Chapter 9 Resource Allocation

Slides:



Advertisements
Similar presentations
Project Management A Managerial Approach
Advertisements

Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall10-1.
Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 © 2007 Pearson Education.
CP Chapter 4 Schedule Planning.
Chapter 17 Project Management McGraw-Hill/Irwin
Chapter 6 Time Planning & Networks
Finding the Critical Path
Project Scheduling: Lagging, Crashing, and Activity Networks
Project Scheduling: Lagging, Crashing and Activity Networks
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
CPM, Crashing, Resource Leveling using MS Excel & MS Project
MGMT 483 – Week 11.  The issues involved in developing a project plan and schedule in the face of constrained resources (people or facilities)  Critical.
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
Advanced Project Management - CPH
pert and cpm ch 9 Learning objectives:
Stochastic Modeling & Simulation Lecture 6: Intro to Project Management – CPM.
Project Scheduling: Networks, Duration estimation, and Critical Path.
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
9-1 Resource Allocation Some definitions Resource allocation, loading, leveling Expediting and crashing projects Goldratt’s “Critical Chain”
Importance of Project Schedules
Project Management Techniques.
Project Management: A Managerial Approach
Project Management in Practice Fourth Edition
Allocating Resources to the Project
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
MANAGING PROJECT RESOURCES
Operations Management Project Management
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Allocating Resources to the Project
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 9 – Resource Allocation.
MANAGING PROJECT RESOURCES
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
11/02/09 Chapter 7-Project Planning 1 Elements of Project Planning  Divide project into tasks, tasks into subtasks, subtasks into...  Estimate duration.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Chapter 16 – Project Management
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management Operations -- Prof. Juran.
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
Project Planning & Scheduling
P.I.I.M.T American University of Leadership
deterministic Fixed and known in advance, representing a
Class 27: Project Management Part II
Project Planning & Scheduling
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
PROJECT MANAGEMENT WITH CPM/PERT.
ENGINEERING MANAGEMENT (GE 404)
Chapter 3 Project Management.
Project Scheduling: Lagging, Crashing and Activity Networks
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
ELC 347 project management
AOA A style of project network diagram in which arrows
Importance of Project Schedules
Presentation transcript:

Chapter 9 Resource Allocation

Chapter 9 Resource Allocation Introduction This chapter addresses: Trade-offs involved to crash cost Relationship between resource loading and leveling Some approaches used to solve allocation problem Chapter 9 Resource Allocation

Critical Path Method – Crashing a Project One important difference between CPM & PERT: CPM included a way of relating the project schedule to the level of physical resources trade time for cost, or vice versa Can specify 2 activity times and 2 costs 1st time/cost combination- called normal 2nd combination called crash Normal – usual ‘average’ time, resources Crash – expedite by applying additional resources Chapter 9 Resource Allocation

Critical Path Method – Crashing a Project Allocation problem requires more careful consideration-additional resources? Many things make crashing a way of life on some projects (i.e last minutes changes in client specification, without permission to extend the project deadline by an appropriate increment) Careful planning is critical when crashing project – need to consider feasibility of expediting work (e.g equipment availability) Chapter 9 Resource Allocation

Critical Path Method – Crashing a Project Slope = crash cost – normal cost crash time – normal time Where: slope = cost per day of crashing a project When slope is negative : indicate the time required for a project is decreased, the cost is increased Chapter 9 Resource Allocation

Chapter 9 Resource Allocation The dollars per day slope of activities is relevant only if the whole crash increment is useful Crashing may involve a relatively simple decision to increase groups of resources (labor-shovel, Ditch-Witch Technology) If do changes in technology tend to produce discontinuities in outcomes and also in cost. Chapter 9 Resource Allocation

Principles to crash a project Focus on the critical path when trying to shorten the duration [resource ready] Select the least expensive way to do it Chapter 9 Resource Allocation

Crashing a Project (E.g Two-Time CPM) Activity Precedence Duration, Days (normal,crash) Cost, $ (normal,crash) Slope ($/day) a - 3,2 40, 80 40/-1 = -40 b 2,1 20, 80 60/-1 = -60 c 2,2 20, 20 Cannot be expedited d* 4,1 30, 120 90/-3 = -30 e** 3,1 10, 80 -70 (2 days) *Partial crashing allowed **Partial crashing not allowed Chapter 9 Resource Allocation

Chapter 9 Resource Allocation A CPM Example 1 2 3 4 5 6 7 8 a c b d e Normal Schedule, 8 days, $120 Chapter 9 Resource Allocation

Chapter 9 Resource Allocation 1 2 3 4 5 6 7 8 a c b d e 1 2 3 4 5 6 7 8 a c b d e 7-day schedule, $160 6-day schedule. $220 1 2 3 4 5 6 7 8 a c b d e 1 2 3 4 5 6 7 8 a c b d e 5-day schedule, $260 4-day schedule, $350 Chapter 9 Resource Allocation

Chapter 9 Resource Allocation Network critical path is a-b-e, project duration is 8 days, normal total cost is $120 The decision about which activities to crash depends on how much to reduce the duration On the benefit side, some projects have penalty clauses that make the parent organization liable for late delivery- sometimes bonuses for early delivery Chapter 9 Resource Allocation

Chapter 9 Resource Allocation On the cost side, figure below shows the time/cost relationship of crashing the project All crash a + b + 2d + 2e a + d + 2e - b a + b a All normal Chapter 9 Resource Allocation

Chapter 9 Resource Allocation Fast Tracking Another way to expedite a project Term used for construction projects Refers to overlapping design and build phases Design completed before construction starts,so overlapping will result shortening the project duration Build before design completed-more design changes Loss productivity, increased cost, loss time Chapter 9 Resource Allocation

Chapter 9 Resource Allocation Fast Tracking (cont.) Studies revealed that: more design changes in fast tracking – the number of project change orders not significantly different than not fast-tracked project Dependent on effective feed-back and feed-forward communication Chapter 9 Resource Allocation

Chapter 9 Resource Allocation SOLVED PROBLEM Activity Crash Time, Cost Normal Time, Partial crashing a 3,$60 No b 6,80 7,30 Yes c 2,90 5,50 d 6,30 e 2,100 4,40 1 2 3 4 a b e c d Find the lowest cost to complete the project in 10 days Chapter 9 Resource Allocation

Chapter 9 Resource Allocation Answer Current time and cost: 12 days and $210 Since the critical path is a-c-e, we only initially need consider these 3 activities: a: cannot be crashed c: can cut 3 days at an extra cost of $40 but only results in project completion by day 11, due to b. To reach 10 days, cut b by 1 day, total extra cost $90 e: can cut e by 2 days for an extra cost of $60 and results in project completion by day 10. Thus, cut e 2 days at a cost of $60. 3 1 2 4 a b e c d 7 5 6 8 12 Chapter 9 Resource Allocation

RESOURCE ALLOCATION PROBLEM A fundamental measure of the PM’s success in project mgmt is the skill with which the trade-offs among performance, time and cost are managed The extreme points of the relationship between time use and resource are: Time limited Resource limited Chapter 9 Resource Allocation

Chapter 9 Resource Allocation RESOURCE LOADING The amount of individuals resources an existing schedule requires during specific time periods Resource loading can be illustrated by: Resource usage calendar Modified PERT/CPM AOA diagram (similar with Gantt Chart) PM responsibility: Demand for resources does not exceed resource capacities Ensure that the required resources, in the required amounts Chapter 9 Resource Allocation

Resource Usage Calendar Chapter 9 Resource Allocation

Modified PERT/CPM AOA Diagram (Refer Ch 08 Slide 26) 5 10 15 20 25 30 35 40 45 4 1 2 3 6 7 a (4,0) b (2,1) c (3,1) dummy h (0,2) d j (0,6) e f (1,1) i (6,3) g (1,0) Chapter 9 Resource Allocation

Chapter 9 Resource Allocation RESOURCE LEVELING Aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances Purpose to create a smoother distribution of resource usage Advantages; Much less hands on management Be able to use ‘just in time’ inventory policy with right quantity delivered If the resource being leveled is people, it improves morale and results in fewer problems in the personnel and payroll offices Chapter 9 Resource Allocation

Chapter 9 Resource Allocation E.g: Network 2 a, 2 [2] 1 c, 5 4 [4] b, 3 [2] 3 The activity time is shown above the arc, and resource usage (one resource, workers) is in brackets below the arc. Chapter 9 Resource Allocation

Before Resource Leveling 1 2 3 4 5 10 8 6 b c a 1 2 3 4 5 c b a Days Activity Workers Days Chapter 9 Resource Allocation

After Resource Leveling 10 1 2 3 4 5 c b a Days Activity 8 Workers 6 a b 4 c 2 1 2 3 4 5 Days Chapter 9 Resource Allocation

RESOURCE LOADING/LEVELING AND UNCERTAINTY If happens excess capacity,the alternative that we can consider: Try to level the demand, moving some of it forward and some backward Try to alter the supply of working hours-trade off time between periods of over capacity and periods of under capacity Might expend additional resources-contract worker for overload period, subcontract the workload Which cheaper?Delay or subcontract? Chapter 9 Resource Allocation