CONTINUAL IMPROVEMENT

Slides:



Advertisements
Similar presentations
Total Productive Maintenance
Advertisements

Lean Manufacturing.
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Understanding 5S.
5S training Office Environments.
5S BASIC TRAINING What is 5S and why do we want to do it?
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Welcome. Slides and a recording of the presentation will be available on our blogs at:
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Introduction to 6S.
Stability & Standardization. 7 Types of Waste7 Types of Waste  Motion (Unnecessary movement)  Waiting  Transportation or conveyance  Storage (Excess.
JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
The Seven Forms of Waste
Lean operations and JIT
Introduction to 5S. What is 5S? An easy definition is: Finding a place for everything and putting everything in its place. 5S is also the foundation for.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Lean Principles First, let’s investigate Lean Principles.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Introduction to Kaizen
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
What is DOWNTIME? Scott Thor © Variance Reduction International, Inc. (VRI), All Rights Reserved.
A Workplace Organization Method
Philosophy and Key Concepts
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
Lean is a business system that focuses on doing only those things that add value to the customer, creating continuous one piece flow, and placing a high.
Lean Manufacturing Visual Systems XYZ Company.
Total Productive Maintenance (TPM)
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
HOME Copyright EASE Inc Tutorials© The “5S” Philosophy An EASEworks® Manufacturing Tutorial START Ver 6.
Business Policy & Strategy: Chapter Nine Production Murdick, Moor, Babson & Tomlinson Sixth Edition, 2000.
The Triple Bottom Line Approach – Productivity Component Kai Bethke 12 June 2007.
6 S System The Visual Workplace Directorate of Training and Education
Version 3.0.
Just In Time Manufacturing Push Manufacturing vs. Pull Manufacturing Push System: Traditional production system as parts are processed based on the master.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
Lean operations and JIT
COMPUTER INTEGRATED MANUFACTURING
Lean Manufacturing Basic Overview XYZ Company.
Introduction to Lean Emily Varnado.
SUPPLY MODELS JUST-IN-TIME
Pricing your Products to be Profitable
Welcome to my presentation
MODERN TRENDS IN PRODUCTION ENGINEERING
Lean and Quality Management Basics of Lean Management
Industrial Engineering Department, Dokuz Eylul University, Turkey
METHOD OF WORK PLACE ORGANIZATION AND VISUAL CONTROLS
Japanese Production Methods
Competing in the Marketplace
5 S.
5S A Workplace Organization Method
Presentation transcript:

CONTINUAL IMPROVEMENT LEAN MANUFACTURE AND CONTINUAL IMPROVEMENT By Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved

The Need for Continual Improvement The need to reduce costs

CONTINUAL IMPROVEMENT THE CUSTOMER WANTS: ONLY what is needed AS much as is needed WHEN it is needed ANYTHING MORE IS WASTE

What we need to do: 100% right first time The right cost that affords the company a reasonable profit 100% on time

What is lean Manufacturing AIM Lean production is aimed at the elimination of waste in every area of production including workshop management GOAL To incorporate less human effort, less inventory & less space To become highly responsive to customer demand while producing top quality products in the most efficient and economical manner possible.

Lean Manufacturing Objectives Lower the cost of production by streamlining the process Reduce time spent on “NON VALUE ADDING” activities Focus on “VALUE ADDING “ activities Eliminate all forms of waste from the process Understand and move towards the concept of “ZERO” Zero defects Zero inventory Zero delay Zero downtime Aim:

Lean Manufacturing Objectives GOAL To become highly responsive to customer demand while producing top quality products in the most efficient and economical manner possible.

Three Divisions of Work VALUE ADDED: Any process that changes the nature, shape or characteristics of the product, in line with customer requirements. (Maximise) WASTE: All other meaningless, non essential activities (Eliminate) NON VALUE ADDED: Any work carried out which is necessary under current conditions but does not increase product value. (Minimise)

Quality Cost Delivery Q C D The 3 criteria for assessing the production performance of a company: Quality Cost Delivery

The 7 Q C D Measures The 7 measures of Quality, Cost and Delivery are: 1. Not Right First Time 2. Delivery Schedule Achievement 3. People Productivity 4. Stock Turns 5. Overall Equipment Effectiveness 6. Value Added per Person 7. Floor Space Utilisation Primary impact Secondary impact

Process Improvement Spirit Challenge all fixed ideas Do it now! No excuses Get to the root cause by repeatedly asking why? (5 Whys) Improvement is infinite Better is not good enough (Continual Improvement)

The first building block of continual improvement 5S Made Easy: Seiri = Sort Seiton = Set in Order Seiso = Shine Seketsu = Standardise Shitsuke = Sustain The first building block of continual improvement

Continuous Improvement Improvement Activity Standard Ops. Visual Management 7 Wastes 5S The first building block of continual improvement

Workplace Organisation and 5S Sort Only have in the area that which is required Set in Order A place for everything & everything in its place Shine Determine the current condition of a machine or area and maintain it in good clean working order Standardise Ensure the current standard is maintained & improved Sustain Every employee understands the benefits & contributes to the improvement and endeavours to continually do so

5S – The Aim Sustainable Continual Improvement To promote a safe working environment To improve the organisation & standards of the workplace Create the best environment in which to produce a product Leads to a more efficient operation of the workshop or office Sustainable Continual Improvement

5S - Sort

Workplace Organisation; 5S Set in Order “A place for everything & everything in its place”. Aim: To Create the best environment in which to produce a product.

5S - Shine (Clean & Check) Aim: To determine the current condition of a machine or area and maintain it in good working order How: Manually clean from top down, identify/tag concerns Safety Critical items Quality Critical items Broken items etc. Equipment: Rags, Brushes, Brooms, Buff tags, Degreaser, Gloves, Safety Glasses, Photographs

5S - Standardise Aim: Ensure that the current standard is maintained and improved How: Make it easy to maintain Daily checklist and visual standards Establish clear responsibilities Audits Introduce to other operators/shifts Equipment: Photographs Checklist

5S - Sustain Every employee follows the rules and understands the benefits and contributes to the improvement.

Line Before 5S

Line After 5S

Visual Management

Continual Improvement The 7 Wastes

The 7 Wastes The second building block of continual improvement Improvement Activity Standard Ops. Visual management 7 Wastes 5S The second building block of continual improvement

7W – 7 Types of Waste Overproduction Inventory Transportation Process Producing more than the customer demands Inventory Stocks of raw material, work in progress and finished goods Transportation Unnecessary moving or handling of parts Process Excessive movement in process cycle Idle Time Operator inactivity during cycle Operator Motion Any unnecessary or walking, bending, turning and reaching Bad Quality Producing scrap parts & Reworking of parts

7W – The Elimination of Waste Identify, Categorise and Eliminate all waste and reduce costs How: Identify bottlenecks and remove them Reduce set-up times (SMED) Reduce downtime (TPM) Reduce – rework Reduce “dead” time Produce and purchase only what is needed (JIT)

7W - Overproduction What? Examples: Why? Producing more than the customer demands Examples: Manufacturing ahead of customers schedule Over running an unstable process Why? Hides manufacturing problems Creates inventory resulting in ALL other wastes Consumes resources ahead of schedule

(Stocks of raw material, work in progress and finished goods) 7W - Inventory (Stocks of raw material, work in progress and finished goods) After Before

7W - Transportation What? Why? Unnecessary moving or handling of parts Handling equipment moving with no parts Raw material batch sizes not matching production batch size Why? Transportation does not add value

Previously 8 Journeys reduced to 2 Journeys 7W - Transportation (Unnecessary moving or handling of parts) Paint Shop can now spray everything on the trailers. Previously 8 Journeys reduced to 2 Journeys

7W - Process What? Why? Excessive set-up or downtime (SMED) Inappropriate processes Excessive movement in process cycle Why? Because it does not add value

7W – Idle Time What? Why? Operator inactivity during cycle Machine inactivity during cycle Why? When an operator or machine is idle, no value is being added to the product

7W – Operator Motion What? Why? Any unnecessary or walking, bending, turning and reaching Why? These activities do not add value to the product

(Any unnecessary or walking, bending, turning and reaching) 7W – Operator Motion (Any unnecessary or walking, bending, turning and reaching) OLD WAY NEW WAY

7W – Bad Quality What? Why? Producing scrap parts Reworking of parts It interrupts scheduled production It consumes resources Extra overtime to replace bad quality production

If you would like to know more about Lean Production systems please contact us for a no obligation discussion Beta Management Systems Copyright© 2011 Beta Management Systems - All Rights Reserved