Modeling Cold Load Pickup Eric Jung. Agenda Traditional methods of analysis Un-diversified load allocation Emergency capacity determinations Voltage drop.

Slides:



Advertisements
Similar presentations
Circle Theorems Bingo!. Use any 9 of these numbers 105 o 240 o 55 o 14 o 65 o 50 o 90 o 45 o 60 o 40 o 110 o 155 o 15 o 74 o 120 o 12 o.
Advertisements

TATUNG CO. Electricity Meter Business Unit
Control Circuit Protection Supplementary Protectors vs
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Motor Installation By Bill Lee Article 430. NF 15HP NF 25HP NF 30HP NF 50HP NF 75HP D.E.T.D. Fuse Feeder O.C. Feeder Conductors N.T.D IV. Time D.E.T.D.
Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
S T A N D A R D S AS/NZS :1994 Specifications for rainwater goods, accessories and fasteners Part 1: Metal shape or sheet rainwater.
The Physics of Hybrid Vehicles. J. Russell Lemon
Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines.
Using AMI to Improve the Operation of the Electric Distribution System
Network and System Design
Matching and comparing coins and bills
Addition and subtraction on a number line links between the model and appropriate ‘vertical’ method Janine Blinko.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Distributed Intelligence Provides Self-Healing for the Grid
MOLDED CASE CIRCUIT BREAKER BASICS
Working with AMI Data Eric Jung SouthEastern Illinois Electric Cooperative.
RT3b – André Smit, Siemens USA
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Power System Protection
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
Content Types of circuit breakers Operating principles of circuit breakers Inverse time/current characteristic of circuit breakers Circuit breakers.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
SECTION 4 ELECTRIC MOTORS UNIT 19 MOTOR CONTROLS.
Chapter 7 SYSTEM PROTECTION
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Lesson 9: Electrical Components
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Electrical Installation 2
POWER SYSTEM PROTECTION
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Advanced Coordination Topics – EasyPower w/ Power Protector
Announcements Read Chapters 10 and 11
Suggestion on How to Use
Suggestion on How to Use
1 © 2015 Eaton. All Rights Reserved.. Suggestion on How to Use Industry Trainers are encouraged to use this material in their sessions Download the presentation.
ECE 498HZ: Power Distribution System Analysis
Describing Arc Flash Incident Energy per Feeder Length in the Presence of Distributed Resources Tom R. Chambers, P.E. Power System Engineering, Inc. Madison,
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Protection of Power Systems
Part Three – Relay Input Sources
Announcements Please read Chapters 9, 10 and 11 HW 8 quiz today
Motor Protection Dr. Hendro Rijanto.
Announcements Design Project has firm due date of Dec 4.
Protection of Power Systems
Introduction to Global AC Power
Advanced Fuse-Saving Techniques
Smitty’s Two Minute Drill Overcurrent Protection
ECE 476 POWER SYSTEM ANALYSIS
IPS-SLR™ Static Line Rating Module and ElectraNet Use Case IPS-ENERGY™
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Chapter 7 System Protection
Ampacity Calculations and Overcurrent Protection 1
Local Area Planning Update – TRANSAC
Engineering Project Cable Management.
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Power Plants By: Stephanie Mercer.
ELECTRICAL POWER-II Electrical engineering sixth semester
Calculations: Transformers and Service Conductor Calculations
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
Objectives Learn about 3 Phase vs. 1 phase F&N vs. 1 phase F&F
Calculations Review Drill
Presentation transcript:

Modeling Cold Load Pickup Eric Jung

Agenda Traditional methods of analysis Un-diversified load allocation Emergency capacity determinations Voltage drop analysis Examples

What is Cold Load Pickup? Cold load pickup is a loss of diversity following an extended outage. Cold refers to the state of the load, not the ambient temperature. Problems stem from thermostatically controlled loads.

2008 Ice Storm

2009 Ice Storm

Inland Hurricane…or Derecho? SouthEasterns Service Territory

Rule of thumb Methods & Shortcomings Assume 200%-300% of full load current –Only a 100% swing…Is that all? Fails to take nature of load into account Traditional methods require: –Normal peak data –Many assumptions

Requirements for modeling Billing file with 15-minute interval data –With AMR data, this is no problem. –Without AMR data, this must be calculated. Knowledge of operational characteristics of C&I customers –How will load ramp up after an outage? –What load will pick up immediately?

Un-diversified load allocation 1.Set sources to swing. 2.Set all load groups to diversity fixed. 3.CF % for residential should be 95%-100%. 4.C&I groups are variable. 5.Apply and Run

Emergency system capacity The following capacities must be determined: –Short time overload capacity of substation transformer –Emergency conductor capacity –Overcurrent device capacity Emergency voltage standards must be established.

Emergency capacity of sub transformer FA 65˚C rating is 25%-40% above base Short time overload of < 30 min –50% pre-outage loading = 168% overload –70% pre-outage loading = 158% overload –90% pre-outage loading = 145% overload Combined yield: –181%-235% over base 55˚C rating

Determine capacity of conductor Emergency ampacity of overhead conductor: Emergency ampacity using 100˚C conductor temperature (no change in ambient) 25 C˚ Ambient 40 C˚ Ambient

Determine capacity of conductor example Emergency ampacity of 4/0 ACSR in 0˚C (32˚F) ambient Emergency ampacity of #2 ACSR in 38˚C (100˚F) ambient

Determine capacity of system protection Electronic Reclosers –Minimum phase trip setting –Ground trip must account for downstream single phase devices. –Windmill will base capacity on lowest Min Trip. Hydraulic Recloser –Cooper reclosers reference R –Limit to 150% of series coil rating

Voltage drop setup: capacity Set capacity colors to match emergency capacities. Could use Color by Custom. –Allows further breakdown to fuse, OCR… –Allows multiple colors based on % over capacity

Voltage drop setup: voltage ANSI C Range B standard –91.7%-105.8% nominal When is Range B tolerable? –Short term emergency conditions –Should be corrected as soon as possible to Range A

Dixon Springs before Normal peak current 68A

Dixon Springs updated Three phase project

Carter south feed

Elizabethtown before Closing this sectionalizer Would open this recloser

Elizabethtown updated

Principle Lessons Learned System protection –Should be based on: Capacity Fault current Cold load pickup Coordination –Should not be based on: Load current Some arbitrary minimum fault impedance The way weve always done it.

Contact info Eric Jung Engineering Manager SouthEastern IL Electric Co-op