Integrating Developmental and Operational Testing

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT BASICS
Advertisements

CURRENT STATE OF ACQUISITION, TEST & EVALUATION ENTERPRISE NOVEMBER 2012 PRESENTATION TO INCOSE ENCHANTMENT CHAPTER Charles Pete Adolph.
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
U Development of Reliability Program Standard GEIA-STD-0009 SE Summit March 2009 Approved for Public Release; Distribution is unlimited.
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Lisa Brown and Charles Thomas LAWNET 2002 Taking the Mystery Out of Project Management.
Gaining Senior Leadership Support for Continuity of Operations
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
Change Management Overview. 2 Objectives Overview of the change management approach Clarity on how the tools support the change approach Apply the change.
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effective Contract Management Planning
- 1- Just enough. Just in time. Just for you March 24, 2011 Building a solid foundation: A new approach to ERP acquisition March 24, 2011 Mike Reyna Project.
1 Division of Aging and Adult Services (DAAS) Knowledge Management and Transfer Project 7/30/12.
DT&E Cmte - Walking The Line with Title 10 1 Beth Wilson Industry Co-Chair NDIA System Engineering Division, DT&E Committee Test Architect, Raytheon Company.
1)List and briefly describe the three project quality management processes. Quality Planning: Identify which quality standards are relevant to project.
Workforce Opportunity Services An Overview 1 Dr Art Langer.
Introduction to Military Certification Office
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Evaluation Orientation Meeting Teacher Evaluation System
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Resource Management Unit 5.
Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
1 Independent Verification and Validation Current Status, Challenges, and Research Opportunities Dan McCaugherty IV&V Program Manager Titan Systems Corporation.
Chapter 8 Information Systems Development & Acquisition
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Fundamentals of Information Systems, Second Edition
CBIIT Quality Assurance Process Preston Wood NCI CBIIT Government Quality Representative (GQR) January 2014 RS.
Guiding principles for the Federal acquisition system
Outsourcing: Managing Interorganizational Relations CHAPTER TWELVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Integrated Capability Maturity Model (CMMI)
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Collaboration to Meet Future T&E Needs ITEA 14 September Mr. Mike Crisp Deputy Director, Air Warfare Operational Test and Evaluation.
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
Page 1 Internal Audit Outsourcing The Moss Adams Approach to Internal Audit Outsourcing Proposed SOX 404 Changes.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Life Cycle Logistics.
Project Portfolio Management Business Priorities Presentation.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
UNCLASSIFIED DISTRIBUTION STATEMENT A – Cleared for public release by OSR on Sep – SR case number 10-S-3203 Developmental Test & Evaluation Presented.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
The Information Systems Development Processes Chapter 9.
First Things First Grantee Overview.
DoD Template for Application of TLCSM and PBL
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
MNS - Mission need statement
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
TechStambha PMP Certification Training
ISA 201 Intermediate Information Systems Acquisition
Importance of T&E Connotations
Supplier Partnership Supplier Partnership is the discipline the strategically planning for, and managing, all interactions with third party organization.
SUPPLIER PARTNERSHIP 2.
Executive Vice President and Oshkosh Truck Corporation
Special Education Maintenance of Effort
4 March 2004 A Framework for OT&E Transformation NDIA 20th Annual Test and Evaluation Conference Dr. William G. Lese Vice President Simulation, Analysis.
Perspectives on Transforming DT and OT Industry-Government Roundtable
Presentation transcript:

Integrating Developmental and Operational Testing Dr. William (Dave) Bell 2 December 2009

Agenda/Overview What/Why Integrated Testing? When Should We Do It? What Can/Should Testers Do? Summary

Recent DoD Integrated Testing Policy T&E expertise must be brought to bear at the beginning of the system life cycle to provide earlier learning about the strengths and weaknesses of the system under development Integrated testing is the collaborative planning and collaborative execution of test phases and events to provide shared data in support of independent analysis, evaluation and reporting by all stakeholders particularly the development (both contractor and government) and operational test and evaluation communities

Integrated Testing Defined Defense Acquisition Guidebook, Chapter 9 Whenever feasible, DT&E and OT&E events should be combined, if that supports technical and operational test objectives to gain the optimum amount of testing benefit for reasonable cost and time. The user community should be involved early in test planning to ensure the statement of desired capabilities is interpreted correctly and tested realistically. Certain events can be organized to provide information useful to developmental and operational evaluators and lend themselves to the DT and OT approach. The concept is to conduct a single combined test program that produces credible, qualitative and quantitative information that can be used to address developmental and operational issues. Examples of this approach include: combined DT/OT events or piggybacking an operational assessment onto a developmental test. Likewise, developmental testing data requirements can be accommodated by an operational test. This approach can reduce the time and expense of conducting dedicated OT events that replicate DT events, or vice versa, yet still provide adequate technical risk reduction. The developmental and operational testers can develop a test management structure to share control of the combined events. Combined DT and OT events and test data requirements must be identified early to prevent unnecessary duplication and to control costs. It is important that neither the DT&E nor OT&E objectives are compromised in designing combined events. Combined DT & OT events support technical and operational objectives User community involved early to ensure desired capabilities interpreted correctly and tested realistically

DT/OT to IDT/OT Evolution - Past Developmental Test Operational Test Contractors Responsible Test Organizations Find & fix technical problems Operational Test Agencies Director, OT&E Discover ops issues & confirmation Certification

DT/OT to IDT/OT Evolution - Present Developmental Test Operational Test Integrated Test Ktrs RTOs Find & fix technical problems Certification OTAs DOT&E Finish discovery & perform confirmation Ktrs RTOs OTAs DOT&E Certification Discovery of ops/tech issues Ktrs Contractors RTO Responsible Test Organization OTA Operational Test Agency

DT/OT to IDT/OT Evolution - Future Developmental Test Integrated Test Operational Test Ktrs RTOs OTAs DOT&E JITC Develop/refine requirements Discover/fix ops/tech issues OTAs/DOT&E Title 10 confirmation Final certifications Contractors/RTOs Early technology demo & selection WIN - WIN: Capability in warfighters’ hands ASAP Reduces cost, schedule, and risks

Agenda/Overview What/Why Integrated Testing? When Should We Do It? What Can/Should Testers Do? Summary

Testers Informing Early Decision Making… Requirements/specification impact Disciplined testing mentality helps discovery process; prior to large funding commitment

Integrated Testing - Part of Systems Engineering

Production & Deployment Acquisition Process Operations & Support System Development & Demonstration Design Readiness Review Technology Development Production & Deployment FRP Decision Review LRIP/ IOT&E Concept Refinement Concept Decision A B C ICD CDD CPD Why wait until formal OT to find out you didn’t build the right thing? Req’ts TEMP TEMP Update Test Docs CT/DT OT T&E How far back should we look? 0 yr 2 yr 4 yr 8 yr 10 yr

Integrated Testing Environment • • • Integrated Testing Execution Period

Agenda/Overview What/Why Integrated Testing? When Should We Do It? What Can/Should Testers Do? Summary

During Requirements Development Early T&E influence during requirement development : Ensures requirements are testable and unambiguous Can you readily imagine a verification technique for this requirement? Your requirement may be ambiguous if interpretation is required to design and build Ensures that the test measures address/answer the Critical Operational Issues Requirements that are high risk/push the state-of-the-art are identified/addressed Getting the requirements right is a pothole-filled road 14

T&E During SOW, RFP, and Contract Development T&Eers ensure that test-related scheduling, budgeting, infrastructure, other resources and personnel are included in program’s contractual documents SOW/RFP, proposal evaluation, contract T&Eers help answer the question, “How much and what type of data need to be collected?” To inform early decisions Assure continuing involvement Test design Test events /Operational/Mission scenarios Distributed/Joint/LVC Statistical sample size determination Analysis planning

Integrated Test Execution Early, continuous IT serves both DT and OT objectives Provides adequate test time ensuring all test objectives are met Allows for better/more thorough data collection Allows PM’s an early look at and time to fix operational issues Provides opportunity for assessment of reliability growth Maintenance activities on early test units yield valuable information Initial maintainability assessments Evolve maintenance approach or design at this relatively inexpensive stage Earlier insight = cheaper & easier fixes

Opportunities for Integrated Testing Integrated DT/OT supported in SOW and RFP Integrated DT/OT supported in Test Strategy and Planning documents Requirements unambiguous and testable DT&E and OT&E personnel working together from Program’s outset Contractor and Government DT Data augments OT&E data OT&E personnel influence Operational Realism of DT&E scenarios Test Planning Working Groups develop common data collection and reporting formats The DT&E System Under Test (SUT) reflects Operational System and is operated by typical/actual users OT&E personnel participate in DT Testing and/or receive test documentation OT&E personnel assist Program Managers to develop “Acceptable Work-arounds” mitigating serious deficiencies

Recommendations for Integrating DT/OT 1. Build a culture of Mutual Trust and cooperation Demonstrate to PMs OT is not simply “Pass or Fail” Assist PMs in lowering overall program risk by providing SE and T&E involvement early in the development process 2. Develop a “Partnership” not an adversarial relationship between the Test Community and Contractors or PMs Identify ways Integrated DT/OT is of mutual benefit to PM’s, Contractors and OTA’s Demonstrate how early detection of deficiencies reduces overall risk and cost Show how schedule test time can be reduced by integrating DT/OT Assist PM’s in developing and presenting an acceptable case for correcting deficiencies to the MDA

Recommendations for Integrating DT/OT 3. Encourage adoption of Common data Format/Standards for all Joint and Distributed Emphasize need for ability to exchange information in the TEMP as part of Integrated testing Include requirement for common data standards/formats in all SE and T&E Instructions and documentation DOT&E and OTAs encourage Test Planning Working Groups to develop a common standard for data Utilize professional organizations like ITEA and NDIA to support the necessity of common data standards/formats

Agenda/Overview What/Why Integrated Testing? When Should We Do It? What Can/Should Testers Do? Summary

Integrated Testing Is Critical Combines the engineering expertise of the developer and SE with the operational expertise of the user and operational tester Ensures that requirements are written correctly Ensures all relevant testing is planned and budgeted Takes advantage of all available test data to inform acquisition and operational decisions Accelerates deployment of mission capability to the warfighter