 Committee of the Regions Commission on the EU Budget 13 February 2014 Opinion on the EU Budget execution Manfred Kraff Deputy Director-General DG Budget.
Addition 1’s to 20.
25 seconds left…...
SCIA Special Circumstances Instructional Assistance
International Accounting Standard 33
LACPA ISA Presentation
1 Budgets and Budgetary Control Prepared and Presented By Gladstone K. Hlalakuhle.
Week 1.
Chapter 8 Estimation Understandable Statistics Ninth Edition
Financial Reporting changes for FReM compliant entities Fact Sheet Overview This Fact Sheet highlights the key changes in the HM Treasury.
1 Unit 1 Kinematics Chapter 1 Day
PIC Investments Performance Update Year ended 30 September 2014 APPENDIX Advisor Use Only.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 16 Stationary-Source Local Air Pollution.
Developed and presented by Samuel A. Monastra, CPA.
ASX Developments Kevin Lewis, ASX Group Executive and Chief Compliance Officer December 2014.
The implications of the new JORC Code (2012) with regard to disclosure
Market regulation for mineral companies May 2009Job Langbroek.
Are you Ready for JORC 2012?. Outline TimePresentation 13:00Welcome (Graham Jeffress, AIG WA) 13:05Overview and Background to JORC 2012 (Jill Terry JORC)
1 Horses for Courses: CRIRSCO Template and UN Framework Classification Ruth Allington* and Stephen Henley** *President, European Federation of Geologists.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
Insert Your Firm’s Logo Here
Construction underway with strong local support at the Salamanca mine in Western Spain April 2017.
Principles of and requirements for public reporting of mining companies by securities regulators with the Australian example of JORC, ASIC and ASX. Ian.
An overview of the CRIRSCO International Reporting Template
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
Presentation transcript:

1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013

2 Overview  ASX review & consultation  New reporting requirements under the ASX Listing Rules, including Guidance Note 31  Transition period & implementation

3 ASX Review & Consultation New ASX Listing Rules developed following extensive consultation  2 rounds of consultation, with 2 consultation papers  138 written submissions received  64 consultation roundtables and consultation meetings  all peak industry bodies and shareholder groups actively involved in the process – JORC, AIG, AusIMM, MCA, AMEC, ASA

4 Summary of the New Reporting Framework Chapter 5 Listing Rule reporting requirements for material mining company resource disclosures  underpinned by 2012 JORC Code  remains principles-based but acknowledges need for enhanced disclosure standards  Guidance Note 31 - Reporting on Mining Activities

5 Rules Focused on Materiality Many Chapter 5 requirements for additional disclosure are triggered when reporting on ‘material projects’:  exploration results (minerals)  initial & materially changed estimates of mineral resource (inferred, indicated, measured)  historical and foreign estimates  longer term production targets not based on ore reserve & an operating mine

6 New Reporting Requirements  Exploration results  Mineral resources  Ore reserves  Competent person sign-off  Historical and foreign estimates  Production targets  Cautionary statements  Annual disclosure

7 Exploration Results LR 5.7 – disclosure of exploration results for a material project:  material drill-holes, a drill-hole table showing specific location & intercept information: easting, northing, elevation, dip, azimuth, down hole width & depth & end of hole  if not, then an explanation of why the company has determined that this information is not material to understanding the reported results

8 Exploration Results (cont.)  requirement for a report based on sections 1 (sampling techniques and data) & 2 (reporting of exploration results) of Table 1 of the JORC Code to be attached to the market announcement the report can be prepared on an ‘if not, why not’ basis if an entity determines that one or more of these criteria is not material it must identify each criterion and explain why it has been determined that it is not material to understanding the exploration results  streamlined CP sign-off

9 Mineral Resources LR 5.8 – disclosure of initial (or materially changed) estimates of mineral resources for a material project:  requirement for a summary of prescribed parameters in the market announcement geology, sampling techniques & analysis, drilling techniques, data spacing, estimation methodology, cut-off grade, mining & metallurgical methods & parameters considered to date  requirement for a report based on sections 1-3 of Table 1 of the JORC Code to be prepared on an ‘if not, why not’ basis and attached to the market announcement  streamlined CP sign-off

10 Ore Reserves LR 5.9 – disclosure of initial (or materially changed) estimates of ore reserves for a material project:  requirement for a summary of prescribed parameters in the market announcement material assumptions & outcomes of PFS, criteria used for classification, estimation methodology, basis of cut-off grade selected, mining & processing methods selected, material modifying factors

11 Ore Reserves (cont.)  requirement for a report based on sections 1-4 of Table 1 of the JORC Code to be attached to the market announcement  streamlined CP sign-off  Guidance Note 31 – guidance on commercially sensitive economic assumptions – why the information is considered commercially sensitive and methodology used to be disclosed

12 Competent Person Sign-off Streamlined competent person sign-off requirements:  prior written consent required when reporting for the first time exploration results & estimates of MR & OR for a material project  subsequent reporting of the same information does not require CP sign-off, subject to certain conditions being met  new CP sign-off required where there is a material change to the estimates and/or a material change to the assumptions & technical parameters underpinning the estimates

13 Historical and Foreign Estimates LRs 5.10 to 5.14 – disclosure of historical & foreign estimates:  requirement for the disclosure of supporting information  annual reporting requirements for updating progress on converting the estimates to MR/OR reported in accordance with the JORC Code  prohibition on including historical & foreign estimates (other than qualifying foreign estimates) in economic studies

14 Production Targets/Forecast Financial Information LRs 5.15 to 5.19 – disclosure of production targets:  rules apply to longer term projections of production not underpinned by operating mine(s) & solely underpinned by: OR OR & measured MR OR and measured MR and/or indicated MR  prohibition on the disclosure of a production target based: solely on an exploration target solely on a combination of inferred MR and an exploration target on historical & foreign estimates (other than qualifying foreign estimates)

15 Production Targets/Forecast Financial Information  additional disclosure required: material assumptions company to confirm underlying mineralisation signed-off by a CP respective proportions of OR, MR & exploration potential underpinning the target to be disclosed  where it includes inferred MR & exploration potential – proximate cautionary statements required & disclose the basis for including exploration potential

16 Production Targets/Forecast Financial Information  additional requirements when it is based solely on inferred MR: disclose the basis for target & level of confidence of inferred MR completion of a technical report of a sufficient level of confidence to support the production target public release of the technical report technical report prepared by independent CP cautionary statements Guidance Note 31 - guidance in relation to it being in exceptional circumstances where a company may have a basis for this

17 Cautionary Statements Cautionary statements for production targets and historical estimates:  must be proximate – on the same page and same paragraph or immediately preceding or following paragraph  not satisfactory in a footnote or a general disclaimer  must have equal prominence – same font type, size and colour as the relevant information  if statement in a heading, cautionary statement must also be in a heading

18 Annual Disclosure LRs 5.20 & 5.21 – annual MR & OR statement in the annual report which discloses:  results of annual review of MR & OR  aggregated holdings of MR & OR by commodity & by geographical area  comparison of MR & OR aggregated holdings against estimates from previous year – explaining material changes  summary of governance arrangements and internal controls

19 New Reporting Requirements – 2012 JORC Code Frequently Asked Questions:  Transition to new disclosure rules  Competent Person Statement  Exploration Targets faqs.htm

20 Transition  Effective from 1 December 2013 save for the requirement for feasibility or pre-feasibility study prior to the declaration of an OR estimate which is effective from 1 December 2014  During the transition period, minimum requirements for public reports compliance with JORC Code 2004 and current listing rules  Entities encouraged to early adopt but required to comply with new listing rules and 2012 JORC Code from the point of early adoption  Be prepared for the implementation of the new rules and the 2012 JORC Code from 1 December 2013

21 Enquiries Contact: James Rowe State Manager ASX Listings Compliance (Perth) questions –