TVB Analysis of SQAD National and Local Market Cost Estimate Data

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AP STUDY SESSION 2.
1
Worksheets.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Break Time Remaining 10:00.
The basics for simulations
Division- the bus stop method
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 TV Viewing Trends Rivière-du-Loup EM - Diary Updated Spring 2014.
© 2012 National Heart Foundation of Australia. Slide 2.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
Presentation transcript:

TVB Analysis of SQAD National and Local Market Cost Estimate Data Updated with Q2 2012 Data Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q1 2009-Q2 2012 TVB Analysis of SQAD National and Local Market Cost Estimate Data

“Why should I use Spot TV when I can buy Network for the same cost as the top 20 markets and get the other 190 for free?”

Scatter Network/Spot Variables Quarter Daypart Demo Q-to-Q and Y-to-Y Changes Volatility Political

Scatter Network/Spot Consistencies TSA Viewers/DMA Viewers SQAD 3rd Party Data Media Market Guide National Report Media Market Guide Local Edition

Network Scatter vs. Spot TV CPM A25-54 14-Quarter Average Cost Comparisons – Q1/09-Q2/12

Early Morning A25-54 CPM — Network Scatter vs. Spot

Early News A25-54 CPM — Network Scatter vs. Spot

Primetime A25-54 CPM — Network Scatter vs. Spot

Primetime/Prime Access A25-54 CPM — Network Scatter vs. Spot

Late Night A25-54 CPM — Network Scatter vs. Spot

Late Night/Late News A25-54 CPM — Network Scatter vs. Spot

Cable News vs. Spot Early Morning A25-54 CPM

Syndication Scatter vs. Spot Access A25-54 CPM

“Why should I use Spot TV when I can buy Network for the same cost as the top 20 markets and get the other 190 for free?”

2nd Quarter 2012 Network Scatter vs. Spot TV — CPM A25-54 Spot DMA Spot TSA Early Morning $22.87 $17.92 $13.26 Early News 25.24 23.83 17.47 Prime 48.25 48.62 36.15 Late Night 36.11 19.88 14.40 Total $132.47 $110.25 $81.28

2nd Quarter 2012 Spot TV CPM Projections vs 2nd Quarter 2012 Spot TV CPM Projections vs. Network Scatter SQAD A25-54 DMA CPM Basis Markets Early Morning Early News Prime Late Night 1-10 $18.88 $24.47 $63.87 $20.19 1-20 18.80 24.56 60.38 19.69 1-30 18.29 23.83 56.62 18.98 1-50 17.59 22.83 51.82 18.11 1-80 17.14 22.28 48.46 17.91 1-100 22.31 47.77 18.21 1-210 17.92 48.62 19.88 Network Scatter $22.87 $25.24 $48.25 $36.11

2nd Quarter 2012 Spot TV CPM Projections vs 2nd Quarter 2012 Spot TV CPM Projections vs. Network Scatter SQAD A25-54 TSA CPM Basis Markets Early Morning Early News Prime Late Night 1-10 $15.01 $19.38 $50.41 $15.90 1-20 14.83 19.29 47.50 15.43 1-30 14.40 18.62 44.33 14.84 1-50 13.92 17.97 40.75 14.22 1-80 13.34 17.26 37.72 13.83 1-100 13.27 17.18 37.04 13.97 1-210 13.26 17.47 36.15 Network Scatter $22.87 $25.24 $48.25 $36.11

A25-54 CPM Change 2Q 2012 vs. 1Q 2012 Network Spot DMA Spot TSA Early Morning +22% +23% Early News +29% Prime +38% +20% Late Night +12%

A25-54 CPM Change 2Q 2012 vs. 2Q 2011 Network Spot DMA Spot TSA Early Morning +1% +9% Early News +2% +6% Prime +3% +15% +16% Late Night +4% +7%