R-22 Alternative Refrigerants for Retrofit Part 1: Impact of the R-22 Phase-out Part 2: Managing Existing R-22 Resources Part 3: R-22 Refrigerant Alternatives.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
Background images courtesy of abc.com 1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
R410a Training R410 Refrigerant… Why and When?
Variations of the Turing Machine
APPA CEO Roundtable Phoenix, AZ March 15, 2011
1
Job Order Costing Chapter 4.
1 HCFC Phase –out in Air Conditioning Sector Background, Challenges and Progress Sidi Menad SI AHMED 17 TH October 2012.
M o n t r e a l P r o t o c o l, O E W G - 3 0, G e n e v a, J u n e XIX/8 Report on HCFC Alternatives for High Ambient Temperature.
NTDB ® Annual Report 2010 © American College of Surgeons All Rights Reserved Worldwide National Trauma Data Bank 2010 Annual Report.
Create an Application Title 1Y - Youth Chapter 5.
CALENDAR.
1 Advanced Tools for Account Searches and Portfolios Dawn Gamache Cindy Bylander.
The 5S numbers game..
Air Conditioning EPA Type III.
Refrigeration Cycles د/ محمود عبدالوهاب.
Everything you wanted to know about web performance* *but were afraid to ask.
An Impact Analysis of Electrifying Florida’s Public Buses
Coach Air Conditioning
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Gilbert Noussitou NUTRITION L3 COOK & CHILL and COOK & FREEZE SYSTEMS.
Employee & Manager Self Service Overview
R-22 Alternative Refrigerant Seminar The R-22 Phase-out How To Survive & Prosper by Being Prepared.
User Friendly Price Book Maintenance A Family of Enhancements For iSeries 400 DMAS from Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro.
What is. SummitPlus + is a high performance replacement for R-22 refrigerant in R-22 AC systems.
The Challenge: Moving Away From HCFC Refrigerants.
MCQ Chapter 07.
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
Merchandise Inventory,
 Copyright I/O International, 2013 Visit us at: A Feature Within from Item Class User Friendly Maintenance  Copyright.
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP V-ANNUAL WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Development of a New Flammability.
Flexible Budgets and Performance Analysis
WorkKeys Internet Version Training
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Product Costing in Service and Manufacturing Entities
Chapter 11 Creating Framed Layouts Principles of Web Design, 4 th Edition.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Physics for Scientists & Engineers, 3rd Edition
Intravenous Solutions, Equipment, and Calculations
Cost-Revenue Analysis for Decision Making
1 © ©1999 South-Western College Publishing PowerPoint Slides prepared by Ken Long Principles of Economics 2nd edition by Fred M Gottheil.
Chapter 4 FUGACITY.
CCNA1 v3 Module 9 v3 A+ CORE JEOPARDY K. Martin CCNA1 v3 Module 9 RouterModesWANEncapsulationWANServicesRouterBasicsRouterCommands RouterModesWANEncapsulationWANServicesRouterBasicsRouterCommands.
ENVIRONMENTAL CONTROL UNIT MODEL A/E32C-45A P/N 1559AS400-1
SECTION 4 ELECTRIC MOTORS UNIT 9
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
ADDRESSING THE CHALLENGES TO HCFC PHASEOUT FOR THE CARIBBEAN By Alvin C. Daniell BSc MSc Caribbean Ozone Officers, Regional Workshop Organized by the United.
Air Conditioning EPA Type II.
Refrigerant Management
Section 2: Safety, Tools and Equipment, and Shop Practices
Session 5 Overarching and cross-cutting issues on technical aspects of HFC management.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
The Hashemite University of Jordan Faculty of Engineering Department of Mechanical Engineering 407C Refrigerant Mohammad Hammoudi Mohammad Al-Shrah.
INVENTORY CONTROL POLICIES Dokuz Eylül University Industrial Engineering Department Özge AVCI
1 Air Conditioning Refrigerants. 2 Desirable Refrigerant Properties Non-Toxic Non-Flammable Chemically stable Resistance to chemical breakdown Easy to.
Economics of refrigerant Recovery and
CCNA1 v3 Module 9 v3 A+ Type 1 JEOPARDY K. Martin.
Chapter 10 Training Package HCFC Phase-out RACSS – UNEP 2014 Refrigerant Recovery, Recycling & Cylinders.
Section 2: Safety, Tools and Equipment, and Shop Practices
EPA Section 608 Regulations
Leaky Appliance Trigger Rate
EPA Dates.
Presentation transcript:

R-22 Alternative Refrigerants for Retrofit Part 1: Impact of the R-22 Phase-out Part 2: Managing Existing R-22 Resources Part 3: R-22 Refrigerant Alternatives for Retrofit

Rick Roland is the owner and engineer of Certified Refrigerant Services, Inc. which is located in Punta Gorda, Florida. Rick has been in the refrigerant reclamation industry since its inception in 1995; one of the first reclaimers in the country. From the age of ten, he grew up in his father’s HVAC company and eventually became the owner of a Carrier Leadership dealer culminating over 40 years of hands-on experience. Rick has designed and built all the refrigerant reclaim and separation equipment used at CRS including a patent pending Modular Separation Machine™ (MSM). This advance technology is only possible by possessing an acute understanding of refrigerants and their technical characteristics. Rick is a well known qualified leader and authority in the refrigerant management industry.

Refrigerant Sales Refrigerant Buy-Back Refrigerant Banking Used Refrigerant Return Programs Cylinder “Swap” Programs Refrigerant Reclamation Refrigerant Separation Refrigerant Purity Testing On-site High Speed Recovery On-site Refrigerant Reclamation On-site System Flushing On-site System Dehydration

High Speed Recover-Reclaim-Dehydration

Modular Separation Machine

CRS Production Area

R-22 Alternative Refrigerants for Retrofit

Part 1 Impact of the R-22 Phase Out

R-22 Phase-Out Schedule

EPA Forecast 2010

R-22 Phase-Out Schedule

EPA Projected R-22 Servicing Demand by End User ,500 MT (137,787,500 lbs.)

EPA Projected R-22 Servicing Demand by End User ,800 MT (185,538,480 lbs.)

Question What is the Current Status of R-22?

Part 2 Existing R-22 Management

Who Controls R-22 Availability & Price?

By recovering R-22 By returning R-22 for reclaim You keep a local inventory available which also keeps prices stable YOU!

Existing R-22 Management Rule #1: Rule #1: Rule #2: Get involved with R-22 return programs that benefit your company Rule #2: Get involved with R-22 return programs that benefit your company Rule #3: Don’t mix any other refrigerants with your recovered R-22! Rule #3: Don’t mix any other refrigerants with your recovered R-22! Don’t VENT!

Part 3 R-22 Alternatives So now we’re in season and what if there’s NO R-22?

R-22 Alternatives Unlike R-22 the R-4XX alternative refrigerants are BLENDS, or “zeotropic.” ZEO Who?

Zeotrope: A mixture made up of two or more refrigerants with different boiling points. Zeotropic mixtures are similar to near-azeotropic mixtures with the exception of having a temperature glide greater than 10° F. Zeotropic mixtures should be charged in the liquid state. Azeotrope A mixture made up of two or more refrigerants with similar boiling points that act as a single fluid. The components of azeotropic mixtures will not separate under normal operating conditions and can be charged as a vapor or liquid.

How many have performed an R-22 system retrofit to an alternative refrigerant? Question

Choosing An R-22 Alternative Refrigerant R-404aR-125 (44%)R-143a (52%)R-134a (4%) R-407cR-125 (25%)R-32 (23%)R-134a (52%) R-417aR-125 (46.6%)R-600 (3.4%)R-134a (50%) R-421aR-125 (58%)Proprietary OilR-134a (42%) R-422bR-125 (55%)R-600 (3%)R-134a (42%) R-422dR-125 (65.1%)R-600 (3.4%)R-134a (31.5%) R-507R-125 (50%)R-143a (50%)

What Do We Want From Our R-22 Alternative Refrigerant? No Major Hardware Changes To Equipment Use The Same Oil Type Fast, Simple Conversion Sufficient Capacity At Least the Same Energy Efficiency Reliability Same Toxicity Flammability Classification as R-22 Zero Ozone Depleting Potential Reasonable Cost

R-407C Recover the R-22 from the system Remove the compressor Remove the mineral oil from the compressor Reinstall the compressor Vacuum system Add POE oil & the R-407C refrigerant charge Run system for 72 hours Test the system oil to assure the it is < 1% residual mineral Repeat entire procedure if necessary Download guidelines from Technical Reference Library –

R-404A Recover the R-22 from the system Remove the compressor Remove the mineral oil from the compressor Reinstall the compressor, with POE oil, vacuum the system Reinstall the original R-22 charge Run system and test for the residual mineral oil. 5% or less is acceptable With the correct oil content, recover the R-22, vacuum the system and recharge with R-404A Adjust the system charge and refrigerant flow. Download guidelines from Technical Reference Library –

R-417A Recover the R-22 from the system Weigh the R-22 removed Vacuum the system Add 90% of the weight of the R-22 charge Run system Adjust the system charge and refrigerant flow as required Download guidelines from Technical Reference Library –

R-422A/B/C/D Recover the R-22 from the system Weigh the R-22 removed Vacuum the system Add 90% of the weight of the R-22 charge Run system Adjust the system charge and refrigerant flow as required Flow control devices may need to be changed. Download guidelines from Technical Reference Library –

R-507 Recover the R-22 from the system Remove the compressor Remove the mineral oil from the compressor Reinstall the compressor, with POE oil, vacuum the system Reinstall the original R-22 charge Run system and test for the residual mineral oil. 5% or less is acceptable With the correct oil content, recover the R-22, vacuum the system and recharge with R-507 Adjust the system charge and refrigerant flow. Download guidelines from Technical Reference Library –

R-421A Recover the R-22 from the system Weigh the R-22 removed Vacuum the system Add 90% of the weight of the R-22 charge Run system Adjust the system charge and refrigerant flow as required Download guidelines from Technical Reference Library –

Let’s Recap

Rule #1: Rule #1: Rule #2: Get involved with R-22 return programs that benefit your company Rule #2: Get involved with R-22 return programs that benefit your company Rule #3: Don’t mix any other refrigerants with your recovered R-22! Rule #3: Don’t mix any other refrigerants with your recovered R-22! Existing R-22 Management Don’t VENT!

Choose An R-22 Alternative Refrigerant

If there’s abundant R-22 and it’s reasonably priced then we’re good to go…But if NOT

Be Prepared! If there’s abundant R-22 and it’s reasonably priced then we’re good to go…But if NOT

OR

Technical Reference LibraryTechnical Reference Library Technical VideosTechnical Videos R-22 Cylinder “Swap” ProgramsR-22 Cylinder “Swap” Programs –And much more…