Presentation is loading. Please wait.

Presentation is loading. Please wait.

NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.

Similar presentations


Presentation on theme: "NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements."— Presentation transcript:

1 NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements

2 NM User Forum 2014 - NM 2014/2015 functional improvements2 Functional Improvements New NM Projects Cooperative Traffic Management SESAR R&D Demand-Capacity Balancing Optimized AU Operations Dynamic Airspace Management 2 Releases timeline 2015 NM18.0NM19.0 NM18.5 Mar Oct 2014 2013 NM19.5 Oct May NM18.NOP NM Projects Free Route Airspace Advanced Flexible Use of Airspace NOP Information Services

3 NM User Forum 2014 - NM 2014/2015 functional improvements33 NM Project - Free Route Airspace Avoid Boundary DCT 0.1% Rule for route substitution 0.1% October 2014 NM Achievements  Oct 2011 - Initial Deployment of NM systems  In 2013, 10 ACCs have either fully or partially implemented FRA (with one X-border)  End of 2013, 5 additional ACCs planned

4 NM User Forum 2014 - NM 2014/2015 functional improvements44 NM Project - Advanced Flexible Use of Airspace TACT NMC / MILO Network Impact Assessment CACD PREDICT SIMEX NM operations ASM interoperability level 1&2 Dynamic Updates Test Airspace not published Export NAT Tracks in AIXM 5.1. Format Operational Static Data eAMI eRAD Interoperability with local ASM Tools October 2014 ASM Tools AOs, ANSPs

5 NM User Forum 2014 - NM 2014/2015 functional improvements55 NM Project - NOP Information Services Cooperative ATFCM Services Cooperative Flight Management FPL submission via the NOP (FB559 – NM18.NOP) PREDICT Scenario editor Via the NOP (FB587 – NM18.0) SIMEX TACT Trial in Spring 2014 before ops Summer 2014

6 NM User Forum 2014 - NM 2014/2015 functional improvements66 NM Project - NOP Information Services All Users EVITA Phase II – enhanced interface (FB538 - 2014) EACCC Crisis Management Pack (FB562 – Mar 2015) All Users NOP access to event info (FB591 – NM17.5.2 – Internal Prototype) (FB630 – 2014) Network Events Repository Updating the CFMU URLs (incl B2B) (FB592 - NM18.0) Q1 2014 Mid-2014 Mar 2015

7 NM User Forum 2014 - NM 2014/2015 functional improvements7 2013 SESAR Research & Development - Planning 201420152016 Release NM18Release NM19Release NM20Release NM21 DCB STAM 1.Edition, What-If 2.Coordination STAM 1.Interops INAP Tools Extended TTO/TTA AMAN Integration V3 V2 V3 Release NM18.5 OAT FPL Slot Swapping ASM Real-Time AU Ops Dynamic AS FOS Extended FPL V2 V3

8 NM User Forum 2014 - NM 2014/2015 functional improvements8 SESAR – DCB (Demand-Capacity Balancing) Operational Validations STAM Ops Trial 2015 Scope: Interoperability with local ATC Planning tools STAM Ops Trial 2014 Scope: Hotspot management STAM proposal definition STAM collaboration and implementation Implementation monitoring Airborne flight trajectories (Newbridge) Scope: Improved predictability when post-dep trajectories received by the AUs from their airborne flights, are sent to the NM. Sep 2014 May 2014 May 2015

9 NM User Forum 2014 - NM 2014/2015 functional improvements9 SESAR – Optimized AU Operations Operational Validations Military (OAT) FPL Validation of military flight plan by IFPS Summer 2014 Q4 2015 Slot Swapping (UDPP) Scope: Enhance Slot Swapping capabilities and check benefits: Slot swapping partners display + swap in one click Reconcile CDM airport delay and ATFCM delay Priority adaptation for swapped flights

10 NM User Forum 2014 - NM 2014/2015 functional improvements10 SESAR – Dynamic Airspace Management TACT CACD PREDIC T SIMEX NM systems ASM Tools Operational Validations Interoperability with ASM Tools for real-time Scope: ASM/ATFCM coordination until the real-time activation of airspaces or routes (with local ASM tools) Q4 2014

11 NM User Forum 2014 - NM 2014/2015 functional improvements11 2014 Future NM Project - Cooperative Traffic Management 201520162017 Release NM18Release NM19Release NM20Release NM21Release NM22 Cooperative Traffic Management STAM 1.Edition, What-If 2.Coordination 3.Scenario Mgnt 4.Post-Ops STAM 1.Interops INAP Tools 2.Scenario Mgnt 3.Post-Ops Adherence 1.Intruders surveil. 2.Late updates 3.Predictability monitor TTA/AMAN Integration 1.D/E/A MAN reconciliation TTA/AMAN Integration 1.Metring Fix Mgnt SESAR STAM 1.Edition, What-If 2.Coordination STAM 1.Interops INAP Tools Extended TTO/TTA AMAN Integration V3 V2 V3

12 NM User Forum 2014 - NM 2014/2015 functional improvements12 Promotion on Communication about Releases: Release Notes http://www.eurocontrol.int/publications Webex http://www.eurocontrol.int/publications Others

13 NM User Forum 2014 - NM 2014/2015 functional improvements13 Questions?


Download ppt "NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements."

Similar presentations


Ads by Google