Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.

Slides:



Advertisements
Similar presentations
The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
Advertisements

Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
JI Governance – review of JI Guidelines
Implementing Decision 10/CMP.7 CCS in the CDM Tim Dixon IEA Greenhouse Gas R & D Programme UNFCCC 1 st SDM Workshop 25 March.
Motoharu Yamazaki UNFCCC secretariat Fees under JI Track 2 Fourth meeting of the Joint Implementation Supervisory.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Ms. Daniela Stoycheva Chair of the JISC COP/MOP 2, Nairobi 14 November 2006 JI Track 2 procedure and its role in JI Track 2 projects UNFCCC Side Event.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Revision of key attributes and transitional measures relating to possible changes in the JI guidelines Wolfgang Seidel, Chair of the Joint Implementation.
1 Georg B ø rsting Chair of the JI Supervisory Committee Joint Implementation 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
Энергетический Углеродный Фонд JI Projects in the Russian Power Industry Mikhail Rogankov Chief Executive Officer acting Energy Carbon Fund Tel.: +7 (095)
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Status of Joint Implementation and Green Investment Scheme Vlad Trusca Ministry of Environment and Sustainable Development Romania - Annual meeting of.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Canada’s Experiences & Perspectives on Joint Implementation JI Technical Workshop, Bonn, 9-10 March 2006 Jeanne-Marie Huddleston, Canada’s CDM & JI Office.
Björn Zapfel UNFCCC secretariat JI section JI Track 2 Project Cycle Side event at COP/MOP 2: “JI Track 2 Project.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
Fatou Gaye Chair of Joint Implementation Supervisory Committee (JISC) Question and Answer Session – CMP 3 Nusa Dua (Bali), Indonesia, 4 December 2007 Joint.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Canada’s CDM & JI Office First UNFCCC Workshop on the Implementation of Article 6 Projects Under the Kyoto Protocol May , 2004 Moscow, Russia Canadian.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
16/10/20071 Methodological approaches regarding baseline setting and monitoring UNFCCC Technical Workshop on JI Bonn, November 2007 Lennard de Klerk.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
JISC – work accomplished and challenges ahead
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Role of Parties involved in JI-projects: Sweden
German Emissions Trading Authority (DEHSt)
JISC work regarding criteria for baseline setting and monitoring
Baseline setting and monitoring under Joint Implementation
Joint Implementation A Parties and Buyers Perspective
Standardized Baselines
Baseline setting and monitoring under JI compared to the CDM approach
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Theoretical differences between CDM and JI validation/determination
Small-Scale Projects Under JI
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Development of determination and verification manual (DVM)
Presentation transcript:

Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN

2 General - Prompt start and user friendly- Role and function of JISC and IE Baseline, Monitoring, and Additionality Small-scale Track 1 procedures Promising Projects For success

3 JISC: What is its Responsibilities Accreditation of IE Review of standards and procedures for AIE Review and revision of reporting guidelines and criteria for baseline and monitoring Elaboration of JI-PDD Review procedures for final determination Management plan

4 AIE Second Track All CDM-DOEs should be accredited automatically as IE under JI. First Track Independent validation/verification by either a domestic or UNFCCC accredited entity may be needed to support host countries to approve the project and to issue appropriate quantity of ERUs. But, Parties should provide appropriate guidance to avoid the unnecessary workload and transaction cost by the detailed investigation. Moreover, in the interest of cost savings and comparability, it is another option to apply the ISO's specification and guidelines (by ISO/TC207) for validation and verification.

5 Baseline and Monitoring Methodology general MA does not require the concept of “approved methodologies.” The methodologies approved by CDM should be fully utilized under Track 2 at a complete discretion of project participants. Better than nothing. New baseline and monitoring methodology should be determined by AIE, based on the national guidelines of the host countries and in accordance with MA. Standard baseline JI allows to establish a baseline by using “a multi-project emission factor”. For example, emission factors for replaced power generations by the grids is set as weighted average emissions of the generation mix for all the JI host countries. However, it should be left to project participants whether to use such emission factors.

6 Additionality Keeping “additionality” requirements may be OK CDM additionality tool The project should be considered as additional if the emission scenario is different from the baseline scenario. “A baseline shall be established: MA-CDM In a transparent and conservative manner regarding the choice of approaches, assumptions, methodologies, parameters, data sources, key factors and additionality, and taking into account uncertainty;” MA-JI In a transparent manner with regard to the choice of approaches, assumptions, methodologies, parameters, data sources and key factors;”

7 Small-scale JI Simplified methodologies for small-scale CDM projects should also be valid for JI. Should small-scale thresholds for JI projects be established, they should be consistent, e.g. 100K- ton/year, which will enable all types of projects to be treated equally. Type I Renewable Type II Energy efficiency Type III Others SSC thresholdMax output up to 15 MW Reduction of energy consumption up to15 GWh/yr Direct emission less than 15,000 t- CO2/yr max ER kt-CO2/yr12-9 kt-CO2/yr109 kt-CO2/yr CDM threshold and Max Emission Reduction of SSCs

8 Track 1 procedures COP/MOP, in its guidance regarding JI implementation, should expressly allow the Parties involved to establish Track 1 procedures by themselves.

9 Promising Projects Russia Capture of CH4 from gas distribution system Fuel Switching of Coal Power Plants New EU Member Countries Outside EU-ETS Wind Power Biomass CHP CMM

10 Factors for Success Application of CDM M&P and Documents All Rules, Procedures, and Documents should be SET UP until COP/MOP2 Clarify the responsibilities of JISC, Secretariat, Parties, IE, Project Participants, and Experts Good Communication Transparency and Accountability