EMAS-IR: First Three Test flights (ER-2 809: 22, 28, 30 August 2012) 1.22 Aug: Roll-correction was not enabled for this flight. Some data collected. 2.28.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
AP STUDY SESSION 2.
1
Worksheets.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Slide 1Fig 24-CO, p.737. Slide 2Fig 24-1, p.740 Slide 3Fig 24-2, p.741.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
Brain Buster Math What fraction tells how many crayons are out of
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

eMAS-IR: First Three Test flights (ER-2 809: 22, 28, 30 August 2012) 1.22 Aug: Roll-correction was not enabled for this flight. Some data collected Aug: The Stirling cooler hangs during taxi flight, mission aborted after takeoff. Minimal data collected. 30 Aug: Stirling hangs but remotely re-set; system then operates continuously Demonstrated basic instrument functionality and ground support procedures Remote instrument control via new NASADT/EIP/Iridium system NPP VIIRS Under-flight Ground validation at Tahoe site (radiosondes, VSWIR & TIR radiometers, ASTER SST buoys Links to the quick-looks:

eMAS-IR: First Test flights (ER-2 809, 22, 28, 30 August 2012) Aug. 30 Flight Plan Pre-Flight and Ground Support Cart

Take Off

30 August 2012 Lake Tahoe (Stirling off) 26 32

30 August 2012 Lake Tahoe (Stirling off) 33 38

Stirling On/Off On (20:25UTC)Off (23:15UTC) Ch um Lake Tahoe 8/30/2012

Stirling Noise (EABB Test) Zoom

Non Stirling Noise All Port 1 (most severe in Band 4) Port 2 (All) Lake Tahoe 8/30/2012 Stirling Off (23:15UTC)

NEdT (C) On Off Band Band Band Band Band Band Band Band Band Band Band Band Band Noise Comparison (Stirling on/off) Ch Old MAS Gain Adjusted eMAS Stirling Off SDEV (Counts)

Issues to Address: Vacuum integrity (replace valves, O-rings, pumping aparatus) New Helium Leak Detector to deliver ~9/24) Remaining external data ingest: Synchro roll signal (back-up to POS-AV) IRIG-B time code, RS-232, misc. temps and voltages) Scanhead thermal regime Minco Heater operational? excessive cooling from the air-scoop Cryo-cooler shut-down on taxi BB calibration BB#1 reporting cuts off at -30C, which was reached on 8/30 when set to ‘Ambient’) Aeroglaze paint reflectivity measured by JPL 60-Hz noise coupling investigation: Induce vibration externally Inspect power supply, cryo-controller, and grounding circuitry design High Frequency noise in Ports 1 &2 Spectral alignment needed in Ports 1 &2; Gain adjustments in various bands