ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA/MWR status Pierre Féménias ESA/ESRIN.

Slides:



Advertisements
Similar presentations
© Oxford University Press 2009 Quit Part 7 Global warmingAre humans responsible? 7.2What is the normal global distribution global distribution pattern.
Advertisements

Surface Water and Ocean Topography (SWOT) Satellite Mission
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Rossana Dragani Using and evaluating PROMOTE services at ECMWF PROMOTE User Meeting Nice, 16 March 2009.
2. The WAM Model: Solves energy balance equation, including Snonlin
The Wave Model ECMWF, Reading, UK.
Slide 1The Wave Model - Last part Validation of wind & wave analysis using satellite & buoy. Altimeters onboard ERS-1/2, ENVISAT and Jason Quality is monitored.
OVERVIEW OF THE IMPROVEMENTS MADE ON THE EMPIRICAL DETERMINATION OF THE SEA STATE BIAS CORRECTION S. Labroue, P. Gaspar, J. Dorandeu, F. Mertz, N. Tran,
Calibration Method of Microwave Tb for Retrieving Accurate SST Akira Shibata JAXA / EORC Advances of Satellite Oceanography at Vladivostok, Oct. 3-6, 2007.
Global Precipitation Precipitation averages just about 1 meter per year over Earth but, like wealth, varies widely from place to place and from time to.
Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case.
RA-2 & MWR QWG meeting – ESA/ESRIN – 24 March, 2003 Envisat RA-2 and MWR Events since October 2002 Pierre Féménias ESA/ESRIN.
RA-2 & MWR CCVT – ESA/ESRIN – 25 to 27 March, 2003 MWR Calibration & Validation status MWR Cal/Val team: Ngan Tran, Estelle Obligis, Laurence Eymard, Michel.
RA-2 S-BAND ANOMALY: DETECTION AND WAVEFORMS RECONSTRUCTION A. MARTINI (1), P. FEMENIAS RA-2 S-BAND ANOMALY: DETECTION AND WAVEFORMS RECONSTRUCTION A.
3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme.
6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting.
Verification of RA-2 Wind and Wave and MWR Water Content Products Peter Janssen and Saleh Abdalla ECMWF, Reading, UK.
Page - 1 RA2 CCVT meeting March 2003 F-PAC validation context CMA chain has to be inline with the algorithms approved by ESA and used for the prototype.
1 Verification of wave forecast models Martin Holt Jim Gunson Damian Holmes-Bell.
UPDATE ON BIAS TRENDS, DIRECT SUN CORRECTION, AND ROUGHNESS CORRECTION Joe Tenerelli May 10, 2011.
AN INITIAL LOOK AT THE IMPACT OF THE NEW ANTENNA LOSS MODEL Joe Tenerelli SMOS QUALITY WORKING GROUP #4 7-9 March 2011.
REVIEW OF OBSERVED BIAS TRENDS OVER THE OCEAN AND POTENTIAL IMPACT OF PROCESSOR EVOLUTION Joe & Nicolas IFREMER/CLS ESL Quality Working Group #5 May 30-31,
OMI ST meeting June 2008 Calibration & 0-1b data processing Marcel Dobber (KNMI)
Mapping Our World Cartography What is the equator? Latitude
26/11/2012 – Observatoire de Paris Analysis of wind speed evolution over ocean derived from altimeter missions and models M. Ablain (CLS)
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
David Prado Oct Antarctic Sea Ice: John N. Rayner and David A. Howarth 1979.
Temperature and Its Variation
Why the Earth has seasons  Earth revolves in elliptical path around sun every 365 days.  Earth rotates counterclockwise or eastward every 24 hours.
SAR Altimetry in Coastal Zone: Performances, Limits, Perspectives Salvatore Dinardo Serco/ESRIN Bruno Lucas Deimos/ESRIN Jerome Benveniste ESA/ESRIN.
Climatology Climatology is the study of Earth’s climate and the factors that affect past, present, and future climatic changes. Climate describes the long-term.
1.STSE 2.Objectives of today 3.Data availability 4.Reprocessing 5.RFI 6.Conferences & user meetings Introduction – SMOS mission status.
High Altitude Equatorial Clouds as Seen with the OSIRIS InfraRed Imager A.E. Bourassa, D.A. Degenstein, N.D. Lloyd and E.J. Llewellyn Institute of Space.
MWR Algorithms (Wentz): Provide and validate wind, rain and sea ice [TBD] retrieval algorithms for MWR data Between now and launch (April 2011) 1. In-orbit.
Spaceborne Weather Radar
Satellite basics Estelle de Coning South African Weather Service
Status GRACE Mission Operations 1 GSTM – Potsdam - 15 October 2007 Status GRACE Mission Operations Joseph G. Beerer, JPL Operations Mission Manager Franz-Heinrich.
Earth Science 17.3 Temperature Controls
HY-2A Satellite Altimetric data Evaluation in the Arctic Ocean Yongcun Cheng Ole Baltazar Andersen.
ODINAFRICA/GLOSS Sea Level Training Course
Proposed revision of ITU-R Recommendation providing EESS (active) Performance and Interference Criteria May 13, 2015 Committee On Radio Frequencies Thomas.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
Backward Forward Home Exit III. How do temperatures change over time and over place? 1. What are some common records of temperature? Mean daily temperatureMean.
Philip Moore Jiasong Wang School of Civil Engineering and Geosciences University of Newcastle upon Tyne Newcastle upon Tyne NE1 7RU
OSTST Hobart 2007 – Performance assessment Jason-1 data M.Ablain, S.Philipps, J.Dorandeu, - CLS N.Picot - CNES Jason-1 GDR data Performance assessment.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
MERIS US Workshop, Silver Springs, 14 th July 2008 MERIS US Workshop, 14 July 2008, Washington (USA) Henri LAUR Envisat Mission Manager.
Intercomparison of GlobVapour total column water vapour (TCWV) and Envisat RA2-MWR measurements (preliminary results) Bruno Picard (CLS), Jean-Rémi Deboer.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
Page 1 Validation Workshop, 9-13 th December 2002, ESRIN ENVISAT Validation Workshop AATSR Report Marianne Edwards Space Research Centre Department of.
CEOS Plenary Tokyo, 6 November 2015 Volker Liebig, ESA Director of Earth Observation Programmes ESA’s Future Earth Observation Missions.
The Variability of Sea Ice from Aqua’s AMSR-E Instrument: A Quantitative Comparison of the Team and Bootstrap Algorithms By Lorraine M. Beane Dr. Claire.
Validation of Satellite-derived Clear-sky Atmospheric Temperature Inversions in the Arctic Yinghui Liu 1, Jeffrey R. Key 2, Axel Schweiger 3, Jennifer.
SeaWiFS Views Equatorial Pacific Waves Gene Feldman NASA Goddard Space Flight Center, Lab. For Hydrospheric Processes, This.
Improved Marine Gravity from CryoSat and Jason-1 David T. Sandwell, Emmanuel Garcia, and Walter H. F. Smith (April 25, 2012) gravity anomalies from satellite.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
UPDATE ON GALACTIC NOISE CORRECTION Joe Tenerelli SMOS Quality Working Group #9 ESA ESRIN 24 October 2012.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
Astronomical Institute University of Bern 1 Astronomical Institute, University of Bern, Switzerland * now at PosiTim, Germany 5th International GOCE User.
ESA Climate Change Initiative Sea-level-CCI project A.Cazenave (Science Leader), G.Larnicol /Y.Faugere(Project Leader), M.Ablain (EO) MARCDAT-III meeting.
JMA GPRC report Arata OKUYAMA Meteorological Satellite Center,
Lesson 3: Seasons on earth notes
Air Masses and fronts An air mass is a large body of air that has similar temperature and moisture properties throughout. A front is defined as the transition.
R. Bucˇık , K. Kudela and S. N. Kuznetsov
HIRS Observations of a Decline in High Clouds since 1995 February 2002
World Geography 3202 Unit 2 Climate Patterns.
Presentation transcript:

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA/MWR status Pierre Féménias ESA/ESRIN

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Mission –All services provided by ERS-2 remain fully operational. All LBR instruments are operated on a global basis. –The Instrument Data Handling and Transmission (IDHT) is also working nominally except for the chain of the Tape Recorder B that suffered an anomaly on December 20, –The Chain of the Tape Recorder A is continuously used. –Investigation to locate the origin of the failure on recorder B is on-going, in spite the difficulties to obtain detailed technical information and support from the tape recorder manufacturer

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Platform Operations –The AOCS is operating in Zero-Gyro Mode (ZGM) for the Fine Modes (ZGM-FM) and in Mono-Gyro Mode for the Coarse Modes (MGM-CM) (i.e. for the Safe Mode Exit and the Out Of Plane manoeuvres) –The pointing performance of the ZGM-FM remains well within the requirements for the ERS mission –The performance of the Digital Earth Sensor, Digital Sun Sensor, Reaction Wheels, Magneto Torque and thrusters is outstanding

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Platform Operations –Performance of Gyro #4 (used for the Safe Mode) is excellent, while the performance of Gyro #6 (used for the Coarse Modes) and Gyro #3, used as a back-up of #6, may start degrading after continuous use over several days –The Extended MGM (E-MGM) will permit the use of the Gyros #3 and #4 in Mono Gyro Mode for the Coarse Modes and Orbit Control Manoeuvres –The software for the E-MGM Coarse Mode has been fully validated and will be up linked once E-MGM operation becomes necessary. –The development of the E-MGM for the Out of Plane Manoeuvres has started on January 2003 and is on schedule for delivery by end of July.

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Subsystems –Power Subsystem The solar array delivers a level of power higher than the minimum required. Panel degradation is much smaller than specified The batteries are performing the charge/discharge cycles almost at the same levels as after launch –Thermal Subsystem Average and variation ranges of temperatures of each element of the spacecraft remain stable since launch. No ageing in the walls’ coating has been verified –Fuel Budget The total mass available permits to envisage the long-term operation plus the final de-orbiting of the satellite

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Instrument RA background mission scheduled according to ocean-land transitions: Ocean mode over ocean zones all the time Ice mode over land zones and Antarctica all the time From February 13, 2002, I.e. from orbit 35644, the Great Lakes are now tracked in Ocean mode

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Instrument

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Instrument –Daily extraction of RA ERAC raw data (10 min) for mispointing monitoring –Raw data availability over the last 7 months > 98%. Most of the data outage due to GS operational problems, instrument unavailability due to Leonid Operations, IDHT unavailability, etc –RA Acquisition percentage over Ocean < 2% –No sensible degradation is detected in any of its modules –The RA instrument performs nominally

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003

ERS RA Wind & Wave A large number of outliers (RA values higher than model) in the scatter plot for the wind speed in the Southern Hemisphere. Most of the outliers can be attributed to the DES sun-blinding phenomenon Apart from that, the quality of Altimeter data is as good as they used to be Clear tendency for improved agreement between RA and model data in the Northern Hemisphere after 18 January 2003 (there was no RA on that day) It is not clear yet if the ECMWF model changes (on the 13th. of the month) or a change in the RA behaviour are responsible for this improvement Note: ECMWF atmospheric and wave models have been changed to CY25R3 (en.) on 13 January 2003 (since 18: 00 UTC). ERS- 2 SAR data are assimilated by the wave model. Other atmospheric changes have been introduced as well

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Range Long Term Monitoring Mean of the difference (Altimeter sea surface height – OSU95 mean sea surface height) versus ERS-2 cycle number. (OPR data products)

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Range Long Term Monitoring Standard deviation of the difference (Altimeter sea surface height – OSU95 mean sea surface height) versus ERS-2 cycle number

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Range Long Term Monitoring Mean of Bent ionospheric correction (in mm) versus ERS-2 cycle number

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA Range Long Term Monitoring A trend is observed on SSH-MSS long term monitoring, with particularly high changes since cycle 50 (beginning of year 2000) Such changes cannot be explained by mispointing problems alone Orbit errors could also partly explain some part of these variations Main contribution seems to come from the BENT correction, which poorly retrieves large variations of the ionosphere correction during periods of high solar activity A more complete study about the impact of the ionosphere correction will be carried out in 2003, using GIM (GPS Ionospheric Maps, corrections, if available

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Platform Pointing Off-nadir angle overall trend (Asc and Desc orbit from [0º,35º] latitude north)

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Platform Pointing Along-the-orbit mispointing squared behavior – Periodical with orbital period – Lower values recorded over zones close to the equator (Asc & Desc) – Higher values recorded over zones close to the south and the north poles the last only during winter Season:  Sun Blinding Effect ! (period from ~Nov to Feb)

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 Orbit Orbit Maintenance Performance: Control Dead Band Distance of the actual orbit respect to the theoretical one: –Between 50  and 30  latitude north during descending passes and between 50  and 30  latitude south for ascending passes: ±1 Km –Outside those areas: around ±2 Km

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS OPR Reprocessing ERS OPR Level 2 product –Reprocessing of ERS-1 Phase C in OPR V6 completed in early January 2002 –Reprocessing of remaining phases approved by ERS SG (11/02) –Squared off-nadir angle squared at 1Hz and a smoothed value evaluated using a 30 second sliding window available in OPR02 since cycle 60 (01/01)

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 MWR Instrument

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 MWR Instrument MWR Gain long term stability over ~6 years -Gain very stable -24GHz channel ok, despite the June ’96 anomaly

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 MWR Instrument A long term survey of Brightness Temperatures (BT) over the coldest points on ocean revealed a trend with time (-1.5K over 6 years) of channel 24 GHz The trend has consequences on the tropospheric correction, which decreases with time. This effect is maximum for coldest points, and is lower at mid values of the tropospheric correction A correction on the 24 GHz BT, depending on the time and on the BT value, is proposed. ( )

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 MWR Instrument Mean and Std Dev of the coldest BTs over Ocean (lower than a given threshold)

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 MWR Instrument The correction proposed for this drift is the following : TB23.8corrected_for_the_gain_drop_and_from_the_TBs_drift = TB23.8corrected_for_the_gain_drop + corr(t,TB23.8corrected_for_the_gain_drop) With : corr(t, TB23.8corrected_for_the_gain_drop) = 0 for t <= 1.18 corr(t, TB23.8corrected_for_the_gain_drop)= (a1*t+a2)* TB23.8corrected_for_the_gain_drop + (b1*t+b2) for t > 1.18 a1= b1= a2= b2= t the elapsed time in decimal year since ERS2 launch.

ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 MWR Instrument Correction Validation Long-term survey of the 23.8 GHz BTs after applying the proposed correction The drift has been completely corrected