Best Value Procurement MnDOT State Aid for Local Transportation Minnesota Local Road Research Board MnDOT Office of Construction and Innovative Contracting.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
Tendering Yuck!.
GSA Public Buildings Service How to Submit a Proposal.
USDA Child Nutrition Programs.  Procurement (purchasing rules) must apply to all purchases that are supported, in whole or in part, with non-profit food.
BEST VALUE PROCUREMENT. What is BVP? A procurement process where price and other key factors can be considered in the evaluation and selection process.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Presented by: Kathryn Hodges, NH
Insert software product logo (or name) on slide master AASHTO Civil Rights and Labor Management System Executive Summary.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
New Procurement Rules Training Purchases Greater Than $25,000.
Presented by Department of Finance Purchasing Division Cecelia H. Stowe, CPPO, C.P.M., Purchasing Director Eileen M. Falcone, Senior Buyer.
Procurement of Consultancy Services. 2 Differences between.
Marcy Mealy Procurement Specialist CDBG Program
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Procurement Lobbying Legislation New York State Bar Association December 9, 2005 (revised January 4, 2006)
1 CDBG Procurement Requirements For Local Officials.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Guiding principles for the Federal acquisition system
Eric R. Johnson Hillsborough County, (Tampa) FL
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Version 1.0– June 18, Leveraging the Texas Project Delivery Framework and.
To teach specification preparation  the importance of well-prepared specifications in procurement  the different types of specifications  basic writing.
Conservation Districts in New York Training Module 1.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 Office of the State Comptroller Bureau of Contracts Basics of Request For Proposal Procurement Presented by Nisha E. Thomas Elizabeth Jaggers Peter Vander.
Minnesota Manual of Accommodations for Students with Disabilities Training January 2010.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
A risk assessment is the process of identifying potential hazards an organization may face and analyzing methods of response if exposure occurs.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Contract Formulation and Administration
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Business System Development
State Aid Construction
Request for Proposal & Proposal
PROJECT DELIVERY METHODS
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
GPP Training Toolkit An Introduction European Commission
State Aid Construction
Slovak Republic - International Investment Bank Technical Assistance Fund
Presentation transcript:

Best Value Procurement MnDOT State Aid for Local Transportation Minnesota Local Road Research Board MnDOT Office of Construction and Innovative Contracting

Trainers Steve Howe, HNTB Corporation MnDOT GEC DB Consultant Mike Marti, SRF Consulting Group, Inc. LRRB Technology Transfer Specialist Guidance from OCIC DSAE

Additional Resources Previous LRRB deliverable focused on the basics of contracting, including: Contracting 101 Provides insight on good contracting principles Innovating Contracting Best Value Alternate Bid Bidder Qualifications

Training is based on MnDOT’s manual Developed by MnDOT’s Office of Construction and Innovative Contracting Technical Advisory Committee consisted of representatives from MnDOT, Local Governments, FHWA, Contractors and Consultants This is a workshop. Questions are encouraged as we go through the presentation.

Training is based on MnDOT’s manual Manual is intended to aid agencies in using the best value method to procure construction contracts. Seeks to promote a consistent procurement process for agencies and a consistent proposal process for construction contractors involved in best value procurement. This training has been developed for Minnesota Cities and Counties.

Training is based on MnDOT’s manual Specific objectives of the manual include: Provide baseline approaches that fit within MnDOT policies and state law. Provide guidance for determining when to use best value procurement. Provide guidance for completing a transparent best value process that is fair to both the agency and the industry. Highlight that MnDOT has only used BV once

What is Best Value Procurement? Traditionally, price has been the sole factor considered in the selection of construction contractors by government agencies. Best-value procurement allows other factors to be used in evaluation and selection: Qualifications Schedule Quality Performance-based criteria

What is Best Value Procurement? A procurement process where price and other key factors can be considered in the evaluation and selection process to minimize impacts and enhance the long- term performance and value of construction. National Cooperative Highway Research Program (NCHRP) Report 561 www.onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_561.pdf MnDOT process is not unique, it is based on this national resource

State Law for Best Value Procurement Minnesota Statute 16C. 02, 16C State Law for Best Value Procurement Minnesota Statute 16C.02, 16C.03 and 16C.28 In 2007, the Minnesota Legislature enacted a law that enables public agencies to select contractors based on best value, rather than low bid. The law applies to state agencies, cities, counties, and school districts.

State Law for Best Value Procurement Minnesota Statute 16C. 02, 16C State Law for Best Value Procurement Minnesota Statute 16C.02, 16C.03 and 16C.28 Any personnel administering procurement procedures for best value procurement must be trained. Law is not prescriptive as to what constitutes training - several organizations are offering. Applying Best Value procurement is a learning process. Taking one class does not make a person an expert. Discuss with audience the various options being offered for training: League of Minnesota Cities, Minnesota Construction Association Mention that the BV process is being watched very carefully, agencies should be cautious in their use; make sure they work closely with their attorneys

State Law for Best Value Procurement Minnesota Statute 16C. 02, 16C State Law for Best Value Procurement Minnesota Statute 16C.02, 16C.03 and 16C.28 Highlights of the law include: Price must be one of the evaluation criteria. Other criteria may include: Quality performance Timeliness of performance Customer satisfaction On-budget performance Ability to minimize change orders Ability to prepare plans Technical capacity Qualifications Ability to assess and minimize risks

State Law for Best Value Procurement Minnesota Statute 16C. 02, 16C State Law for Best Value Procurement Minnesota Statute 16C.02, 16C.03 and 16C.28 Performance on previous projects does not include the exercise or assertion of a person’s legal rights. Best value determination must be based on the evaluation criteria detailed in the solicitation document. If criteria other than price are used, the solicitation document must clearly state the relative importance of price and other factors. Mike M to interrupt, pause the discussion and emphasize these point. Make sure to explain: “Assertion of Legal Rights” Provide an example, i.e. change in condition on project (soil content) beyond contractor's control that would provide a accepted change order

Minnesota Statute 16C. 02, 16C. 03 and 16C. 28 Subd. 4a Minnesota Statute 16C.02, 16C.03 and 16C.28 Subd. 4a. Best value; construction. “Best Value" describes the result determined by a procurement method that considers price and performance criteria, which may include, but are not limited to: Quality of the vendor's or contractor's performance on previous projects Timeliness of the vendor's or contractor's performance on previous projects Level of customer satisfaction with the vendor's or contractor's performance on previous projects Vendor's or contractor's record of performing previous projects on budget and ability to minimize cost overruns Vendor's or contractor's ability to minimize change orders Vendor's or contractor's ability to prepare appropriate project plans Vendor's or contractor's technical capacities Individual qualifications of the contractor's key personnel Vendor's or contractor's ability to assess and minimize risks Recommended Possible MnDOT process has developed a set of recommendations of how THEY intend to use Best Value procurement, we recommend local governments follow the same: - “start slow, learn and grow” Potential Future

Minnesota Statute 16C. 02, 16C. 03 and 16C. 28 Subd. 4a Minnesota Statute 16C.02, 16C.03 and 16C.28 Subd. 4a. Best value; construction. "Best Value" describes the result determined by a procurement method that considers price and performance criteria. Recommended Performance Criteria Ability to prepare plans Technical capacity Qualifications Benefits: Challenges: Allows agency to require specific experience, certifications, capabilities, equipment or technical skills Easily structured as objective criteria Lowered risk of protested award May create barriers to contractors if requirements are unrealistic Give examples of the type of projects and/or qualifications that are acceptable

Minnesota Statute 16C. 02, 16C. 03 and 16C. 28 Subd. 4a Minnesota Statute 16C.02, 16C.03 and 16C.28 Subd. 4a. Best value; construction. “Best Value" describes the result determined by a procurement method that considers price and performance criteria. Possible Performance Criteria Ability to assess and minimize risk Ability to minimize change orders Benefits: Challenges: Allows contractor to identify, minimize or take on risks and/or assume responsibility for certain change order conditions Can reduce risk of cost and schedule overruns Relatively complex evaluation process is necessary Elevated risk of protest award Potentially may transfer risk to contractor that may increase project costs

Minnesota Statute 16C. 02, 16C. 03 and 16C. 28 Subd. 4a Minnesota Statute 16C.02, 16C.03 and 16C.28 Subd. 4a. Best value; construction. “…"best value" describes the result determined by a procurement method that considers price and performance criteria… On-budget performance on previous projects On-time performance on previous projects Quality performance on previous projects Customer satisfaction on previous projects Potential Future Performance Criteria Challenges: No objective measure is generally available to assess previous performance Ultimately should use a database of past performance Cannot include contractors exercising or asserting of legal rights per statute Significant increase in risk of protested award Can be politically challenging Benefits: Previous performance can be a good indicator of future performance Agency increases likelihood of success on the project Make sure to define “objective” and “subjective” Customer satisfaction on projects:  If there are details the owner desires, these need to be placed in the specifications and enforced.  The example of the local contractor is a good one (list the operations that are important and provide payment for these operations).   On-time and On Budget performance: Plan quality and changes play a huge role in this determination. We will want to give examples of both a contractor responsible delay and an owner. Kevin to add MnDOT discussion on attempt of “contractor ratings”, early 2000’s, concluded it was too subjective

Best Value Process must be: Justifiable Defensible Minnesota Statute 16C.02, 16C.03 and 16C.28 Subd. 4a. Best value; construction. "Best Value" describes the result determined by a procurement method that considers price and performance criteria. Best Value Process must be: Justifiable Defensible Discuss some qualifications that will not stand the test of being justifiable and defensible.  

The Process Offers… Provides another tool to address increasing pressure to deliver high- quality projects faster and more cost-effectively by allowing the award of contracts on factors other than low price. MnDOT has developed this simplified best value approach as a starting point to apply best value procurement. Start slow…the process may be expanded as your agency become more familiar with its use. A few Minnesota agencies have been implementing best value procurement over the past few years and have learned from their experiences. MnDOT’s one and only use occurred in 2011, four years since the law was in place….start slow, learn as you go…

What the Process Does Not Offer Cannot guarantee the success of a project. Should not be used as a vehicle for restricting competition or applying arbitrary or unreasonable discretion in the selection of contractors. Should not be used to resolve existing administration problems or remedy unclear specifications.

Project managers should be aware that Best Value Procurement….. May take longer than a traditional low-bid process, depending on how much time is provided to prepare proposals. May require additional agency effort for the preparation of bid documents and evaluation of proposals. May increase costs to the industry to prepare and submit bids. May increase the project cost if selection is based on higher quality or an increased effort by the contractor.

When to use Manual provides a series of questions to determine if a project is a good candidate. Ultimately it is a project management decision…is there enough benefit to the project to offset additional efforts required of the agency and contractors. When using State Aid funds, Local Governments must consult with their DSAE. MnDOT OCIC is also a resource. Call on DSAE that is attending and have them reiterate working with State Aid early within the process. Offer 10-15 minute stretch break……………………………

Overview of MnDOT BV Procurement Streamlined approach to best value procurement that can be applied to small to mid-sized projects. Intended for projects that have been advanced through final design Uses criteria based on what will most benefit the project and selects the low bid from proposals meeting the criteria. We realize there are many ways to use BV procurement, this is how we are recommending doing it TODAY….as we learn more it may expand Start slow and expand as you gain knowledge and experience

Definitions Non-Responsive Bidder – A bidder who fails to meet the proposal requirements, fails to submit the required elements of the technical proposal, or whose submittal fails to prove they meet the requirements of the project Special Provisions. Responsive Bidder – A bidder who meets the proposal requirements, submits the required elements of the technical proposal as defined in the project Special Provisions, and meets the pass/fail criteria for the work described in the project Special Provisions.

Overview of MnDOT BV Procurement MnDOT is using a detailed two-step process that is similar to Design-Build: During Phase 1, bidders submit technical proposals. MnDOT evaluates and shortlists responsive bidders. Phase 2 includes submittal of a sealed cost proposal by each responsive bidder. Cost proposals are opened. Apparent low bidder is lowest priced responsible bidder. That contractor then goes through the award and approval process.

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Follow the screening criteria outlined in Section 2 of the manual to determine if a project is appropriate for best value. Contact State Aid as early in the process as possible (recommended at 30% plan completion) for assistance.

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Projects that include federal funds require approval by FHWA to use best value. Each project must receive Special Experimental Project 14 (SEP-14) approval. Local governments considering BV for projects with federal or state aid funding must consult their DSAE to review their process. Emphasize that if using the process outlined here in the training, it is accepted by FHWA and will not require a SEP process…if deviating from this process, SEP -14 is needed.

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Early coordination with contracting industry will allow them to prepare and will increase competition. Contact MnDOT and leverage their ongoing meetings with the Association of General Contractors (AGC).

MnDOT Best Value Procurement Steps Recommend evaluation criteria: Qualifications of Personnel Experience of Personnel on Similar Projects Experience of Contractor on Similar Projects Availability of Key Personnel, Equipment or Materials Others will be discussed later in training Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Determine the pass/fail best value evaluation criteria that will be used in the procurement. Evaluation criteria should be based on the elements that will bring the most value to the project.   The following categories of evaluation criteria can be used with this approach: Qualifications of Personnel Certain work tasks may benefit from personnel with specific licensure, training, or certifications. Establish criteria  based on the needs of the project. Experience of Personnel on Similar Projects The personnel that will perform the work on the project should have experience on similar projects. Establish pass-fail criteria requiring minimum experience levels. Experience of Contractor on Similar Projects Experience with projects of a similar size, type or complexity may benefit the project. Establish pass-fail criteria requiring minimum experience levels. Availability of Key Personnel, Equipment or Materials Establish the required personnel, equipment or materials that will be necessary to successfully complete the project. Contractor will indicate availability of these items in the proposal. Ability to Meet Completion Date Establish project completion requirements and request contractor completion dates.   Make sure to discuss the merits of Pass-Fail, why to use (i.e. start slow/simple)

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Prepare a plans, specification and bid package…including Special Provisions. Important that all information for achieving a passing rating is clear and understood by the evaluators and contractors. Call on Kevin (or Kevin interject), to discuss MnDOT Special Provisions

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Advertise the project following normal advertising process for projects. This may require a longer time frame than low cost procurement (technical proposal review, etc).

MnDOT Best Value Procurement Steps Host a pre-bid meeting prior to the submission of the un-priced technical proposals and cost proposals. Attendance should be strongly encouraged for all bidders. Invite DSAE. Review proposal requirements in detail. Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award

MnDOT Best Value Procurement Steps Proposals are to be delivered in two parts: Technical proposals Cost proposals Technical proposals should be submitted at least two weeks prior to the cost proposals to allow sufficient time to review before opening cost proposals of responsive bidders. Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award All bidders that submitted a responsive technical proposal will be permitted to submit a cost proposal. All bidders that submitted non-responsive proposals will not be permitted to submit a cost proposal.

MnDOT Best Value Procurement Steps Select Project for Best Value Coordinate with FHWA Coordinate with State Aid (Local Governments) Coordinate with Industry Determine Best Value Criteria Prepare Request for Proposals and Final Design Advertise Project Pre-Bid Conference Receive Proposals and Bids Opening of Bids Selection and Award Bids will be opened at the time indicated in the Advertisement for Bids. The project will be awarded to the responsible bidder submitting the lowest bid price of those receiving a passing rating on the technical proposal.

Summary: Best Value Procurement Process must be: Justifiable Defensible Recommended Process Follows NCHRP and FHWA guidelines Start slow…expand with experience MnDOT manual available November 1 on the OCIC website Leverage available resources

Resources LRRB Innovative Contracting www.lrrb.org/pdf/2009RIC02.pdf NCHRP Report 561 www.onlinepubs.trb.org/onlinepubs/ nchrp/nchrp_rpt_561.pdf MnDOT Office of Innovative Contracting www.dot.state.mn.us/const/tools/inn ovativecontract.html MnDOT State Aid website Best Value statute Best Value Training PowerPoint Design Build statute Link to MnDOT Best Value Procurement Guide

Questions. For more information contact: Questions? For more information contact: MnDOT Office State Aid for Local Transportation Thank you and additional resource: MnDOT OCIC: Kevin Kosobud, kevin.kosobud@state.mn.us