LA GLORIA. Gloria Main TERREROS OPEN PIT Enero 2010.

Slides:



Advertisements
Similar presentations
DOROTHEA PROJECT NORTHWEST ONTARIO A LARGE TONNAGE, LOW GRADE, PORPHYRY GOLD-COPPER-MOLY- SILVER SYSTEM.
Advertisements

Project QC Consultation on Proposed Reliability Standards and Supporting Documents Information Session with Entities Concerned January 11 and 16,
APPLICATION SIP-BASED VoIP INTERCOM, PAGING & MUSIC PLAYER, CONTROL&MONITORING.
Organisational Charts June 2010 Information correct at 30th June 2010.
Labour quality and ICT capital skill complementarity: International comparisons Mary OMahony NIESR.
Input-Output Analysis in Current or Constant Prices: Does it Matter? Erik Dietzenbacher & Umed Temurshoev Faculty of Economic and Business University of.
April 2000 COCUS and NPA Exhaust Analysis NANPA Report to the NANC May 23, 2000.
HAPPEX publications 1.Source (Kent, Gordon, Snyder) Jlab PVeS experimental review paper (Riad) 2.Transverse Asymmetry (Kent, Armstrong) G0 transverse (arXiv: v2)
PIM ECMP Assert draft-hou-pim-ecmp-00 IETF 80, Prague.
Lehigh University Introduction to BusinessMap3 Tuesday October 28, 2003 LaVerne Williams, Software Support Administrator.
Brian Theaker RCWG Chair
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
1 Often asked questions Eva Červená CZECH HYDROMETEOROLOGICAL INSTITUTE WORLD METEOROLOGICAL ORGANIZATION RA VI Training Workshop on BUFR and Migration.
Widening Participation in Higher Education: Analysis using Linked Admin Data Institute of Education Institute for Fiscal Studies Centre for Economic Performance.
Explaining exits from unemployment in the UK, Labour Force User Meeting - 2 nd December 2010 Peter Stam Household Labour Market and Developments.
Projecting the Effect of Changes in Smoking and Obesity on Future Life Expectancy in the United States Samuel H. Preston University of Pennsylvania Retirement.
An MBA will never change the world – we leave that to our graduates Business School Barriers Towards the Development of Emerging Contractors in the Limpopo.
By William C Burton. The community will roughly gain $11.4K in equity for Equity2012 Monthly Net Income - Mean (Average): $46, Mean.
CCTC MFG Capabilities & Technology Roadmap
Sierra Proto Express Introducing our Micro Electronics Division.
Background and Capabilities Presentation : Elreha GmbH was established in Hockenheim, Germany, designing and manufacturing temperature controls.
Boyle’s Law As the pressure on a gas increases - the volume decreases
PROMARK INTERNATIONAL YOUR RELIABLE SOURCE FOR GIFTS AND GIVE AWAYS Business Promotion & Gift Items You know the advantages of marketing with ad specialty.
Opportunities for Gigascale Integration in Three Dimensional Architectures James Joyner, Payman Zarkesh-Ha, Jeffrey Davis, and James Meindl Microelectronics.
JDEWS JDEWS is the non governmental organization working to provide quality education to the underprivileged children of and vocational training to the.
Company Proprietary Karl Kortkamp, SE, SGI New Mexico Computing Applications Center (NMCAC) System Diagrams & Physical Layouts.
Chicken Soup for the Busy Coordinator
High Performance: No Decisions City of Roseville, MN.
Olukunle Amoo BestKamco Resources, Toronto, Canada
MONGOL GAZAR LLC OLON OVOOT GOLD PROJECT
MDG CAMEX INVESTMENT Present Investment $3,000,000 Proposed Investment $5- 10,000,000 Camex MDG Overview Pre-RTO Copper, Gold and silver mining investment.
QXF Shell & Yoke: LARP Experience in LR, HQ, LQ Dan Cheng Sept 17, 2013.
R. L. Bruno, E. Douarin, J. Korosteleva and S. Radosevic
XADO – TECHNOLOGY modifies friction surfaces
Recent ACS: STEMI, NSTEMI, UA Stabilized 1-7 Days Post-Index Event Exclusions: increased bleeding risk, warfarin use, ICH, prior stroke if on ASA + thienopyridine.
August 16, 2014 Modeling the Performance of Wireless Sensor Networks Carla Fabiana Chiasserini Michele Garetto Telecommunication Networks Group Politecnico.
Very large numbers! BOOM! How far? miles.
Scientific Notation Standard form / Scientific Notation Scientific Notation very small.
1 World Intellectual Property Organization Current status of the e-PCT standard Standard for electronic filing under the PCT SCIT SDWG December 2002 PCT-SAFE:
Code Streamlining and Updates Project Nonconformities and Variances Draft Annotated Outline.
Drafting Technology Threaded Fasteners.
January 2012 Samalayuca Samalayuca is a Mexican mining/exploration company based in Chihuahua, Mexico. Samalayuca owns the Kaity claim, a 1623 hectare.
Gardin Inc. A gold deposit in an extensional tectonic setting Cumeral (Sonora, Mexico) 0.73 g/t Au.
2012 IEEE Region 5 Annual Meeting and Awards Banquet Tulsa, Oklahoma 21 April 2012.
1 IKI10230 Pengantar Organisasi Komputer Kuliah no. A7: Bahasa Rakitan AVR Interrupt Handler 25 April 2003 Bobby Nazief Qonita Shahab.
In 2006 John Ortmann created a stunning virtual model of LM-5. It was such an inspiration that I decided I should try to build a real model with the same.
A GEOGRAPHICAL REVIEW OF THE INDUSTRIAL TERRITORY BY: LORENZO GUTIERREZ.
A HISTORICAL REVIEW OF THE INDUSTRIAL REVOLUTION BY: LORENZO GUTIERREZ.
New N. Atlanta High School 4111 Northside Parkway Project Overview March 25, 2010 Facilities Services Department September 20, 2011.
1 Los Angeles World Airports | LAX Interim Runway Safety Improvement Project Update of Interim Safety Improvement Planning Presentation to Board of Airport.
Conducted by the Die Materials Specification Subcommittee November 1 st & 2 nd 2005 Die Materials Specification Task Group Die Steel Quality & Heat Treatment.
PLACE VALUE Page 20 Math Review #1-3 #9-13.
Yellow Perch 001 Lake Michigan Date Collected: 12/16/2010 Total Length: 320 mm Thin Sectioned Sagittal Otolith Transmitted Light.
1/15/2015 Slide # 1 Binary, Octal and Hex Numbers Copyright Thaddeus Konar Introduction to Binary, Octal and Hexadecimal Numbers Thaddeus Konar.
PowerPoint Learn how to use it….. b u t d o n ’ t a b u s e i t ….. Remember - just because you can do something, it doesn’t necessarily mean that you.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
1 Annual General Meeting November What we’ve done Where we are Barra Resources Ltd The Year in Summary  High Grade Wahloo Shoot discovered at.
URANIUM EXPLORATION AND MINING ON THE BUREAU OF LAND MANAGEMENT IN ARIZONA.
November 11, 2004 Biogeohydrological Environment and Physical Aspects of the Henderson Mine Site Climax Molybdenum Company Henderson Operations.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Mass, Weight, and Density Density is mass per unit of volume. M D = V.
RED LAKE ONTARIO 10 M oz Gold Production km N McCUAIG JV PROJECT Golden Tag Resources Ltd.
Laguna Site Investigation Geological and Geotechnical Models Petteri Somervuori, Espoo,
Mineral Resources EES – Chapter 19.
GEOLOGY AND MINERAL POTENTIAL OF PORTUGAL
of these basic elements
Comparison of Seismic and Well Data
Sliding Hook Ruler Jack A. Loganbill 04/ ” Ruler b a
Global Connections - pg
Rocks and Minerals.
Presentation transcript:

LA GLORIA

Gloria Main

TERREROS OPEN PIT

Enero 2010

Gloria Sampling Distribution Copper Result

La Gloria Thickness = Approx 25m excluding other mineralised layers Interpretation of mineralised Stratification – Section Ln0050E – Gloria Main Pit

April 2011 La Gloria – Schematic stratigraphic distribution of copper grade along litharenite.

Gloria Main – Core Drill Hole Proposition With this program, a block of 2Millions ton is defined and supergene existence is totally verified. DDH #Line #EastingNorthingOrientationInclinationLenght (m) GL11-001Ln0150E N GL11-002Ln0100E N GL11-003Ln0050E N GL11-004Ln N GL11-005Ln0050W N GL11-006Ln0100W N GL11-007Ln0150W N GL11-008Ln0250W N GL11-009Ln0050E N GL11-010Ln0050E N GL11-011Ln0050E GL11-012Ln0050E Total 2250

Gloria Main – Location of proposed drill holes

La Gloria – Drill Holes Program along Stratiform Mineralisation and Interpretation of Copper Supergene Enrichment Interpretation of mineralised Stratification and supergene enriched zones – Section Ln0250W – Gloria Main Pit

Raw Evaluation of Stratiform Mining Potential Volume of mineralised area. Lengh: 600m Width: 20m Depth: 75m 600m x 20m x 75m = 900,000m 3 Tonnage Density 2,85 ton/m 3 900,000m 3 x 2,85ton/m 3 = 2,565,000 tons Notice that the high grade mineralisation supergen oxides zones in fault zone, may definitely increase the grade and the volume of Gloria Main zone. La Gloria First Objective