February 5 & 6, 20022002 Spring Gas-Lift Workshop1 2002 ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation,

Slides:



Advertisements
Similar presentations
February 5 & 6, Spring Gas-Lift Workshop Spring ASME/API Gas-Lift Workshop Proposed New API RP 11V10 Recommended Practice for Operation,
Advertisements

Wiki Use Case: Managing Team Mtg Agendas, Minutes, & Tasks Sean Murphy, SKMurphy Inc. Lunch & Learn (People-On-The-Go )
ACM SIG Marketing, Communications & Membership Workshop1 ACM Marketing, Communications and Membership Workshop Presented by Lillian Israel, Brian Hebert,
7th xbrl workshop1 CENTRAL BANK OF CYPRUS IMPLEMENTATION OF COREP & XBRL VII European Banking Supervisors XBRL Workshop Munich, 9 May 2007.
ISO ESP Systems Task Group Leader, Shauna Noonan
2001 ASME/API Gas-Lift Workshop
Configuration Management
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Enrich the lexicons for the 1 st domain based on partners remarks.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
At a glance (Project Management Methodology) at a glance (Project Management Methodology) Pierre Bonnal DG-DI Maintenance Management Workshop 25 th November.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
API GAS LIFT TASK GROUP CHAIR - JIM BENNETT EXXONMOBIL.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Chapter 4: Overview of Preventive Maintenance
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
1 Planning of the Stage 3 In-depth Review 2008 Joint TFEIP/EIONET air emissions meeting Tallinn, May 2008 Martin Adams Expert Panel on Review European.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
Define the project identify potential funding sources gather information write and package the proposal submit the proposal to a funder Piece of cake?
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.
Spring 2002 ASME/API Gas-Lift Workshop General Layout of Workshop and Call for Papers/Presentations General Instructions The workshop will be held at the.
XP New Perspectives on Microsoft Office FrontPage 2003 Tutorial 7 1 Microsoft Office FrontPage 2003 Tutorial 7 – Creating and Using Templates in a Web.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 11V Task Group 15 November, 2007 Houston, USA.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 24 – 27, 2014 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
Kigali Independent University
BTT presentation to SG-6, Osaka, Japan, March Browse Task Team Progress to date, future plan 6th SG Meeting, Osaka Osamu Ochiai (NASDA) Browse Task.
Publishing Services Bureau Web Communications Services Tips for managing the publication process Communications Workshop October 23, 2003.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
WGISS Subgroup Meeting May 7-10, 2002 Frascati CINTEX Task Team Federation Help Desk NASDA Status Report Osamu Ochiai NASDA/EORC Ben Burford RESTEC.
Nov. 13, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Gas-Lift Future An Extension of the Past, or a Whole New World? by Cleon.
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February , 2015 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 4: Overview of Preventive Maintenance IT Essentials 5.0.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 29 – March 2, 2016 Compression/Facilities Troubleshooting Breakout.
2002 Spring ASME/API Gas-Lift Workshop
2013 ASME/ALRDC Gas-Lift Workshop
DROPS Focus Groups Human Factors
Task Group Status January ,11, 2017
AERODROME MANUAL.
The International Plant Protection Convention
API SC 10, Work Group 3 Update:
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
2001 ASME/API Gas-Lift Workshop
Spring 2003 ASME/API Gas-Lift Workshop
API S64 Summer Conference Update.
ISO Task Group Update Wayne Mabry.
For more information or to nominate papers, displays, etc., contact:
CHAIR - JIM BENNETT EXXONMOBIL
2001 ASME/API Gas-Lift Workshop
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
For more information or to nominate papers, exhibits, etc., contact:
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Gas-Lift Breakout Session Report Out Fall 2003 Gas-Lift Workshop
For more information or to nominate papers, displays, etc., contact:
Draft revision of ISPM 6: National surveillance systems ( )
CHAIR - JIM BENNETT EXXONMOBIL
Data Analysis and Reporting
2002 Spring ASME/API Gas-Lift Workshop
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
2002 Spring ASME/API Gas-Lift Workshop
Presentation transcript:

February 5 & 6, Spring Gas-Lift Workshop ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations by Cleon Dunham, Oilfield Automation Consulting

February 5 & 6, Spring Gas-Lift Workshop2 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Status API RP 11V5 is an existing documentAPI RP 11V5 is an existing document –API Task Group agreed to update document –API RP 11V5 Work Group was formed –Work Group agreed to incorporate part of API RP 11V8 into 11V5 –This has become Section II of 11V5 –Document has been under review for six (+) years –The process was delayed while the chairman took an extended vacation in Europe (4.5 years) –It was further delayed when chairman lost the electronic version and had to "scan" the entire document

February 5 & 6, Spring Gas-Lift Workshop3 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Status The document is formatted for easy reference, and may be placed "on line" in hypertextThe document is formatted for easy reference, and may be placed "on line" in hypertext –This format has been approved by the Task Group –This has not be used before by API Extensive review and comments have made and incorporated from:Extensive review and comments have made and incorporated from: –Jack Blann –Joe Clegg –Cleon Dunham –Eric Laine –John Martinez

February 5 & 6, Spring Gas-Lift Workshop4 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Status Document has been placed on API Gas-Lift web siteDocument has been placed on API Gas-Lift web site – –Any member of the API gas-lift Task Group can access it, and all have been invited to do so We need to agree on a "cut off" date for "final" review and commentsWe need to agree on a "cut off" date for "final" review and comments –Any volunteers to perform more editing? We need to work on the figuresWe need to work on the figures –Any volunteers to help with the figures?

February 5 & 6, Spring Gas-Lift Workshop5 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Outline I.Introduction II.Gas-Lift Operating System Components & Potential Problems 1.Purpose and Summary of Recommended Practices 2.Typical Gas-Lift Operating Problems 3.Components of an Operating Gas-Lift System 4.Surface Gas-Lift Compression, Dehydration, and Distribution 5.Gas Injection Metering and Control 6.Gas-Lift Valves No. of Pages

February 5 & 6, Spring Gas-Lift Workshop6 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Outline II.System Components & Potential Problems (Continued) 7.Well Equipment --- Tubulars and Well-Head 8.Gathering System --- Flowline and Manifold 9.Well Production Rate Testing Facility 10.Production Handling System 11.Guidelines for Collecting & Using Key Operating Information 12.Guidelines for Effective Surveillance and Control No. of Pages

February 5 & 6, Spring Gas-Lift Workshop7 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Outline III.Recommended Practices for Gas-Lift Operation, Maintenance, and Troubleshooting 1.Procedures for Initial Unloading and Kick Off 2.Procedures for Adjusting (Fine Tuning) Gas-Lift Injection Rates 3.Gas-Lift Troubleshooting Diagnostic Tools 4.Recommended Practices for Wells That Produce Sand 5.Typical Locations of Gas-Lift Problems No. of Pages

February 5 & 6, Spring Gas-Lift Workshop8 API RP 11V5 Continuing the Review of Recommended Practices for Operation, Maintenance, and Troubleshooting of Gas-Lift Installations Outline III.Recommended Practices for Gas-Lift Operation, Maintenance, and Troubleshooting (Continued) 6.Possible Causes and Cures of Some Common Gas-Lift System Problems 7.Gas-Lift Troubleshooting Check List No. of Pages 12