Mission Trajectory Step 1 From planning to deployment.

Slides:



Advertisements
Similar presentations
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Presentation to ADQ Implementation Workshop
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
ATM Master Plan Implementation Package 1 (IP1) CNS ATM Steering Group, UK CAA, 10.Feb /04/2017 EUROPEAN COMMISSION.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Traffic Management and FUA integration
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
GAMMA Overview. Key Data Grant Agreement n° Starting date: 1 st September 2013 Duration: 48 months (end date 31 st August 2017) Total Budget:
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
SESAR and ASAS Opportunity
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
PBN Airspace Concept Process
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
SESAR Single European Sky Air traffic management Research
Regional ATFM in Europe
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
International Federation of Air Traffic Safety Electronics Associations PCP and CP2 by Robert Schneebuaer IFATSEA Ambassador.
Workshop on preparations for ANConf/12 − ASBU methodology
Users’ Perspective of PBN Achieving Improvements
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Ground System implication for ASAS implementation
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
ANConf/12 – Agenda H. Sudarshan
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
M. Steinfurth, I. Kuren, R. Lacatus, A. Paulov, V. Somosi
Presentation transcript:

Mission Trajectory Step 1 From planning to deployment

Deployment Baseline (formerly: IP1) Step 1 Time-based Operations Step 2 Trajectory-based Operations Step 3 Performance-based Operations SESAR Steps are capability-based (not fixed in time) The SESAR concept

4D Business Trajectories data linked and negotiated between AOC- NM-aircraft-ATC 4DT Trajectory negotiation 4D Mission Trajectory same principles as Business Trajectory but enables complex military operations: Airspace reservations part of trajectory definition Synchronisation of multiple trajectories for complex missions Formation flights with trajectory split/join up Confidentiality & security requirements of exchanges between WOC-NM-aircraft-ATC SESAR : Business/Mission Trajectory

Business/Mission Trajectory Not a new way to fulfill missions - A new way to share information, negotiate trajectories and allocate airspace during planning cycles and execution phase, - A new way for flights description, richer than today’s Flight Plan - A new way to provide Air Navigation Services - A new challenge for civil/military coordination Mission Trajectory

Network Shortcomings Lack of Airspace management flexibility (inability to exploit capacity opportunities) Lack of integration of Network, ATC and AOC/WOC operations (limited reliability of available information by different actors) implies: Limited predictability overprotection in term of capacity, Local actions with negative impact on Network 2 hours gap between ATFM and ATC (limited flexibility and reactivity) Civil military airspace management systems to distribute planned airspace usage & airspace status and to allow more modular airspace structures. Harmonised military flight planning & aeronautical information systems to support improved “Operational Air Traffic” Secure gateways to interconnect military systems to the ATM network Uplink & downlink of trajectory data through data link (Transport type only for time based operations) Enhanced airborne navigation and surveillance systems (Transport type only for time based operations) Technical Enablers Mission Trajectory requirements Unrestricted access to airspace for high priority missions Operational Air Traffic Transit Service across Europe Sufficient airspace for training Confidentiality & security Compatibility with FABs & NM Main Step 1 system changes in support of Mission Trajectory & Network performance

STEP 1 Mission trajectory development ATFCM Baseline Projects Projects ASM local simulation/negotiation ASM simulation/negotiation Based on Mission requests ASM simulation/negotiation Based on Mission requests ASM simulation/negotiation Based on flight intents ASM simulation/negotiation Based on flight intents Project Project Project Project WOC ATC ATFCM A/C Aircraft Meteo

Common Projects (Business view) 7 Main challenges Master Plan Network Strategy Plan ESSIP Performances & Maturity Analysis, Business cases Implementation Projects CFT Level 1 Level 3 Monitoring execution Ensuring Consistency Trigger and support corrective actions Level 2

ATM Master Plan Operational changes for Military- STEP 1 “full scope” ANSP Aeronautical Information Data sharing Airspace Management Systems Datalink systems and services Enhanced local ATFCM tools for NOP & trajectories Enhanced Flight data processing Ground communication and information infrastructure WOC Aeronautical Information Data sharing Airspace Management Systems Enhanced WOC systems Flight planning and demand data Ground communication and information infrastructure TRANSPORT AIRCRAFT ABAS capability ASAS spacing capability Datalink systems and services FMS capability to support i4d operations FMS upgrade for Lateral/Vertical NAV approach Onboard D-Taxi management Onboard situation awareness & alerts on ground AIRPORT Aeronautical Information Data sharing Airport lighting system Datalink systems and services Ground communication and information infrastructure Surface movement systems Surveillance infrastructure Planning exercise/No CBA Prioritisation based on: Mission trajectory needs Network performance synchronisation

Interim Deployment Programme Reference WP 2 Airspace management tools interoperable with the network AOM 19; FUA regulation WP 2 Migration to European Aeronautical Service EAD AOM 13.1; LSSIP report; regulation 73/2010; ITY ADQ WP 4 VDL 2 for Transport AircraftITY AGDL; link WP 5 Ground systems upgrade for Flight Data Exchange ITY COTR; FMTP WP 6* Avionics and procedures for RNP 1 performance NAV 03; PBN mandate WP 7* Avionics and procedures for APV baro/SBAS NAV 10; ICAO spec; PBN mandate Military priorities deployment decision taken no need for Cost Benefit analysis * maturity linked to PBN mandate

Pilot “common project” & Deployment Programme Reference WP 1 Enhanced ASM/ATFCM/ATC ? WP 2 Enhanced OAT FPL? WP 3 AMHS? WP 4 Secure gateways with IP networks? WP.. Deployment based on European ATM Master Plan Refined Performance needs Refined Cost Benefit Analysis Updated with R&D results and maturity checks With updated OIs/enablers/lines of action