18 February 20091 Anaerobic Digestion On-farm AD Planning Permission and Environmental Permitting.

Slides:



Advertisements
Similar presentations
Relu Data Support Service, UK Data Archive
Advertisements

Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
1st Network Meeting Introduction Mark Allen, Assistant Director, Environment and Waste, Norfolk County Council 11th November 2011.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Environmental Impact Assessment for Waste Treatment Options
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013.
Forest of Bowland AONB Renewable Energy Position Statement.
ADBA PERMITTING WORKSHOP 27 March 2013 Stephen Barnes, Technical Director, Wardell Armstrong.
TAG Farnborough Airport. TAG Farnborough Airport Today.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Panel 3D = XML file pointer 08/09/20091 LHCb calorimeter meeting (jean-luc PANAZOL)
Rushcliffe Borough Council Development Management Process Changes to Planning Legislation Andrew Pegram Service Manager, Communities February 2015.
Copyright 2009 Northumberland County Council Northumberland Local Plan Core Strategy Update Riding Mill Parish Council 28 April.
Brook Cottage Consultants Habitats Directive Nitrogen Deposition and Wealden Planning Policy Planning for Better Air Quality St Martins - in - the - Fields.
Draft Policy Overview Utilities & Renewable Energy Planning Study Presentation By: Tim Cane, The Jones Consulting Group Ltd. November 12, 2008 Township.
Planning Permission Process and Procedures
Comhairle Contae Maigh Eo Mayo County Council PERMITTING OF ENERGY PROJECTS A Local Authority Perspective Iain Douglas Senior Planner Engineers Ireland.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Energy National Policy Statements Nick Cooper DECC.
Environmental Permitting Regulations Tom Fowler – Environment Officer
WELCOME. AT RISK SITES PROPOSED NEW ESTATE MAIN PROBLEM PROPOSED PLANNING APPLICATION BY MITFORD ESTATES 350 Houses Truck Stop Hotel Pub Retail Provision.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
1 rpsgroup.com/uk Planning and development at visitor attractions: how to navigate the latest changes. Nick Laister, RPS.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Aberdeenshire Local Development Plan 2016 Identification of issues.
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
Development Management Objective to promote proper planning and sustainable development and adopt a pro-active approach towards development that accords.
Langdon Parish Council Site Allocation Consultation Two sites at East Langdon One site at Green Lane, Martin Mill.
Wootton Wawen Neighbourhood Plan Wootton Wawen Neighbourhood Plan Welcome Survey feedback Current status of activities What next?
Numbers not Adjectives Kt 9 % 2011 e 891 Kt 21 % Kt Based on NI186 data for Winchester District with motorway emissions removed.
TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
PLANNING, TRANSPORTATION & ESTATES WASTE PLANNING ISSUES Mark Jones Deputy Director.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
Environment Agency Regulation and support for business Richard Penn Environment Planning and Engagement Manager.
Sustainable Development and Neighbourhood Plans Chris Gooding and Bill Bloxsome Data Orchard/Community First.
Welcome. Wind Turbines & Solar Farm Update Nationally: What the Government are saying Eric Pickles issued new guidelines stating that local communities.
Know your Community Rights Localism 6 months on Neighbourhood Planning Collecting the Evidence Alyson Linnegar 16 November 2012.
Muston planning for Bath & North East Somerset Council 1 July 2015 Councillor Training – Planning Mike Muston – Muston Planning muston planning.
Valuing Wealden’s heritage. National Planning Policy Framework Sets out the planning policies for England and how these are to be applied. “The purpose.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
19th November 2015 Wealden Local Plan – Issues, Options and Recommendations East Hoathly with Halland Parish Council.
Tipperary County Council ‘Energy in Agriculture 2016’ Gurteen Agricultural College, Tuesday 23 rd August Renewable Energy - Planning Issues Nuala O’Connell,
Ascending to IED compliance
Legislation Carl James.
Rye House Energy Recovery Facility
Broadclyst Neighbourhood Plan
Veolia Rye House Energy Recovery Facility
Allington Waste Management Facility
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
Tony Almond Onshore Oil and Gas Policy Health and Safety Executive
Wealden Local Plan Presentation to East Sussex Strategic Partnership
Ascending to IED compliance
MPO School Transportation Working Group
Shaping the future of Laverstock and Ford Parish
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF HIGHWAY PROJECTS
Presentation transcript:

18 February Anaerobic Digestion On-farm AD Planning Permission and Environmental Permitting

18 February What is a planning permission? Authorisation to carry out development Planning conditions Role of the planning application Enforcement

18 February What is ‘permitted development’? GPDO 1995 Part 6 - Agricultural Buildings and Operations Waste industry PD

18 February Why does AD need planning permission? The deposit of waste material on land involves a material change of use and is therefore development Engineering works and buildings are also development Changes that may need either a new permission or variation of an existing permission Increase in volume - extra traffic movements; additional environmental impacts Increase in area Additional facilities - weighbridge, buildings including portable units

18 February Is your site physically suitable? Distance from sensitive receptors - how close are your neighbours?; Surface and groundwater sensitivity - are you near a river/stream; are you above an aquifer?; Flood risk - is the site at risk of flooding?. Landscape - are you in an area designated for its landscape value e.g National Park, AONB? Visual - will the development be seen by many people? Traffic - can the local road network accommodate heavy goods vehicles Access - is the access in to the site adequate or could it be improved without requiring land from third parties?

18 February Is your site physically suitable? Ecology - are you near a NR, SSSI, SAC, Ramsar site; do you have protected species onsite or nearby; is the land affected likely to contain a habitat of local significance? Noise, dust, odours, bioaerosols - can you contain these impacts; are you far enough from sensitive receptors not to cause a nuisance? Archaeology - is the site likely to have evidence of previous settlement? Ancient Monuments, listed buildings- are you close to historic features that might be adversely affected by the development? Conservation Area - are you in or close to a designated area?

18 February National Waste Strategy 2007 and Energy White Paper 2007 Are you in the Green Belt? What does the latest local plan/development document say about AD and Renewable Energy? Is there a need for a facility in your location? Is there a large enough source of suitable waste within a catchment area of miles? What will you do with the digestate? Does your site comply with planning policies?

18 February Will you need to do an Environmental Impact Assessment? Schedule 1 development - mandatory Schedule 2 development - discretionary Paragraph 3 (a) - Energy projects: area exceeds 0.5 hectare Paragraph 11(b) - Other installations: area exceeds 0.5 hectare; is within 100m of a controlled water; Circular 2/99 Guidance Power stations - EIA is unlikely for low output units Waste operations - EIA is more likely where inputs are more than 50,000 tonnes per annum or the site is more than 10 hectares.

18 February Improving your chances of getting Planning Permission Demonstrate compliance with planning policies Demonstrate that the operations are unlikely to cause nuisance to the neighbours or to environmental factors of significance Before submitting your planning application, involve the neighbours, Parish Council, Local Councillors, Environment Agency Officers, Environmental Health Officer, District and County Planning Officers Run an open day at the site Offer to take interested persons to see an existing operation Talk to the local press

18 February Environmental Permitting EP can only be issued if planning permission has been granted Bespoke Permit requirements EPOPRA speadsheet - fees Detailed Site Management Plan, including Accident Management Plan Detailed technology description, explaining how emissions are controlled at each stage Fit and Proper Person test Technical competence Environmental prosecutions and Environmental Management System Financial probity

18 February Contact details for advice or further information: Mill House, Long Lane, East Haddon, Northamptonshire NN6 8DU Tel: Fax: Website: