Janice Hodge, NFPS Technical Coordinator NFPS Risk Analysis Framework – Technology Transfer Workshop, March 22, Halifax, Nova Scotia.

Slides:



Advertisements
Similar presentations
THE IPPC and PRA: Bram de Hoop International Standards Adviser Holland
Advertisements

1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
The Regulatory Impact Analysis Statement (RIAS) in Canada
Pest Risk Analysis (PRA) Training
Pest Risk Analysis (PRA) Stage 2: Pest Risk Assessment
Pest Risk Analysis (PRA) Training
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
ISPM 6: Guidelines for Surveillance
1 CFIA-ACIA Pest Risk Analysis (PRA) Training International Plant Protection Convention (IPPC) CFIA-ACIA.
Phytosanitary Risk Analysis – the New Zealand Experience
The Role and Relationship of Scientific and Official Information IPPC Secretariat July 2011 Kuala Lumpur, Malaysia.
The Role and Relationship of Scientific and Official Information Dave Nowell & Jan Breithaupt IPPC Secretariat Rome Italy.
Pest Risk Analysis (PRA) Stage 2: Pest Risk Assessment Pest Risk Analysis (PRA) Training.
Generating Economic Impacts from Physical Climate Impacts: Implications for California Prof. Charles D. Kolstad Environmental Economics Program Bren School.
EMS Checklist (ISO model)
EPPO pests lists purposes & procedures European and Mediterranean Plant Protection Organization.
Risk Assessment and Prioritisation for Invasive Species John Kelly.
Eradication, Containment and Contingency Planning
RAF Technical Overview
RA Framework. Risk Assessment ‘Area of concern’…  Every risk assessment has a geographic dimension  You need to explicitly identify the geographic.
PROJECT RISK MANAGEMENT
1 Landscape Unit Planning Guide Training 2 Agenda for the day 8:30 AM - 4:30 PM - opening remarks - introduction - wildlife tree retention - review principles.
Pest Risk Analysis (PRA)
Chapter 2 Analyzing the Business Case.
ASSESSMENT IN HIAs Elizabeth J. Fuller, DrPH, MSPH Georgia Health Policy Center.
Plant Health in the Global Trading Environment – An Introduction GRAEME EVANS.
Introduction to Pest Risk Assessment. Presentation Overview  Purpose of Pest Risk Analysis (PRA)  Principles of Pest Risk Analysis  Components of Pest.
The EPPO Decision Support Scheme on Pest Risk Analysis and invasive alien plants Sarah Brunel.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Pest Risk Analysis International Plant Protection Convention (IPPC)
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Syktyvkar, Komi Republic April 1, 2009 Presented by Marcelo Levy Responsible Forestry Solutions.
PROJECT RISK MANAGEMENT Presentation by: Jennifer Freeman & Carlee Rosenblatt
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Risk Analysis Framework 1. Risk assessment Triggers pest commodity pathway ecosystem Identify threat Estimate likelihood of occurrence Estimate magnitude.
MANTADIA- ZAHAMENA. Deforestation across elevation  Between 1974 and 1994: around 90% of forest
Northeast Landscape Plan Update Trends Exploration University of Minnesota Boreal Forest and Community Resilience Project June 12, 2012.
Professional Learning and Development: Best Evidence Synthesis Helen Timperley, Aaron Wilson and Heather Barrar Learning Languages March 2008.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
Strategic and Scientific Thinking about American Chestnut Recovery.
The new EC impact assessment: what for? EUROPEAN TRADE UNION CONFEDERATION Sophie Dupressoir.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Law and Policy of Relevance to the Management of Plant Genetic Resources Objectives of Day Five 1.To identify the main international agreements.
UFZ-Center for Environmental Research Leipzig-Halle GmbH 1 Integrated Assessment of Biological Invasions as a basis for biodiversity policies Felix Rauschmayer,
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Group F: Economic Consequences of Invasive Species Q1: Critical Scientific Issues Quantifying and verifying non-market impacts and their value Costs of.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
The International Plant Protection Convention Presenter organization THE INTERNATIONAL YEAR OF PLANT HEALTH OccasionDate.
RISK COMMUNICATION VELIA ARRIAGADA RIOS INGENIERO AGRONOMO SERVICIO AGRICOLA Y GANADERO CHILE.
Pest Risk Analysis (PRA) Stage 2: Pest Risk Assessment.
EU Plant Health Regime - Role of research -Evaluation of EU PLH Regime Guillermo H. Cardon European Commission, DG SANCO Plant health / Harmful organisms.
INFORMATION SESSION ON PHYTOSANITARY REGULATIONS IN GRAIN IMPORTS.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Risk Assessment: A Practical Guide to Assessing Operational Risk
LMO RISK ASSESSMENT UNDER THE IPPC AND THE CARTAGENA PROTOCOL ON BIOSAFETY Velia Arriagada Rios Servicio Agrícola y Ganadero, Chile.
New Ecological Science Advice for Ecosystem Protection The EPA Science Advisory Board (SAB) Staff Office supports three external scientific advisory committees.
IPP Training, IAPSC & IPPC/FAO/FAORAF
Ralf Lopian Senior Advisor
TERMINOLOGY OF THE CONVENTION ON BIOLOGICAL DIVERSITY IN RELATION TO THE GLOSSARY OF PHYTOSANITARY TERMS Introduction (1) IPPC Contracting Parties are.
ISPM 8: Pest Status of on Area
Trade and Pest Management
Communication and Consultation with Interested Parties by the RB
Operationalizing Export Certification and Regionalization Programmes
PEST RISK ANALYSIS IN MALAWI: Practice and Experiences
Developing a shelter strategy
Presentation transcript:

Janice Hodge, NFPS Technical Coordinator NFPS Risk Analysis Framework – Technology Transfer Workshop, March 22, Halifax, Nova Scotia

1. Review the reporting spectrum associated with pest risk analysis. 2. Discuss existing PRA reports Examples of regulatory versus non-regulatory approach Review differences and similarities

Reporting is a continuum which occurs throughout the pest risk analysis process with a continual feedback loop. Higher frequency of reporting/correspondence at onset s, conference calls, etc Followed by less frequent reporting in the interim workshop reports Final product is pest risk analysis report.

Sustaining momentum through time “touchstones” Precipitating buy-in to core “RA team” Transparency to stakeholders Accountability for participants Opportunity to refine objectives/scope

 Mechanism for communication  Reflects the RA process, rather than guide the RA process  Reflects the audience, urgency and state of knowledge  MPB politically-driven, urgent, little information (boreal forest)  eSBW operationally-driven, longer time frame, lots of information  Report format can vary provided procedures are consistent with principles and guidelines

 Report formats generally based on International Plant Protection Convention (IPPC) International Standards for Phytosanitary Measures (IPSM)  IPSM No. 11 – PRA for quarantine pests  IPSM No. 21 – PRA for regulated non- quarantine pests

1.CFIA  Plant Health Risk Assessment template, consistent with international guidelines  BSLB, EAB, etc 2. NFPS  2007 MPB risk assessment

PREFACE EXECUTIVE SUMMARY STAGE 1: INITIATING THE PROCESS 1.1 REQUEST PURPOSE PRELIMINARY RISK PROFILE PREVIOUS PRA, CURRENT STATUS AND PERTINENT PEST INTERCEPTIONS STAGE 2: PEST FACT SHEET STAGE 3: PEST SPECIFIC PRA 3.1 HAZARD IDENTIFICATION 3.2 GEOGRAPHIC AND REGULATORY STATUS 3.3 LIKELIHOOD OF INTRODUCTION 3.4. ECONOMIC IMPORTANCE CRITERIA Rating CONSEQUENCES OF INTRODUCTION ESTABLISHMENT POTENTIAL NATURAL SPREAD POTENTIAL POTENTIAL ECONOMIC IMPACT POTENTIAL ENVIRONMENTAL IMPACT 3.5 CONCLUSION Components

Pest Risk Assessment Pest Risk Communication Components PREFACE EXECUTIVE SUMMARY STAGE 1: INITIATING THE PROCESS 1.1 REQUEST PURPOSE PRELIMINARY RISK PROFILE PREVIOUS PRA, CURRENT STATUS AND PERTINENT PEST INTERCEPTIONS STAGE 2: PEST FACT SHEET STAGE 3: PEST SPECIFIC PRA 3.1 HAZARD IDENTIFICATION 3.2 GEOGRAPHIC AND REGULATORY STATUS 3.3 LIKELIHOOD OF INTRODUCTION 3.4. ECONOMIC IMPORTANCE CRITERIA Rating CONSEQUENCES OF INTRODUCTION ESTABLISHMENT POTENTIAL NATURAL SPREAD POTENTIAL POTENTIAL ECONOMIC IMPACT POTENTIAL ENVIRONMENTAL IMPACT 3.5 CONCLUSION Risk Management Document (RMD) separate document

Components

Risk Response Risk Communication Components Risk Assessment

Some differences in style, content, and approach CFIA has template and standard procedures due to invasive context and potential regulatory implications

PREFACE EXECUTIVE SUMMARY STAGE 1: INITIATING THE PROCESS 1.1 REQUEST PURPOSE PRELIMINARY RISK PROFILE PREVIOUS PRA, CURRENT STATUS AND PERTINENT PEST INTERCEPTIONS STAGE 2: PEST FACT SHEET STAGE 3: PEST SPECIFIC PRA 3.1 HAZARD IDENTIFICATION 3.2 GEOGRAPHIC AND REGULATORY STATUS 3.3 LIKELIHOOD OF INTRODUCTION 3.4. ECONOMIC IMPORTANCE CRITERIA Rating CONSEQUENCES OF INTRODUCTION ESTABLISHMENT POTENTIAL NATURAL SPREAD POTENTIAL POTENTIAL ECONOMIC IMPACT POTENTIAL ENVIRONMENTAL IMPACT 3.5 CONCLUSION Style and Content

Approach

CFIA has a sophisticated and fixed rating system which describes and scores levels of risk. Negligible to High (0 to 3) 1. Guidelines for Rating the Likelihood of Introduction: Rating = negligible (numerical score is 0): The likelihood of introduction is extremely low given the combination of factors including the distribution of the pest at source, management practices applied, low commodity volume, low probability of pest survival in transit, low probability of contact with susceptible hosts in the PRA area given the intended use, or unsuitable climate. Rating = low (1): The likelihood of introduction is low but clearly possible given the expected combination of factors necessary for introduction described above. Rating = medium (2): Pest introduction is likely given the combination of factors necessary for introduction described above. Rating = high (3): Pest introduction is very likely or certain given the combination of factors necessary for introduction described above. CFIA Ratings

Overall Risk Rating reflects the Likelihood of Introduction and Consequences of Introduction

‘Provocative’ Statement Knowledge Synthesis Uncertainty Information Needs MPB –Likelihood of range expansion Approach

1. Nature of the threat Distribution of pine Pl, Pj and hybrid across Canada i.e. hazard 2. Likelihood of range expansion 7 statements supported by knowledge synthesis i.e. evidence, and identification of uncertainty and information needs 3.Consequences of range expansion 6 statements as above 4. Response The need for a response Control effectiveness Response options Analysis Approach

Need for a fixed reporting style or template for native pests ? Necessary components should include: triggers objectives scope likelihood of 0ccurrence consequences of occurrence risk response (even if no response) Optional components include: Executive summary, introduction, conclusions Uncertainties, information needs

Identify the reason for the PRA i.e. initiation Observed or expected increase in risk from a resident pest Shift in forest land use including conversion to alternative tree species Change in potential for invasion by alien pest Public demand or legislation e.g. timber supply or forest management review, regulatory needs, threats to protected environments or species at risk, etc.

Nature of the risk or threat Biological attributes of the organism and evidence of ability to cause injury Geographic or ecological scope Uncertainties and information needs

Provide evidence, uncertainty and information needs. Susceptibility, suitability of environment, biological attributes of pest that increase the risk including rate of spread Identify spatial and temporal variation in these risks Uncertainties and information needs

Provide evidence, uncertainty, information needs Socioeconomic, ecological or regulatory impacts Identify spatial and temporal variation in these risks