ONTARIO ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013

Slides:



Advertisements
Similar presentations
Reliability in British Columbia
Advertisements

Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Indian Environmental General Assistance Program (GAP) Guidance on the Award and Management of General Assistance Agreements for Tribes and Intertribal.
Producing energy does not have to threaten the environment. In fact, its very production can reap major environmental benefits. The United States biomass.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
A Multimodal Goods Movement Strategy for Ontario Canada-United States Transportation Border Working Group Fall Plenary November 7 – 8, 2012 James Perttula.
Environmental Assessment in Nova Scotia
ONTARIO AND BC ENVIRONMENTAL ASSESSMENT LAW MARCH 21, 2013.
Federal EA and the Canadian Environmental Assessment Act, 2012 Presentation to the Bras d’Or Lakes Collaborative Environmental Planning Initiative (CEPI)
Responsible Resource Development April 17, Context Government focussed on responsible development of Canada’s natural resources to create jobs and.
The Canadian Environmental Assessment Act 2012 and Aboriginal Consultation November 2012.
Ontario Jennifer Keyes/Kevin Edwards OMNR GLWC Offshore Wind Workgroup
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Saskatchewan P3 Summit 2014 Regina, SK Achieving better value, timeliness and accountability through public-private partnerships September 9, 2014 John.
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Planning for Energy Development in Canada Allan Ingelson, University of Calgary March 14, 2014.
Jfkdlsafjkdljflkajfklasjfkldsjflkjflksdjflkdsjfldsjfl kjflkjflkdsajflkdsjflkdsjflkdsjflksjfdlksjfdkslfjkl dsjfkldsjfldksjdsklfjkdlsfjdklsjaflkdjskdjfkdlsjk.
TOWNSHIP OF BECKWITH OFFICIAL PLAN REVIEW OFFICIAL PUBLIC OPEN HOUSE: AUGUST 24, 2010 OPEN HOUSE NO. 3 AGENDA  What is an Official Plan?  The Official.
Planning Permission Process and Procedures
Environmental Impact Assessment Myriam Raiche November 8, 2007.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Wenxin Zhang Department of Civic Design University of Liverpool
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
SEA of the Madrid transport plan A case study Ref: Arce & Gullon 2000 Rob Verheem The Netherlands EIA Commission.
Federal Energy and Environmental Regulation Agencies and Laws
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
CEAA REGULATIONS AND PROCESS OPTIONS SEPTEMBER 24, 2012.
IAIA 2007, Seoul, South Korea Detroit River International Crossing Project Navigating the Multi-Jurisdictional Maze for a Large-Scale Transportation Project.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Canadian Experience in Implementing the North American Emission Control Area (ECA) Mexico City, Mexico May 19, 2015.
Getting Oil sands to Market Pipeline development must be supported by world class environmental response systems and a balanced risk-return structure.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
Is an environmental assessment required? November 15, 2012.
Compliance and Enforcement Priorities and Successes in Indonesia 2008 AECEN Regional Forum November 25, 2008 Bali, Indonesia Rosa Vivien Ratnawati MINISTRY.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
Environmental Assessment at a Crossroads Stephen Hazell December 5, 2012.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
Ontario’s Future Energy Plan Abridged. Ontario’s Electricity Accomplishments Until 2003, ___% of electricity generation came from polluting.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
PUBLIC PARTICIPATION IN ENVIRONMENTAL ASSESSMENT MARCH 15, 2012.
California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital Region.
Ontario Waterpower Policy Initiatives The importance of being earnest Paul Norris President Ontario Waterpower Association.
ENVIRONMENTAL ASSESSMENT AND ABORIGINAL LANDS AND PEOPLES NOVEMBER 5, 2012.
OLDMAN DAM: ENVIRONMENTAL ASSESSMENT AND THE CONSTITUTION FEBRUARY 13, 2012.
Canada’s Federal Environmental Assessment Regime Presentation to the Forum of Federations Environmental Assessment Conference Ottawa, Canada September.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
INTRODUCTION CANADIAN ENVIRONMENTAL ASSESSMENT ACT (CEAA) FEBRUARY 16, 2012.
Environmental Assessment Act – Overview Environmental Media Group.
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
Sustainable public transport – electric transport development project for the capital.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Policymaking for Health Care and the Environment Chapter 19.
OLDMAN DAM: ENVIRONMENTAL ASSESSMENT AND THE CONSTITUTION SEPTEMBER 17, 2012.
CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Greater Toronto Transportation System
Allington Waste Management Facility
GREENHOUSE GAS EMISSIONS INVENTORY
Environmental Impact Assessment (EIA) in New Brunswick
Environmental Assessment and Licensing (EAL) in Manitoba
Presentation transcript:

ONTARIO ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013

Overview: Environmental Assessment Act (Ontario) Application of EAA Preparation of Terms of Reference and Environmental Assessment EA Hearing Process Class Environmental Assessments Ontario Hydro DSM EA) Public participation (Intervenor Act)

Application of Environmental Assessment Act (Ontario) Enacted in 1975, substantially amended in 1996 Aka “Environmental Exemptions Act” Purpose: “the betterment” of the people of Ontario by providing for the “protection, conservation and wise management” of the environment s. 2

Application of Environmental Assessment Act (Ontario) Requires proponents to Consider range of reasonable alternatives Assess environmental effects of alternatives Demonstrate that preferred alternative is environmentally superior and necessary Minister of Environment has overall authority (EA and Approvals Branch) Broad definition of “environment” (biophysical, socio-economic, cultural and their interrelationships) s.1.(1)

Application of Environmental Assessment Act (Ontario) Distinguishes between public and private sector proponents Applies to public sector undertakings unless exempt by order/regulation s.3.(c) Doesn’t apply to private sector undertakings unless designated by regulation, voluntarily included s. 3.0.1 Minister authorized to dispense with statutory requirements to harmonize with other jurisdiction s. 3.(1)

General Regulatory Exemptions Renewable energy projects Municipal undertakings less than $3.5 million Drainage works Some waste disposal sites (pilot projects, mobile PCB destruction facilities) Subdivision agreements Undertakings by conservation authorities Financial assistance programs Research undertakings

Other Regulatory Exemptions Project-specific Exemptions Other municipal and provincial undertakings Long-term Electricity Supply Plan Sectoral Exemptions Electricity Projects Regulation Waste Management Projects Regulation Transportation Authority Undertakings Regulation

Class Environmental Assessments 11 categories of Class EAs (municipal roads, forest management activities, commuter rail stations) Represent 90% of undertakings subject to EAA Provides for pre-approval of undertaking, self-regulation Authority to “bump up” Class EA undertaking to individual EA rarely exercised

Process for Individual Environmental Assessments Intended for “large-scale, complex undertakings with the potential for significant environmental effects and major public interest” (Ministry of Environment website)

Process for Individual Environmental Assessments Proponent submits terms of reference for public consultation, Ministerial approval Proponent submits environmental assessment Ministry coordinates public, Aboriginal, community, government comments Ministry prepares Ministry review Public inspection of Ministry Review Minister’s decision (or referral for hearings) Proponent implements projects and monitors for compliance

Public Hearings EAA empowers Minister to refer an application to Environmental Review Tribunal for public hearing/decision Public hearings held for high-profile undertakings: landfills, incinerators, highways, timber management, provincial energy demand-supply plan Only 2 hearings since 1996

Ontario Energy Demand-Supply Hearings Ontario Hydro 25-year Demand /Supply Plan (DSP) Report released in 1989 DSP projected a supply/demand gap opening up in mid-1990s, reaching 9,700 MW by 2005 DSP proposed several additional nuclear, coal-fired generation plants

Ontario Energy Demand-Supply Hearings DSP referred to EAA hearings by Environmental Assessment Board Persuasive evidence at hearings that energy demand growth overestimated (total demand in 2009 same as 1989) DSP revised in 1992 then abandoned Hearings lasted several years—longest in Ontario history

Ontario Energy Demand-Supply Hearings No additional generating facilities built saving Ontario taxpayers billions Yet DSP hearings considered a failure due to their length and cost

Ottawa River Bridge and Highway Corridor Project National Capital Commission proposed new bridge across Ottawa River, 6-lane highway corridor linking Highway 417 in Ottawa and Autoroute 50 in Gatineau Estimated cost (2008) of $500-600m Corridor options: Kettle Island (8.5 km) Lower Duck Island (12 km) Gatineau Airport/McLaurin Bay (12 km)

Ottawa River Bridge and Highway Corridor Project

Ottawa River Bridge and Highway Corridor Project Stated purpose to divert some heavy truck traffic from King Edward corridor No transportation study completed to assess level of diversion Second purpose to provide more access to Ottawa for Gatineau auto commuters

Ottawa River Bridge and Highway Corridor Project Environmental threats worse for Kettle Island due to higher population density in quiet, well-established neighbourhood Truck noise and pollution Increase in automobile traffic in Ottawa from Gatineau Increased burning of fossil fuels, increased greenhouse gas and other air emissions Urban sprawl in Gatineau

Ottawa River Bridge and Highway Corridor Project NCC commenced screening under CEAA, which was terminated when CEAA 2012 came into force CEAA 2012 would not apply NCC planned to conduct ad hoc EA EA hearings required in Quebec by Bureau d’audiences publiques sur l’environnement (BAPE)

Ottawa River Bridge and Highway Corridor Project Ontario: EAA didn’t apply although declaration for non-application procedure not been employed Agreed that all three options for bridge and highway corridor undertakings under EAA, no regulatory exemption EAA would not apply as Ontario is not a "proponent" but only "partner“ “Undertaking” not “proponent” triggers EAA

Ottawa River Bridge and Highway Corridor Project Possible application for judicial review against Ontario? Judicial confirmation needed that Ontario must apply EAA to undertakings proposed by public sector proponents unless exempted Moot because City of Ottawa and Ontario abandoned project in 2013 on account of expense

Why the rush to evade Ontario Environmental Assessment? Costs of EA? Does carrying out analysis of alternatives make EA work in Ontario more onerous than CEAA 2012 EAs or those of other provinces? Other statutory schemes such as Planning Act duplicate EAs? Other provinces rushing for the EA exits as well

Why the rush to evade Ontario Environmental Assessment? What about wind projects in Ontario? Fracking in Quebec and New Brunswick? Offshore oil and gas development? Is growing civil unrest due to weak EA regimes? Lack of public participation in decision-making?