SR - 710 Tunnel Technical Study Presentation for City of Pasadena City Council January 26, 2009.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Bulgarian National Geological Data Sets
1 Community Right to Know Electronic Reporting Bruce Boyd Tina Gutierrez & Latoshia Parker Office of Pollution Prevention and Right to Know.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Topic 1Topic Q 1Q 6Q 11Q 16Q 21 Q 2Q 7Q 12Q 17Q 22 Q 3Q 8Q 13Q 18Q 23 Q 4Q 9Q 14Q 19Q 24 Q 5Q 10Q 15Q 20Q 25.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
U.S. Department of the Interior U.S. Geological Survey Federal and Regional Efforts Related to Marcellus Shale Exploration and Production David P. Russ,
Rulison and Rio Blanco Sites U.S. Department of Energy Office of Legacy Management Northwest Colorado Oil and Gas Forum September 4, 2008.
0 - 0.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Photo Composition Study Guide Label each photo with the category that applies to that image.
ODOT's Environmental Site Assessment Process
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
Richmond House, Liverpool (1) 26 th January 2004.
Company Confidential OASIS Feedback Process (Using OASIS to Drive Improvement) 1.
Washington State Auditors Office Troy Kelley Independence Respect Integrity Regulatory Reform: Improving Permit Timeliness Joint Legislative Audit and.
Overview of the EPRI Groundwater Assessment Program
Greater Minnesota Transit Investment Plan PAC December 14, 2010.
Introduction to Homeless Management Information Systems (HMIS)
Planning For Family Life Education (FLE) Month
© S Haughton more than 3?
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Combine Like Terms. Simplify the Given Expression Below:
Stakeholder Meeting for Focused Feedback February 10, w-swrule2-05.
Stakeholder Meeting for Focused Feedback February 10,
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
  16 th Annual OSC Readiness Training Program NCP Community Involvement Requirements and Additional Recommendations Katy Miley,
Addition 1’s to 20.
Individual Assistance Preliminary Damage Assessment Preliminary Damage AssessmentTrain-the-Trainer 1Train-the-Trainer 2011.
25 seconds left…...
Test B, 100 Subtraction Facts
Doubles Facts Doubles with Pictures Doubles without Pictures Pictures Only.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
We will resume in: 25 Minutes.
Lydia Cumming, MRCSP Outreach Coordinator, Battelle MRCSP Outreach Program DOE/NETL Cooperative Agreement # DE-FC26-0NT
Registry and Referral System HCW/PSW Staff User Manual
3-1 Utility Conflict Identification and Management Lesson 3.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
AB 1497 – Public Hearings Mission Road Transfer Station Case Study David Thompson Environmental Supervisor City of Los Angeles.
Mineral Resources EES – Chapter 19.
Geotechnical Investigation
Presentation transcript:

SR Tunnel Technical Study Presentation for City of Pasadena City Council January 26, 2009

2 Purpose of the study Consider all practical routes for the extension of Route 710 Gather information on soil and sub-surface conditions Provide for public input and involvement

3 Why Tunnels? Reduce impacts to communities and sensitive areas

4 Objective of the Exploration Program A total of 5 potential zones will be investigated Collect geotechnical, geological, and hydro-geological information for each zone Information to be used for screening purposes

5 Exploration Plan Zones

6 Key Factors Influencing Tunneling Faulting Fault displacement Rupture zone length Uniformity of geologic material Potential for adverse tunneling conditions Flowing/squeezing soils, boulders Properties of geologic materials Groundwater conditions Hazardous materials

7 Geotechnical Exploration Program Data collection and review Geologic mapping Geophysical surveys Drilling, sampling, and logging Laboratory testing

8 Boring Activities 33 small diameter borings; six locations in Pasadena Vertical and Inclined drilling Each boring will take 7 to 10 days to complete Work area is about 12 feet by 60 feet Drilling performed daytime hours

9 Seismic Reflection Testing 20 seismic reflection surveys; two locations in Pasadena Non-destructive Most Geophysical testing will be performed at night One location per night

10Summary Zones# of Borings Total Lineal feet (ft) # of Geophysical Lines Length of Tunnel (mi) 182, – , – , – , – , – 11.5

11 Exploration Program Schedule 6/ /099/099/ Encroachment Permit Site Reconnaissance Geologic Mapping Summary Report NTP Drilling by Caltrans Drilling by CH2M HILL Lab Testing Data Evaluation

12 Recent Findings Two superfund sites were identified The sites are located within Zones 4 and 5 Groundwater in this area is known to be contaminated with Volatile Organic Compounds Depth of groundwater ranges from 50 feet to 150 feet below ground surface Tunnel is expected to be at about 200 feet below ground surface

13 Superfund Site Locations within Zones 4 and 5

14 Planned Activities Proceed with the borings in Zones 1, 2 and 3. Postpone borings in Zones 4 and 5, pending additional information related to the Superfund Sites. Borings to be done by both Caltrans and CH2M HILL Borings to begin in early January 2009 Each boring is expected to take about 7 to 10 days to complete

CityExploration Activity# of Visits # of Stakeholders added to Database AlhambraBorings: 3 Geophysical Line: Los AngelesBorings: Pasadena Z3-B2 (Caltrans 710 ROW north of Del Mar Blvd) Boring: Total visits to Homes/Businesses: 490 # of Stakeholders added to database: 42 Summary of Public Outreach Activities

16 Public Outreach and Notification Program Public Outreach and Notification Program Field Surveys of Boring Sites Federal, State and Local Elected Officials Briefings Public Notices and Fact Sheet Posting and Distribution of Notices Public Facilities Websites Canvassing Field Outreach to affected/sensitive users Information Line

17 SR-710 Community Facilitation Scope of Work Coordinate Study Meetings Conduct Community Awareness Campaign & Report Public Input Study Information Office and Website Events & Presentations Community Workshops Focus Groups

18 For more information: SR-710 Technical Tunnel Study Information Office 3412 N. Eastern Ave. Los Angeles, CA Toll Free: (877) 710-INFO Tel. (323) Fax: (323)

19 Question and Answer