Gas Regional Investment Plan North West 2013-2022 Stakeholder Consultation Presentation 4 th April 2013 1.

Slides:



Advertisements
Similar presentations
A 2030 framework for climate and energy policies Marten Westrup
Advertisements

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Vision for the internal electricity market
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
TSO Transparency project Gas Regional Initiative North West Ofgem, Great Britain Regional Co-ordination Committee 18th February 2011.
EU Developments Transmission Workgroup 3rd November 2011.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
South Region Second Edition
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Gas Regional Investment Plans
2009 TSO Transparency Gas Regional Initiative North-West
ERGEG GRI South South East – , Maribor
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan project
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
In depth analysis of TYNDP issues
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April

Consultation Details  This presentation informs stakeholders about the content of the North West Gas Regional Investment Plan (NW GRIP) Presentation at the GRI NW meeting in the Hague on 4 th April 2013  This presentation will be accompanied by a consultation questionnaire Published on the regional TSOs’, ENTSOG and GRI websites and shall be regarded as the input for the stakeholder consultation  Stakeholder Consultation start date 4 th April 2013  Stakeholder Consultation end date 3 rd May 2013  Responses to be submitted to NW GRIP coordinator GTS (see last slide with contact details) 2

3 NW GRIP 2013: Timeline 23 Nov 12 Early 13 4 th April 3 rd May 1 st July 1 st Sep 1 st Oct Late 2013  GRI NW consultation on concept  Start drafting the document  Stakeholder Consultation start date  Stakeholder Consultation end date  Share draft version with GRI NW  Deadline for GRI NW response  Final publication  Post GRIP publication consultation

4 Introduction Why a GRIP?  Third Energy Package legal obligation  Regulation Art. 12(1) 715/2009/EC  Obligation for TSOs to publish a regional investment plan every two years 1 st NW GRIP published in November 2011  First ever GRIP published from any region  Show how infrastructure projects influences cross-border points in the Northwest region  Highlighted strong collaboration between regional TSOs Response to GRIP 2011 consultation round  No direct response to the questionnaire provided  EFET response  RCC response Additional value GRIP 2013 compared to TYNDP  Additional element of regional cooperation  Update of project data and 2012 data  More detailed information about TYNDP identified cross-border issues

5 Structure NW GRIP 2013 High level principles  Complement ENTSOG TYNDP and ensure consistency with National Plans  Build on the inaugural NW GRIP and improve it  Improve stakeholder communication/consultation  Describe/explain the Region‘s assets & needs  Explain why investments in gas transmission projects are required in the Region  Describe projects Agreement reached during the Nov Copenhagen GRI NW GRIP consultation next NW GRIP to include:  Improvements based on feedback received, including RCC recommendations  Enhanced regional supply and demand analysis  Showing the Impact of projects on cross border points  Show procedure and results of regional cross border open seasons / auctions  ‘Deep Dive’ into regional congested points as highlighted by TYNDP

6 Chapters NW GRIP 2013  Executive Summary  Introduction  North West Specifics  Supply and Demand  In Depth Review of TYNDP Identified NW Issues  Projects  Conclusions  Annex  Project description: more detailed description/visualisation compared to TYNDP

Chapter North West Specifics I 7 Pillar I Competition  Decades of collaboration and front runners in promoting competition  Resulted in the most liquid hubs in the EU  Previous and current Auctions and Open Seasons listed in the GRIP  All relevant projects included and elaborated in the GRIP Pillar II Security of Supply  Long history of security of supply, cold spell 2012 cooperation illustrative for the region  Decrease in indigenous production, increase need for imports  L-gas issues up to 2022 only applicable to German situation, covered in German Netzentwicklungsplan and Pentalateral Forum, information to be included Pillar III Sustainability  Gas as the cleanest fossil fuel plays a role in the future energy supply. Gas infrastructure allows for a strong growth in the use of renewable sources (wind/sun), as it can affordably provide the required network flexibility and it can serve for example as a means to store energy. The capacity developed by gas infrastructure projects directly improves the development of the European internal energy market by enhancing all three aspects of European Energy Pillars.

Chapter North West Specifics II This chapter will also outline the various reasons for the need for investment in gas infrastructure in the NW region  Sufficient capacity to promote competition  Sufficient capacity to guarantee security of supply  Substitute decreasing regional production  Supply diversification  Maintenance projects related to the ageing infrastructure  Sufficient network flexibility But also barriers to investment exist, what is needed  A favourable regulatory framework (in the project’s definition, execution and operation phase).  A stable investment climate, ensuring that system owners are incentivised to invest in infrastructure projects and that investors can trust that they have a sufficient return on their investments  A clear political vision, not only on an annual volume base, but also on a daily/hourly capacity base 8

9 The NW GRIP will cover the following Demand based topics  Annual Demand for the north west region compared to total EU demand  Annual Demand development by country  Breakdown of Annual Demand into Gas Fired Power Generation and other  High Daily Demand scenarios  An example of the Impact of Renewables on Gas Fired Power Generation The Supply aspect of the chapter will look into  The North West region’s growing import dependency  How regional Supply Source diversification will evolve  Infrastructure development of LNG in the region The chapter will provide a wide ranging Supply and Demand outlook for North West Europe *All 2012 figures shown the next charts are based on 2013 forecast data, by the time of publication 2012 data will be available. Chapter Supply & Demand

Chapter S&D: Annual Demand 10

Chapter S&D: Annual Balance 11

Chapter S&D: High Daily Demand The Design-Case scenario is favoured by the TSOs of the NW region, as it is considered the most robust data has been used for 2012 in this example, actual data will be available for final publication.

13 TYNDP covers four types of analyses: 1.Resilience assessment (potential investment gaps) Findings for: Denmark, Sweden and Luxemburg 2.Supply dependency assessment (the dependence of some Zones on a single supply source) Findings for Germany (GASPOOL market area), Denmark, TIGF France and South France 3.Network adaptability assessment (the ability of the system to adapt to various supply patterns) No findings in NW region 4.Supply source diversification assessment (the capability of the system to enable its Zones to access different supply sources) Overview included in NW GRIP S&D chapter Chapter ‘In Depth Review of TYNDP Identified NW Issues’

Resilience Assessment  Potential investment gaps  Germany, Denmark (and Sweden) TYNDP Project Ellund  Capacity extension from Germany to Denmark would solve this issue  Projects were identified through an Open Season in 2009  FID-project Step 1 increase capacity from Oct at a level of 310,000 m³/h  Non-FID project Step 2 increase capacity in 2016 at a level of 500,000 m³/h Update GRIP 2013  Step 2 is now also FID  No investment gap Chapter ‘In Depth Review of TYNDP Identified NW Issues’: Example 14

Chapter Projects: Matrix The matrix improves regional transparency by showing how infrastructure projects impact border points and vice versa. 15

Annex: Project Details  Based on the project information in the TYNDP  Plus new info if applicable  Plus more graphical information 16

Consultation Questionnaire – Sample  What additional information/analysis would you like to see included in the North West Specifics and/or Supply & Demand chapter?  Do you think that the NW GRIP enhances transparency on projects? If not, please provide your reasoning.  Which chapter, do you think, will be of most interest to you and why? 17

18 Questions 18

Point of Contact / Response to be sent to Mr. Piet Nienhuis, Gasunie Transport Services +31 (0)