1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.

Slides:



Advertisements
Similar presentations
Michigan Department of Transportation Michigans Infrastructure Needs and Funding 2013.
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
Chapter 16 Unemployment: Search and Efficiency Wages.
Advanced Piloting Cruise Plot.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
Smarter Travel Programmes– Financial impacts for Transport for London COLIN BUCHANAN
1 Performance Indicators: Selection, Application, and Reporting Presented by John M Rodgers Federal Aviation Administration.
Regional Routing Model Review: C) Model Formulation and Scenario Analysis Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Executive Session Office of Asset Management
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
Addition Facts
Institute for Road Construction and Maintenance - Vienna University of Technology ISTU O PTIMIZED P AVEMENT D ESIGN W ITH R ESPECT TO Q UALITY AND E CONOMY.
1. 2 Objectives Explain how to implement green fleets Learn about incentives for utilizing idle reduction technologies and strategies Learn about the.
1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Water Distribution Systems – Part 1
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
Association of National Stakeholders in Traffic Safety Education Novice Teen Driver Education and Training Administrative Standards – Strategic Plan Development.
ABC Technology Project
Real Estate Market Analysis
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Managing the Pricing Function 14.
1 AirWare : urban and industrial air quality assessment and management Release R5.3 beta DDr. Kurt Fedra Environmental Software & Services GmbH A-2352.
Insert the title of your presentation here Presented by Name Here Job Title - Date A reduction in fatal casualties Who, why and what does this mean? Louise.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
VOORBLAD.
Employer pays monthly fees for all employees Key disadvantage = Pay regardless of usage 100 employees x $15/m = $1,500/month 100 employees x.
Squares and Square Root WALK. Solve each problem REVIEW:
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 4.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
Performance Measures CTP 2040 Policy Advisory Committee August 19, 2014.
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
Transforming Transportation: The Role of Intelligent Transportation Systems Matthew J. Schiemer, PE August 18, 2011.
Life Cycle Cost Analysis
Benefit Cost Analysis Nathaniel D. Coley Jr
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
ETSI Methodology1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH.
Economic Analysis: Applications to Work Zones March 25, 2004.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Maintenance & Rehabilitation Strategies Lecture 5.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Laurie Leffler, Division Administrator
Presentation transcript:

1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration

2 Roadway User Costs Nathaniel D. Coley Jr. Agenda Topics 1.Analysis Basics 2.User Costs Components 3.Conceptual Framework 4.Example 5.Conclusion

3 Roadway User Costs Nathaniel D. Coley Jr. Premise Prefabricating bridge elements and systems (PBES) offers major : time savings, cost savings, safety advantages, and convenience for travelers. ~from EDC-PBES Website

4 Roadway User Costs Nathaniel D. Coley Jr. The PBES Decision 1.Qualify? 2.Quantify. Monetize Benefits

5 Roadway User Costs Nathaniel D. Coley Jr. Strategy – Compare Costs Value and compare WZ Roadway User Costs for traditional approach and use of PBES to determine if the construction premium justifies additional investment.

6 Roadway User Costs Nathaniel D. Coley Jr. Strategy – Compare costs Work Zone Impacts from Traditional Construction V.S. Work Zone Impacts from PBES Traditional Construction costs V.S. PBES Construction Costs

7 Roadway User Costs Nathaniel D. Coley Jr. Roadway User Costs Components Definition Costs to highway users over the life of a Highway Project Components Delay Costs – Costs associated with an increase (or decrease) in the amount of time it takes for a user to travel from point A to B. (In our case, navigating through or around a work zone) Vehicle Operating Costs – Costs attributable to the operation or maintenance of a vehicle(brake wear, idling, fuel consumption, tire ware, etc.) Crash costs-Cost resulting from property damage, injuries, or loss of life

8 Roadway User Costs Nathaniel D. Coley Jr. Roadway User Costs - Roadway User Time Value Business travel is valued at wage plus benefits Personal travel is valued at what travelers are willing to pay to reduce travel time Usually a percentage of wage People do value their time

9 Roadway User Costs Nathaniel D. Coley Jr. Roadway User Costs Vehicle Operating costs are a function of additional wear and tear on the vehicle caused by the work zone. Costs include: Fuel Consumption Engine Oil Consumption Tire Wear Repair & Maintenance Mileage related depreciation

10 Roadway User Costs Nathaniel D. Coley Jr. Roadway User Costs Depreciation costs are a function of aging and usage over time. Sources of data includes American Automobile Association(AAA), American Transportation Research Institute(ATRI)

11 Roadway User Costs Nathaniel D. Coley Jr. Roadway User Costs Crash costs are a function of the change in crash rates caused by work zones. Crash costs are a function of: Crash rate/frequency Crash Severity Unit Cost of crashes

12 Roadway User Costs Nathaniel D. Coley Jr. Comparing Work Zones Strategies Each construction/WZ strategy involves tradeoffs Agency vs. user costs Initial vs. long-term costs An analysis of roadway user costs permits comparison of cost tradeoffs

13 Roadway User Costs Nathaniel D. Coley Jr. Benefits from Transportation investments Initial Capital Cost Year Dollars Benefits Costs Typical Life-Cycle Profile: A Project Level Perspective Example Direct Benefits Life-Cycle Cost Savings Reduced Accident Costs Reductions in Delay Costs Reduced noise or emissions Example Indirect Benefits Land use impacts Employment Non-user benefits

14 Roadway User Costs Nathaniel D. Coley Jr. 1.Existing Costs on construction Route(Pre-WZ) 2.Additional Costs from WZ Work Zone 1.Existing cost on detour route(Pre-WZ) 2.Additional Costs of detoured traffic on Detour Route WZ Impacts

15 Roadway User Costs Nathaniel D. Coley Jr. Conceptual Work-Zone impact on travel speed

16 Roadway User Costs Nathaniel D. Coley Jr. Benefits Activities Major Activity Initial Activity Costs $ $ Time What is the present value of future sums? What ROI do taxpayers(our investors) want?

17 Roadway User Costs Nathaniel D. Coley Jr. Example Traditional Concrete Girder Construction vs. Precast Beams with slab sections, hour closure vs. 3 months of nighttime work zones 25,000 vehicles Average Daily Traffic, rising to 60,000 ADT in 35 years

18 Roadway User Costs Nathaniel D. Coley Jr. Example (Continued) Precast Section is estimated to cost 20% more than traditional approach but last 20% longer Nighttime work zones increase agency cost by 10%

19 Roadway User Costs Nathaniel D. Coley Jr. Example (Continued) 4% real discount rate 35 year analysis period 24 hr WZ Night Work

20 Roadway User Costs Nathaniel D. Coley Jr. Example Results

21 Roadway User Costs Nathaniel D. Coley Jr. Example Results (Continued) Least cost option for the agency (Traditional/24 hours) is highest cost for travelers Using PBES reduces traveler cost due to shorter initial construction time and fewer rehabilitations Nighttime work zones eliminate most of delay for Traditional and PBES at little additional cost to the agency

22 Roadway User Costs Nathaniel D. Coley Jr. Quantifying Benefits of PBES Need simple way of quantifying, “time savings, cost savings, safety advantages, and convenience.”

23 Roadway User Costs Nathaniel D. Coley Jr. Work-Zone Costs - Find the Number

24 Roadway User Costs Nathaniel D. Coley Jr. Conclusion 1.Analysis for deciding to implement PBES is a function of: Direct User impacts(capacity analysis of monetized costs to Users) Life-cycle cost savings? 2.Resources exist(Complex to simple)

25 Roadway User Costs Nathaniel D. Coley Jr. FHWA Resources FHWA Work-Zone Road User Costs Process Values References One-Stop Shop on good practice calculating Work-zone user costs Bridge Life-Cycle Cost Analysis Workshop FHWA Rule of Thumb Charts(Draft Final) FHWA BLCCA Tool(Under Development) FHWA RealCost LCCA Software(free excel spreadsheet)

26 Roadway User Costs Nathaniel D. Coley Jr. MAP-21 Goal Areas SAFETY- Reduce fatalities & serious injuries on all public roads. INFRASTRUCTURE CONDITION- maintain state of good repair. CONGESTION REDUCTION- reduce in congestion on the NHS SYSTEM RELIABILITY- Improve the efficiency FREIGHT MOVEMENT & ECONOMIC VITALITY- To improve the national freight networks and access ENVIRONMENTAL SUSTAINABILITY- protect the environment. REDUCED PROJECT DELIVERY DELAYS- To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices.

27 Roadway User Costs Nathaniel D. Coley Jr. Thank You Nathaniel D. Coley Jr. Federal Highway Adm. Washington, DC