D E P E N D A B L E N A T U R A L G A S www.elpaso.com | NYSE:EP Customer Webex October 5, 2011.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1
Slide 1Fig. 17.1, p.513 Active Figure Slide 2Table 17.1, p.514.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Before Between After.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Lync Online Meeting September 18,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex September 17,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex July 16,
D E P E N D A B L E N A T U R A L G A S Customer Webex July 25 th, 2013.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex July 17,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex June 18,
D E P E N D A B L E N A T U R A L G A S | NYSE:EP Customer Webex September 6, 2011.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex May 22,
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex March 14,
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex October 21,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex August 20,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex April 16,
TGP Outages Remainder of the Year (Sept. thru Dec.)
Presentation transcript:

D E P E N D A B L E N A T U R A L G A S | NYSE:EP Customer Webex October 5, 2011

Review of Upcoming Outages October & Winter 2011 Gulf Coast Central Northern Q&A

Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary. Unless otherwise stated, all scheduled dates represent gas days as defined in the Tennessee Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time).

Scheduled dates are subject to change. Projects may be added, altered, delayed or cancelled. TGP will provide notice of such additions or changes via PASSKEY postings. Dates as posted on PASSKEY should be deemed correct in the event of conflicts between PASSKEY posted dates and dates within this presentation.

Green No Impact Anticipated Yellow Restrictions are possible, but not likely. With extended duration, restrictions could be necessary from time to time. Red Restrictions are probable, OR Meter(s) affected, OR Combination of the above.

Branch line inspection (M) MLV 33-1 to /18 to 10/20 MLV 26-1 to /11 to 10/13 MLV 19-1 to /3 to 10/8 MLV 14-1 to /24 to 11/2 Station 703 Repair seal 10/4 to 10/6 Station 40 Unit 500 C1 Unit inspection 10/10 to 10/13 MLV to Cleaning/Caliper/ILI pigging 10/10 to 10/13 523M-7300 and 523M-7600 Line abandonment (M) 10/4 to 10/15 Anomaly remediation MLV 41-1 to 42-1 (M) 10/3 to 10/12 MLV 45-1 to /7 to 10/14 MLV 43A-100 to A Maintenance pigging (M) 10/12 Station 827 Peco filter change 10/12 to 10/14 Vermilion 245 Vent stack/filter separator installation 10/1 to 10/15 MLV 20 to 21 (all three lines) Line lowering 9/10 to 10/17 Station 409 Unit 1A Maintenance 10/17 Maintenance Pigging St 823 to St 40 10/20 St 823 to St /20 BluewaterSystem Pigging operations 10/18 to 10/23 MLV 16-3 to 17-3 Relocate pig receiver 10/6 to 10/24 Bear Creek Storage Fall shut in test. 10/18 to 10/24 Station 1 ESD Test 10/27 MLV 9-1 to 11-1 Maintenance pigging 10/27 Hydrostatic test MLV 25-2 to /4 to 10/31 MLV 32-3 to /4 to 10/31 MLV 21-3A to 22-3 Line lowering (M) 8/18 to 11/1 MLV 7-2 to 9-2 Emergent anomaly 7/19 to 12/31 Maintenance pigging 409A-1100 (Rio Bravo) 11/1 409A-100 (Pemex) 10/27

Anomaly remediation MLV to (M) 9/20 to 10/5 MLV to (M) 10/26 to 10/29 MLV to (M) 10/5 to 10/12 Station 96 MCC replacement 10/3 to 10/14 Anomaly remediation MLV to /24 to 11/18 MLV to /12 to 10/26 MLV to /19 to 10/7 MLV to ILI pigging10/13 MLV to Anomaly remediation 10/3 to 10/14 Anomaly remediation MLV 83-1 to /5 to 10/20 MLV 80-1 to /17 to 11/8 MLV to Emergent anomaly 7/27 to 10/21 Station 87 E Bldg outage 10/17 to 10/21 MLV to Cleaning/Caliper/ILI pigging 10/17 to 10/27 Station 843 Yard welding 10/26 to 10/27 Station 200 MCC replacement 10/17 to 10/31 MLV to Pipe replacement 10/22 to 11/4 MLV 200-4B to Valve replacements 10/24 to 12/2 MLV 40-2 to 47-2 Pipeline Outage 4/14 to 11/1 (est)

Anomaly remediation MLV 313A-403 to /20 to 10/8 MLV 313A-406 to /3 to 10/5 MLV 313A-410 to /3 to 10/5 300 Line Tie-ins MLV 314A-101 to /17 to 10/20 MLV 317-AD2 to 317A-101 9/26 to 10/5 MLV 320-2L to /17 to 10/20 MLV to /6 to 10/12 MLV to 325D /16 to 10/20 Emergent anomaly MLV to /12 to 10/7 MLV to /24 to 10/5 Station 319 ESD test (1 day) 9/28 to 10/7 Station 265E Replace BPS system 10/3 to 10/7 Fall shut in test Harrison Storage 10/3 to 10/7 Hebron/Ellisburg 10/24 to 10/28 MLV to Efficiency pigging 10/11 MLV to Cleaning Pig 10/11 Station 245 Unit maintenance 10/3 to 10/13 Station 229 Unit maintenance 10/11 to 10/13 MLV 270B to -105 ILI pigging 10/11 to 10/13 Meter (Union City) Meter modifications (M) 10/12 to 10/13 MLV 270B-105 to -106 ILI pigging 10/110to 10/14 Station 241 B Unit maintenance 10/10 to 10/15 Unit 3A maintenance 10/16 to 10/28 Meter (Sabinsville) Meter upgrade (M) 10/1 to 10/16 Station 313 Unit maintenance 9/6 to 10/20 Station 270B ESD Test 10/25 to 10/26 Anomaly remediations MLV to MLV to MLV to /18 to 10/28 MLV to Pipe relocation (M) 10/24 to 10/31 MLV to Hydrostatic test 10/24 to 11/4 MLV and Concord Lateral Emergent anomaly 9/13-11/1 Pipeline Outage MLV to /1 to 11/1 (est) MLV to /1 to 11/1 (est)

Efficiency pigging MLV 32-1 to 40-1 (M) 11/8 MLV 32-3 to 40-3 (M) 11/9 MLV 17-1 to 9-1 Maintenance pigging 11/16 Branch line inspection (M) MLV 14-1 to /24 to 11/2 MLV 15-1 to /8 to 11/10 MLV 3-1 to /14 to 12/3 Carthage St 40 Pipe replacement 11/1 to 11/3 Station 703 Unit maintenance 11/1 to 11/3 Station 527 MCC replacement 11/7 MLV to Maintenance Pigging 11/7 to 11/12 MLV to Anomaly remediation (M) 11/11 to 11/14 Line 21B-100 (Tomball Line) Hydrostatic test (M) 12/1 to 12/20 MLV to Anomaly remediation 10/24 to 11/18

Anomaly remediation MLV to /28 to 12/2 MLV to /4 to 11/18 MLV to /28 to 12/5 MLV to /15 to 11/18 MLV 40-2 to 47-2 Pipeline Outage 4/14 to 11/1 (est) MLV 80-1 to 82-1 Anomaly remediation 10/17 to 11/8 MLV to Pipe replacement 10/22 to 11/4 MLV 200-4B to Valve replacements 10/24 to 12/2

MLV 260A-100 (Northampton) Cleaning Pig 11/8 to 11/9 Station 319 Emissions Testing 11/28 to 12/2 Line 217A (Pittsburg Spur) Cleaning and ILI pigging 12/1 Station 315 Crane Install 11/8/ to11/10 Pipeline Outage MLV to /1 to 11/1 (est) MLV to /1 to 11/1 (est) MLV and Concord Lateral Emergent anomaly 9/13-11/1

12 MLV 314 Meters in the MLV to valve section: ELLIOTT DEHY: RIP EVANCHICK DEHY: RIP 318C WYALUSING SALES Station 315 Station 317 Station 325 Station 313 MLV 316 MLV 318 MLV 320 MLV 324 MLV 322 Meters in the MLV to valve section: HOP BOTTOM DEHYD: RIP 320C AUBURN DEHYDRATION: RIP LOTT DEHYDRATION: RIP 320D 101.1A TEEL DEHYDRATION: RIP 320H 101.1A STRICKLAND HILL DEHY: RIP 320K SPRINGVILLE DEHY: RIP 320I DIMOCK DEHY: RIP 320J KORBAN DEHY:RIP 320E Meters in the MLV to valve section: HONESDALE PENNSYLVANIA SALES Station 319 Station 321 Station 323 Reduced operating pressures by 20% MLV to 319-1, to 321-1, and to Anomaly remediations (M) 10/18 to 10/28 Station 315 Station 323 Station 325 Station 313

13 Station 40 MLV 707 MLV 706 MLV 705 MLV 704 MLV 703 MLV 702 MLV 701 MLV PANOLA TRANSPORT CARTHAGE TRANSPORT CARTHAGE GAS UNIT 13 (Bi CARTHAGE GAS UNIT 13 (Bi ) EAST TEXAS PLANT DEHYDRATION ENTEX PANOLA TRANSPORT (CI) BELLE BOWER DEHYDRATION STATE LINE PROCESSING: RIP 704F LOGANSPORT B: RIP 704H 101.1A BURFORD GATHERING: RIP 704 E BETHANY LONGSTREET FIELD GRAND CANE LOGANSPORT SPIDER DEHYDRATION DE SOTO GATHERING DESOTO HOLLY FIELD BENSON AND CONVERSE BLACKSTONE NO 1: RIP 703K NABORTON DEHYD D N BELL 1 (CI) TRENTON SALES: RIP 703H HARRIS 19.1: RIP 703G MARTIN TIMBER (CO) WEST MANSFIELD PLEASANT HILL TRANSPORT (CI) BLACKSTONE IVORY: RIP 702M BRUSHY BAYOU FIELD GROGAN FIELD (CI) CHEMARD LAKE DEHYDRATION GROGAN FIELD (CI) SAN MIGUEL CREEK FIELD (CI) GROGAN DEHYDRATION TRANSPORT (CI) Pipe replacement in Station 40 yard. 11/1-11/3 Impact: Carthage Lateral shut in at Station 40. -Physical flow into the Carthage Lateral must match physical flow out of the Carthage Lateral. -All receipt meters between MLV 707 (end of lateral) and MLV 700at Station 40 would have to shut in or schedule flow to Enterprise meter Station 703

Questions?

Suggestions for improvements to this meeting Are the meetings beneficial? Is additional information needed? Questions after the meeting? Other? to one of the following: Your scheduler PASSKEY Portal