Legislation, Ordinances & Energy Codes: the Future for Outdoor Lighting David M. Keith, FIES IEEE Denver March 2003.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

IECC 2006 Issues and Solutions Code Overview and Issue Solving Products.
Introduction to Outdoor Lighting And How it Affects Light Pollution IDA in Partnership with NOAO, NSF and IYA Dark Skies Awareness.
Applicants Rob & Judi McCarthy, SLO County Permit #DRC
Energy Codes & Lighting Controls
LAMPS (Chapter 3) Lamp efficacy, life, and color Incandescent
Lighting concepts – Ballasts and Lighting Controls
Fencing. Galvanized/Aluminized –11 gage 1-3/4 mesh min. standard –9 gauge 1-3/4 mesh recommended min. for public facilities Clad –9 gage core, vinyl,
OBTRUSIVE LIGHTING.
© Fluent Inc. 4/16/ Introductory GAMBIT Notes GAMBIT v2.0 Jan 2002 Fluent User Services Center Edge and Face Meshing.
The Model Lighting Ordinance James R. Benya, PE, FIES, IALD, LC BENYA LIGHTING DESIGN And The Benya Burnett Consultancy.
The B.U.G. Rating System Klaus Bollmann
Light Pollution and the IES IESNA/IDA Model Lighting Ordinance Part 1: The View of an Astronomer Dan Caton.
Design Concept Development Districts William F. Ross ROSS+associates.
Van Ness BRT Lighting Criteria Lighting Performance Characteristics.
Weld County Division 6 Wind Generators and Permitting Requirements Sec Wind generator standards. Chris Gathman, Planner III, Weld County WIND.
Why BoldPlay? Brilliant Design. Intuitive Engineering Innovation + Design = Performance Serious Energy Savings Ideal direct/indirect distribution maximum.
Evaluating Roadway Lighting Systems Using Unit Power Density
70 o Spec Compliant Light Source: Drive the light out without waste and glare Produces uniform illumination Minimal uplight or glare Light at or below.
Changes to Mandatory Title 24 Lighting Requirements Bill Blackley LC Director Product Marketing California's new building energy efficient standards took.
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Board of County Commissioners 9/27/2011.  Minor Amendment to Existing Special Use Permit for Oak Hall Private School to modify conditions relating to.
83 years of excellence The Association of Electrical and Medical Imaging Equipment Manufacturers Federal Legislation: Outdoor and Street Lighting Kyle.
Learning from Roadway Lighting Research By David M. Keith October 2002.
Update on the Proposed Urban Agriculture Regulations Planning Commission August 20, 2014.
Photometric Data Photometry is the science of measurement of light.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Sector Planning Process Alachua County Commission July 8 th,
ARCHITECTURAL DESIGN Residential Design Criteria 1 1 Copyright © Texas Education Agency, All rights reserved.
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
Artificial Lighting Design Task lighting for general purpose rooms involves the installation of light sources that will provide the optimum amount of.
Landscape for Deemed Lighting Workpapers Building Code and Voluntary Program Relationship Building Code Changes Driven by Big Vision Voluntary Program.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
LIGHTING FOR LIVING Connected Home Conference 2011.
Board of County Commissioners PUBLIC HEARING Lake Avalon Rural Settlement Commercial Design Overlay District March 10, 2009 Board of County Commissioners.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
WEST BERKELEY PROJECT Master Use Permits (MUP) May 15, 2012 Response to Concerns & Issues.
Board of County Commissioners Public Hearing 9/27/2011.
Community Development Department GEA AUTO SALES Special Exceptions to allow automotive repair and maintenance and vehicle sales.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
code calculations, construction drawings
Zoning pt. III. Intensity Regulations Meant to dictate the intensity of use Different standards for different use districts –Minimum lot size –Minimum.
Board of County Commissioners Lake Avalon Rural Settlement Commercial Design Overlay District February 24, 2009 Board of County Commissioners Lake Avalon.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
Exterior LED Area Lights
STAKEHOLDERS MEETING JKV- OAK PARK JANUARY 15, 2016 Orange City Sign Code Review 1.
Lighting Beyond the Bulb LED Lighting and Lighting Management Solutions Todd Smith
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
Ordinance No. 544-B Proposed Amendments to the City of Southlake Landscape Ordinance Item 6A.
©2010 Acuity Brands Lighting, Inc. All rights reserved. ©2011 Acuity Brands Lighting, Inc. All rights reserved. Delivering the promise of LED’s… with two.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
OLW LED Wall Pack Introduction Product Overview Applications Photometric Comparisons OLW14 Photometrics Savings Comparison Promotions and Merchandising.
TREE ORDINANCE WORKSHOP DISCUSSION September 3, 2014.
16 February 2016 James Madison University Charles Hendricks, AIA, CSI, CDT, CGP, CAPS, LEED AP The Gaines Group, PLC
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
© International Dark-Sky Association Lighting 101; A few basics International Dark-Sky Association
Animal Care Facilities
commercial zoning Expansion Initiative
Potential Local Impacts from Proposition 64 and Measure L
Community Development November 2011
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
Code Amendments to SMC 19A Planning Commission Meeting
Mayor’s Task Force On Adoption of 2006 I-Codes
City Council Meeting November 14, 2016
Agri-Nature Entrepreneurship
Board of County Commissioners
WSUP The Club at ArrowCreek Grading
Presentation transcript:

Legislation, Ordinances & Energy Codes: the Future for Outdoor Lighting David M. Keith, FIES IEEE Denver March 2003

Overview Legislation –Colorado and six other states Ordinances –county, city and town jurisdictions Energy Codes –states level, and may become national Implications for the lighting industry –more work, deliverables and responsibilities

Colorado Legislation Colorado HB passed in 2001 It is declared policy of the state of Colorado to conserve energy, reduce glare, and minimize light trespass and pollution, and requiring state agencies and encourage local.. entities.. to use certain types of outdoor lighting fixtures … no provisions for enforcement

Colorado Legislation Full cutoff luminaire allows no direct light emissions above horizontal plane through luminaires lowest light-emitting part On or after July, 2002 any new fixture.. using state funds.. [must be] a full cutoff luminaire Full consideration given to costs, energy conservation, glare reduction, minimization of light pollution, preserve night environment

California Energy Code working to extend the current Title 24 Energy Code to outdoor lighting establish lighting zones across state establish lighting power density allowances for all zones and tasks establish restrictions on luminaire lighting distributions, time of day uses

California Energy Code Based technically on the Eley Associates Outdoor Lighting Research: California Outdoor Lighting Standards, presented at the June 18, 2002 workshop in some discussions in this report the technical basis is … questionable –LZ assignment & LPD value classify roadways –the calculations for parking lots

CEC: Outdoor Lighting Report Parking area typical for LPD calculation –9 sym. luminaires in regular 3x3 grid –locus of minimum illuminance identified –claims to be in compliance with IESNA RP-20-98

CEC Lighting Zones lighting zones imposed across entire state –defaults defined in legislation –jurisdictions may change an areas designation through a public process –CEC is to be informed of any proposed changes to zone designations –CEC may overrule any change proposed by a local jurisdiction

CEC Lighting Zones LZ1: Dark State parks, recreation areas, wildlife preserves LZ2: Low Rural as defined by 2000 US Census LZ3: Medium Urban according to 2000 US Census LZ4: High By special designation only

CEC Lighting Zones all special designated LZ areas restricted by –adjacent areas must be specified distance from areas with different LZ can only be changed if adjacent to an area already designated with the new LZ –size may only be so big in some dimension this is very poorly written and probably subject to revision

CEC Lighting Zones each lighting zone has its own: – Lighting Power Density (LPD) allowances –specific control requirements –specific equipment requirements uplight ratio allowances may be included –specific performance requirements maximum illuminance allowed

CEC Details area definitions for different activities –Outdoor Sales Lot, Sales Canopy automatic controls for post-operating hours reduction of levels by 50% to 67% different areas around facility have different power allowances, non-transferable cutoff photometric distribution required for 175W & up

Model Lighting Ordinance organized by the International Darksky Association (IDA) working with national assortment of people considering a nation-wide set of existing ordinances, mostly Californias Title 24 trying to develop an ordinance that any jurisdiction can use as basis, then tweak to fit

Model Lighting Ordinance working from the California Title 24 will probably include –Lighting Zones 1 through 4 corresponding LPD limits corresponding photometric distribution limits –equipment & mounting restrictions –spill light and maximum illuminance limits –curfews and limits on security lighting

Local Lighting Ordinances Planning Dept., Zoning, Building, Land Use can be very simple - one page –no lighting shall create a nuisance –.. concentrated rays of light shall not shine onto other properties.. can be extremely complicated (as we shall see) can be technically confused or incorrect

Local Lighting Ordinances Similar goals to state legislation: –conserve energy –reduce glare –minimize light trespass and pollution provisions for enforcement –withholding permits and occupancy certificates –complaints leading to fines and imprisonment

Local Lighting Ordinances Applies to: –future developments (& existing?) –industrial & commercial –residential - at least multi-family Exempts (typically): –one or two family dwellings –public roadways, sports facilities Grandfathering: fixed period or at improvement

Local Lighting Ordinances control light levels –within site –at or just beyond property boundary restrict equipment, photometric distributions restrict installed lumens restrict time of operation require more extensive submittal for approval

Ordinances: Limit levels restrict the maximum illuminance level –typically measured horizontal at grade –this would be at the initial level (brand new) when the system is new the levels will be the very highest for the entire life of the system most lighting recommendations call for maintained values, at the low point of the maintenance cycle overall maintenance factors can be as low as 0.50 –can mean 2 or more calculations are necessary

Ordinances: Limit levels restrict the maximum uniformity ratio –typically measured as the maximum:minimum –could be average:minimum this is harder to verify at the site –uniformity will be related to the specific area over which it is calculated check that the areas in the calculations conform to the definitions in the relevant ordinance –provide necessary statistics in submittals

Ordinances: Restrict Equipment Lamps –some sources may be prohibited (LPS) –some sources may be approved (MH) –some sources may be ignored (HPS, LED) this puts approval into the hands of the plan reviewers –rated lumens are typically the relevant metric –lamp data may be required at submittal –some lamps can be substituted (most can not)

Ordinances: Restrict Equipment Lumens –measured in rated lamp lumens –in luminaire: set a maximum for any luminaire e.g. no more than 50,000 rated lumens (400W HPS) –per pole: set a maximum for set of luminaires e.g. no more than 100,000 lumens per pole –per acre: set an allowance scaled to the site typically in steps of 100,000 lumens per acre

Ordinances: Restrict Equipment Lumens / Acre –limit on total rated lumens permitted on site –for 100,000 lumens over 43,560 sqft (in 1 acre) and typical area luminaire efficiency of 75% –100,000 lms/ac * 0.75 / 43,560 sqft/ac = Eavg-initial = 1.7 fc at very best (probably 1.5 fc) –with LLF = 0.67, Eavg-maint = 1.1 fc or lower for each 100,000 lumens per acre allowed

Ordinances: Restrict Equipment Luminaire shape, form or configuration –fully shielded (and sometimes partially shielded) definitions vary - typically no light at horizontal –internal or external house side shields for luminaires at the perimeter of the site –flat glass or fill cutoff - check definitions –number of luminaires on a pole –floodlights, wall packs, barn lights, acorns limited or banned outright

Ordinances: Restrict Equipment Photometric distribution –definitions tend to differ substantially –asymmetric sometimes prohibited –most common definitions are based on IESNA Cutoff Classifications full cutoff, cutoff, semi-cutoff or non-cutoff defined to describe control of glare used now to try to limit uplight this confuses intensity with lumens

Ordinances: IESNA Cutoff Classes relative to lamp lumen rating combination of intensity limits in two zones –just below or anywhere above horizontal

Ordinances: Restrict Installation Mounting heights –by specific limits or matching to buildings –by area designation parking area, walkways, other –around site perimeter setback requirements tend to use 2.5 multiple pole height may be 40% of the distance to the nearest boundary

Ordinances: Restrict Installation Limits for light levels at or over property boundary (light trespass) –typically depends on the zoning of the land the light lands on: commercial or residential –measurement variations horizontal at grade: at boundary, or set distance in vertical at and perpendicular to property line line-of-sight: any direction at all (hard to predict!)

Ordinances: Restrict Operation Curfew periods –after business closes (or at a set time) until dawn –after curfew, only security lighting allowed additional controls required for shut-off –photocontrols are not enough, need timeclocks –requires time of day, day of week, power backup to insure reduced light levels –additional controls for starting security lighting

Ordinances: Restrict Operation Security Lighting (post-curfew lighting) –for walkways, entrances, outdoor retail sometimes –restriction on illuminance levels or percent of lighting equipment allowed to operate –may be required to be controlled by motion sensors this rules out typical HID area lighting equipment incandescent or fluorescent or ? for such systems –may result in a separate lighting system

Ordinances: Restrict Operation Security (post-curfew) lighting system –different equipment (poles, wiring, controls)? –different luminaires (sources)? –different burn hours different maintenance cycle increased maintenance requirements and costs –in some cases the requirements can allow for control designs that minimize these problems

Developments for Industry more work & responsibilities –find out what restrictions apply –establish definitions –extend control strategies –greater details in content of photometric plans –increase in deliverables for submittal & approval –more involvement in commissioning more fees for doing the same job

Developments for Designs restrictions and limits make it harder to: –focus on quality issues –respond to the context and surroundings –adopt the design to particular tasks especially for unusual or undefined tasks –improve system performance energy use will tend to increase initial and operating costs increase –improvise or innovate in ways we are used to

Developments for Designs restrictions and limits make it easier to: –control obtrusive and excessive lighting rein in the worst offenders obnoxious lighting forced to improve –advance the technology of outdoor lighting systems (by narrowing the additional costs) multi-level or dimming ballasts for HID lamps lumen maintenance control systems new lamps and sources when feasible (e.g. LEDs)

for links to specific information from Colorado area jurisdictions: for a copy: David M. Keith, FIES IEEE Denver March 2003