Date: 21.08.2014, Page 1 Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-Sendstad POSC Caesar Association (PCA)

Slides:



Advertisements
Similar presentations
1 EFSA policy on Declarations of Interests Management Board Meeting, September 2007 Bucharest.
Advertisements

Management System Owner Briefing for Terry Tyborowski (acting EM-60)
Briefing for New Functional Area Owners
Managing Compliance Related to Human Subjects Research Review Joseph Sherwin, Ph.D. Office of Regulatory Affairs University of Pennsylvania Fourth Annual.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
RECORD KEEPING Cooperative Development of Operational
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
Rue du Rhône CH-1204 Geneva - T: F: Safety of Electronic Equipment Safeguards to reduce.
EASA and the EU Regulatory Framework
Permit to Fly: the new rules
Standardization in China
Peter Corbeel Rulemaking Directorate Initial Airworthiness Manager
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
PRESENTATION TO CEN/TC 319 VENICE - APRIL 13, 2005
Plant Engineering Life Cycle Conference 2005; 11 April Dalip Sud The Application of ISO Part 4.
Software change management
AS9102 First Article Inspection Report
ISO ESP Systems Task Group Leader, Shauna Noonan
Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
Reference Data Product Life Cycle Support (PLCS) Nils Sandsmark DNV 3 September 2004.
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
Visual 8.1 Course Summary Unit 8: Course Summary.
OVERVIEW OF Ian Glendinning Target Training Room Target Plaza South 1000 Nicollet Mall Minneapolis, MN September 20-21, 2007 ISO Training -
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
Miles Shepherd Chairman ISO Technical Committee 258.
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
1 Presented by Name Date. 2 Mission To enhance the global competitiveness of U.S. business and the American quality of life by promoting and facilitating.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
FIATECH FIATECH ADI Programmers Circle 2006 Onno Paap, Fluor Corporation.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
PCA and ISO are true! Welcome! Thore Langeland, Ph. D. Chairman of PCA Americas PCA Forum and Member Meeting Hosted by Bechtel, Houston.
Integrated Information Platform for reservoir and subsea production systems Stavanger April 6th 2005.
United Nations Procurement Division
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1The ISO Concept database Reinhard Weissinger 16 August International Organization for Standardization.
CAESAR Systems Limited
ISO/TC 211 Workshop on registry Reston, Sept 2000 This workshop will focus on the requirements for registries and related mechanisms within the scope of.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Atlanta Area OAUG Meeting January 18, 2008 Using Oracle eAM to Support Asset Reliability.
Regulatory Issues in Laboratory Management
WG3 Presentation to TC184/SC 4 Closing Plenary Baltimore, USA 23 Oct 2015 WG3 Oil, Gas, Process and Power Paul van Exel, Convener Nils Sandsmark, Deputy.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
ASME C&S Training Module B8 MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity.
Kuwait Oil Company Commercial Support Group Supplier Relationship Management Team PRE-QUALIFICATION OF CONTRACTORS AND MANUFACTURERS 2016.
IRINGTools Exemplo de aplicação para Web Sêmantica.
Page © ASME 2016 Module B – Process B8a. US TAG to International Standards Organization (ISO) Standards Development Standards and Certification Training.
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by David Q. McDowell Chair, USTAG ISO TC130 USTAGs and Joint Working Groups.
The ISO system and ISO UM Welcomes ANSI CMF May 11.
Cryogenic safety organisation at CERN
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Overview of U.S. Participation in ISO and IEC
Clinical Engineering Lecture (3).
Standards and Certification Training
Proposed IHO Work Programme for 2018
ISO Brief Overview 17 September 2008 Magne Valen-Sendstad.
ANSI REFRESHER COURSE 2018 CHANGES TO THE ISO DIRECTIVES
Developing Standards and Linkage to IECEx
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Elements of an Electronics NTBs Initiative
Presentation transcript:

Date: , Page 1 Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-Sendstad POSC Caesar Association (PCA)

Date: , Page 2 ISO Data Model and Reference Data Library RDL Common Terminology Core Classes Standard Classes Proprietary Classes Standardised in ISO Product Catalogues represented using ISO Standardised in ISO Physical Object, Activity, Property Classes Standardised by e.g. ISO /IEC/ ANSI/ BS/DIN, represented using ISO Data Model Part 4 +(Part 3) (SC4 RDDB scope) + Part 5 and 6 for the process

Date: , Page 3 ISO Initial Set (Subject to Maintenance) l ISO-TS ACTIVITY PROPOSED SET l ISO-TS BASICS PROPOSED SET l ISO-TS CLASS OF CLASS PROPOSED SET l ISO-TS CONNECTION MATERIAL PROPOSED SET l ISO-TS CONTROL FUNCTION PROPOSED SET l ISO-TS ELECTRICAL PROPOSED SET l ISO-TS ENCODED INFORMATION PROPOSED SET l ISO-TS HEAT TRANSFER PROPOSED SET l ISO-TS INFORMATION PROPOSED SET l ISO-TS INSTRUMENT PROPOSED SET l ISO-TS PIPING PROPOSED SET l ISO-TS PROPERTY PROPOSED SET l ISO-TS PROTECTION PROPOSED SET l ISO-TS ROTATING EQUIPMENT PROPOSED SET l ISO-TS SOLID HANDLING PROPOSED SET l ISO-TS STATIC EQUIPMENT PROPOSED SET l ISO-TS TRANSPORT PROPOSED SET l ISO-TS UOM PROPOSED SET l ISO-TS VALVES PROPOSED SET PCA will form SIG’s to at a minimum cover this scope

Date: , Page 4 The ISO Position

ISO TC184/SC4/WG3 Ibusuki N The Maintenance and the Validation Teams Maintenance Team –A group of experts that may be set up by a parent committee following the rules in the ISO/IEC Directives for the establishment of Working Groups –A MT may be called upon by the TC/SC secretary to provide expertise in the preparation of change requests or items for evaluation or validation Validation Team –A permanent, “executive”, group of individuals appointed by and acting as delegates on behalf of their National Bodies Seems to meet SC4 needs –Single Maintenance Team –Multiple sector-specific Validation Teams PCA Staff PCA SIG

Date: , Page 6 The PCA SIG’s

Date: , Page 7 Staff SIG Subsea Equipment Board of Directors General Manager Technical Advisory Board (TAB) SIG Drilling & Completion SIG Reservoir & Production SIG Development & Modification SIG Operation & Maintenance SIG Health, Safety & Environment *)*) * ) SIG – Special Interest Group Technical Advisory Board and SIG’s O&G Production Facilities & Process Plants

Date: , Page 8 Proposed Initial SIG’s l Basic RDL l Electrical l Instrumentation l Rotating Equipment l Static Equipment l Heat Transfer l Piping & Valves Properties should be dealt with within the respective SIG’s Activities the same way. Will probably not be top priority.

Date: , Page 9 SC4 Normal process for the maintenance of existing standards as databases WIP

Date: , Page 10 PCA Process for the Development of PCA RDL and submissions of propsals to ISO Proposal to SC4 RDDB or PCA approved PCA will develop a set of procedures to mirror this process and corresponding status codes

Date: , Page A B C

Date: , Page 12 Consequences l PCA RDS/WIP is the tool for both PCA RDL and SC4 RDDB vThe PCA RDL will in principle cover the whole triangle vOnly the ‘Core’ RDL level is within the scope of the SC4 RDDB under the current regime vMay be extended to cover the ‘Standard’ level? Must be covered! vObjects may be accepted in the PCA RDL, but be rejected by or be out of scope for the SC4 RDDB vReferences to external names and identifiers are expected to be a central part of the PCA RDL (Ref. AEX, BIM etc.) vOutside scope for the SC4 RDDB vWe will therefore have to have separate regimes, incl. status codes for the PCA RDL and the SC4 RDDB l Levels of procedures vSC4 will prepare procedures and status codes based on the ISO/IEC Directives, ISO Supplement Annex ST, Procedure for the development and maintenance of standards in database format (STD_DBs N52 (Rev.1)) vThe PCA Procedure and Status codes will mirror the SC4 Procedures vLevels of Procedures: ISO/IEC-> ISO SC4 -> PCA.

Date: , Page 13

Date: , Page 14 ISO l ISO Integration of life-cycle data for process plants including oil and gas production facilities vISO Overview and fundamental principles (Approved IS) vISO Data model (Approved IS) vISO Geometry. (Approved TS) vISO Initial reference data. (Approved TS) (Included in the RDS) vISO Procedures for registration and maintenance of reference data (NWI/CD pending resolution on MA) vISO Scope and methodology for developing additional reference data (NWI/CD to be submitted to ISO Q3 2007) vISO Implementation methods for the integration of distributed systems (TS submitted to ISO Q3 2007)