1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013.

Slides:



Advertisements
Similar presentations
IEEE Submission Sept 2008 Michael Lynch, Nortel Networks Slide 1 ITU-R Regulatory Background Date: Authors:
Advertisements

September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES September.
Regional Policy Delegated Act on the methodology for the quality review of major projects 1 Expert Group on Delegated and Implementing Acts for the ESI.
An Introduction to the ITU
World Meteorological Organisation Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Jean-Michel Rainer.
International Telecommunication Union Yvon HENRI Head, Space Services Department, Radiocommunication Bureau WMO Workshop 2006, Geneva Orbit / Spectrum.
World Meteorological Organisation Use of Radio Frequency bands for meteorological systems Jean-Michel Rainer.
International Telecommuniction Regulations 1 WG-ITR Council Working Group on ITRs General Overview Alaa M. Fahmy Chairman.
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
International Telecommunication Union Accra, Ghana, June 2009 Conformance and Interoperability Testing: (WTSA-08) Resolution 76 Joshua Peprah Director,
Committed to Connecting the World International Telecommunication Union ITU activity for Space Science Accra, Ghana 8 July 2011 Vadim Nozdrin, Counselor,
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
BR Information Meeting on RRC-04/05 (Geneva, 18 – 19 September 2003) RRC-04/05: Terms of reference and scope of work T. GAVRILOV Radiocommunication Bureau.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
Regional Radiocommunication Conference 2006 (RRC-06) Regulatory and Procedural aspects François Rancy Chairman, Regulatory and Procedural Group.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
1 Some important points on Regulatory Issues discussed at the second meeting of the Sub- working Group of RPG 1.Regulatory text for the new regional Agreement.
International Telecommunication Union ITU/WMO Seminar on: Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Geneva,
Pricing for Frequency Usage Yerevan (Armenia) March 21-23, 2001 Seminar for CIS Countries.
23/01/ ITU-R Study Group Activities Kevin Hughes Radiocommunication Bureau ITU Kevin Hughes Radiocommunication Bureau ITU.
Seminar on Aeronautical Spectrum Management Regional Preparation for WRC-07 Nairobi 17 – 19 February 2004.
International Telecommunication Union September 2010 WRC-12 PREPARATIONS MID Regional Planning Seminar 19/20 September 2010 W. Frank Radiocommunication.
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
ICAO Radio Spectrum SeminarMID Office, Cairo, 4 – 6 June RADIO SPECTRUM MANAGEMENT Prepared by Torsten JACOB ANB/CNS.
Yvon Henri Radiocommunication Bureau ITU.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.1 The Directors Report to WRC-15.
International Telecommunication Union Amman, 5 – 7 December 2011 International regulatory framework 1 Ilham Ghazi – BR/ITU ITU Regional Workshop on Efficiency.
Regional Preparatory Workshop for the ITU WRC-2015
1. The ITU Radiocommunication Sector (ITU-R) will remain the unique and universal convergence and regulatory centre for worldwide radiocommunication matters.
1 RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013 RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva,
European preparations for WRC Stella Lyubchenko CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
CPM:Conference Preparatory Meeting Rec:ITU-R Recommendation RoP:Rules of Procedure RR:Radio Regulations (treaty status) WRC SC and Study Groups: SG-1:
WRC-12 Preparation CPG Chairman /
World Meteorological Organisation Use of Radio Frequency bands for for meteorological systems Jean-Michel Rainer.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
NATIONAL INFORMATION AND COMMUNICATIONS TECHNOLOGY AUTHORITY In-country Preparatory Meeting 04 th June 2015, NICTA HQ WRC-15 Issues WRC 15: PNG Preparatory.
Sg-whitespace SubmissionRashid A. Saeed, Telekom MalaysiaSlide 1 February 2009 Slide 1 Work in the ITU: Focus on how 802 can best leverage.
Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development SECRET 1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON COMMUNICATIONS:
UNITED NATIONS and ITU an effective vehicle to support the needs for spectrum and technology in developing countries An outstanding example AAU Conference.
CITEL Inter-American Telecommunication Commission Comisión Interamericana de Telecomunicaciones 28 April 2003GSC-8 Meeting, Ottawa, Canada CITEL Organization.
1 World Radiocommunication Conference ‘07 Preview Edward M. Davison Deputy Associate Administrator, International DoC/NTIA/OSM May 23, 2007 NSMA.
WRC–12 Industry Debrief 23 April 2012 Agenda Items 1.1 Deletion of country footnotes 2 Incorporation by Reference 4 Review of ITU-R Resolutions and Recommendations.
WRC-12 Agenda Item 1.19 Regulatory Considerations for Software Defined and Cognitive Radio Systems Brennan T. Price, N4QX ARRL Chief Technology Officer.
ITU Strategic Planning ICE Proposal January, 2014.
1. 2 Notification of frequency Assignments for recording in the Master Register Prepared by : Eng.yasir Mohammed Bashar
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
International Telecommunication Union Preparation for the World Radiocommunication Conference 2015 (WRC-15) Philippe Aubineau Counsellor, ITU-R Study Groups,
Vientiane, Lao People’s Democratic Republic, July 2012 ITU-R Standardization Activities Colin Langtry, Chief, BR Study groups Department
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
Inter-American Telecommunication Commission (CITEL)
CEPT Conference Preparatory Group
Preparation for World Telecommunication Standardization Assembly 2016
ITU activities for Emergency Communications and Disaster Relief
SADC WRC-15 Preparatory Meeting
ITU Overview Presented by : ITU (International Telecommunication Union) BR-Space Services Department Akim FALOU DINE.
RADIO SPECTRUM MANAGEMENT
Regional Preparatory Workshop for the ITU WRC-2015
The International Telecommunication Union in a fast evolving ICT world
Doriana Guiducci, European Communications Office
Sergio Buonomo Counselor ITU-R Study Group 5
Digital Sound broadcasting ITU Regulation
Coordination of Satellite networks
ITU-R Regulatory Background
Decisions and Recommendations for the
SADC 5TH WRC – 15 PREPARATORY MEETING
Possible Future Agenda Items
ITU Update since GSC-13 Global Standards Collaboration (GSC) 14
SIG RFC 2019 Relevant Summary
Presentation transcript:

1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013 RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

2 This is the Strategic Plan of the ITU-R, i.e. the Membership This is not the Strategic Plan of the BR. The BR provides support to the activities of the ITU-R It is a matter for the Membership to address, consistent with the specific strategic plans of each member.

3 Avoid confusion between objectives and means in the “strategic goal” Resolution 71 (Rev. Guadalajara, 2010) may be improved on the following aspects: Avoid confusion between activities, outputs and objectives Avoid confusion between ITU-R and BR roles, in respect of activities, results and KPI Avoid separation between consistent activities (e.g. RA and RAG, publications)

4 To ensure interference-free operations of radiocommunication systems by implementing the Radio Regulations and regional agreements, as well as updating these instruments in an efficient and timely manner through the processes of world and regional radiocommunication conferences To establish worldwide standards and associated materials Recommendations intended to enassure the necessary required performance, interoperability and quality in for operating radiocommunication systems. To seek ways and means to ensure the rational, equitable, efficient and economical use of the radio-frequency spectrum and satellite-orbit resources and to promote flexibility for future expansion and new technological developments.

5 Output of this process is the Final Acts of WRCs and RRCs, updated Radio Regulations, Rules of procedure of the RRB Activities are: preparatory activities by administrations and regional groups, WRC and RRC discussions, RRB activities and BR activities in support of all this. Input is proposals from administrations, reports from the Director, BR Establish and update international regulations on spectrum use

6

7 Outputs are updated MIFR and Plans by recording/suppression/modifications of assignments/allotments in the MIFR/relevant Plans and associated publications (BRIFIC, Lists of Maritime publications, Inputs are the notices from administrations on intended use of spectrum Activities are: Proposed Process 2 (Associated to “Objective 2”): Proposed Process 2 (Associated to “Objective 2”): Apply international regulations on spectrum use -the actions taken by the BR in administering the procedures of the RR and regional Agreements, -the activities of the RRB other than the adoption of RoPs, - the actions taken by administrations and operators in coordinating frequencies and exchanging information with the BR, and the BR supports for these works.

8 ITU-R Production Process 2

9 Outputs are recommendations, reports (including the CPM report) and handbooks Inputs are contributions by the ITU-R Membership Activities are the technical, operational and regulatory studies within the ITU-R Study Groups, SCRPM and CPM, as well as the BR activities in support of these tasks RA is piloting this process Proposed Process 3 (Associated to “Objective 3”): Proposed Process 3 (Associated to “Objective 3”): Produce worldwide standards, recommendations, reports and Handbooks for optimum use of spectrum and its associated works

10

11 The activities relating to informing from those relating to assisting administrations may be difficult to separate. Therefore, these activities have been combined into one process intended to fulfill Objectives 4 and 5. Proposed Process 4 (Associated to “Objectives” 4 and 5): Proposed Process 4 (Associated to “Objectives” 4 and 5): Inform and assisting membership in radiocommunication matters

12

13

14 Modifications to Resolution 71 are to be decided by PP-14 Preparation expected to take place in a Council working group to be created by C13 and to produce a report for consideration by C14 and by MS in formulating their formal proposals to PP14 RAG may wish to liaise its conclusions, if any, to the Council Working group, as foreseen by Resolution 71