Construction Surveys 1 1 1 1 1.

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Final Exam Review 1 1.
(GET FAMILIAR WITH EQUIPMENT)
Basic Setting Out.
Furnishing 1-Point Perspective Drawings
Determination of heights – essential terms 1. Equipotential surface = a surface with the invariable gravity potential (perpendicular to the force of gravity.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Distance Measuring.
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Using the Underground Traverse Calculator. Team #1 Begins a Traverse Luke Skywalker and Sandra Bullock begin an underground traverse as Team #1 There.
Layout a Project. OVERVIEW Familiarize you with techniques and procedures in staking / laying out a project using an Trimble S6 and R8 GPS – Controlled.
Chapter 13 Site Plan Layout.
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
CE 260 SURVEYING CHAPTER 5.
CS 128/ES Lecture 10a1 Surveying. CS 128/ES Lecture 10a2 Data for a GIS Raster data - characteristics? - sources? Vector data - characteristics?
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
1Rugby 55 Presentation – January 2007 The Rugby 55 User Presentation.
S.H.H.S Building Construction
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Dr. Dan Trent Mississippi Valley State University January 28, 2013.
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Introduction to surveying
Graphic Language of Buildings Architectural Plans.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
S.H.H.S Building Construction
CONSTRUCTING A FIVE CABIN LATRINE
Principles of Surveying
Surveying I. Lecture 13. Tacheometry.
Constructing Homes and Other Buildings
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Roadway Conference 13 April, 2010.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
MODERN SURVEY (FAMILARISATION WITH EQUIPMENTS). Modern equipments EDM – Electronic distance measurement eqp. EDM – Electronic distance measurement eqp.
How to Calculate a Traverse with the Traverse Calculator
Chapter 6 - Intro to Leveling Horizontal and Level Surfaces Datums Levels Level Rods Setting up the Level.
Chapter (5) Leveling Introduction:
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 5 Measuring Distance and Elevation.
 PREPARED BY: 1.Sindha.Rinku.R 2.Trivedi.Hasti 3.Kamdar.Karan  GUIDANCE BY : ASHISH RATHOD (ASST.PROF.) Modern tools of Surveying & Mapping.
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Lesson Applying Differential Leveling Techniques.
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
One Point Perspective: City Drawing A Tutorial Art 1: Fall 2011 MMRoberts.
Topic : Theodolite Traversing
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Copyright © 2009 Pearson Addison-Wesley Trigonometric Functions.
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Version of document: 2.02 Software CBox: v3 User Manual Application Examples Language: English.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Mr. Vedprakash Maralapalle, Asst. Professor
Chapter (5) Leveling Introduction:
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
Visit for more Learning Resources
Detail Surveys, Tacheometry, Total Stations
Plane table surveying with contouring
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Rectangular Coordinates Level control in trenches
Total Station Surveying
Surveying Equipment.
5 Trigonometric Functions Copyright © 2009 Pearson Addison-Wesley.
Modern Surveying Instruments
Leveling By : Parveen Kumar.
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Surveying I. Lecture 13. Tacheometry.
Revise No. 1.
Surveying With Construction Applications, 7th Edition
Stream Crossing Bootcamp
Presentation transcript:

Construction Surveys 1 1 1 1 1

List of Figures Readings: Chapter 23 Figures used: Material to be considered: 23-7.

Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out and positioning works. 60% of surveying hours. involves establishing lines and grades by means of stakes and string lines to guide the contractor During and after construction: as built drawings, a record and a check. Measurements involved: Horizontal and vertical angles, elevations, horizontal distances. 2 2 2 3 5

CS Equipment Laser Instruments: to create a visible line, or plane of known elevation or tilt The line or plane could be horizontal, vertical, or tilted. Single beam lasers will project visible string lines or plumb lines Rotating beam lasers: a rotating single beam to create a plane. Examples: Laser levels, laser theodolite and total stations, hand-held EDM instruments (Figures 23-1 to 23-4) Recent technology of prism-less total stations and EDMs, and HDS “High Density Surveys”. Machine Guidance 3 3 3 4 6

Laser is used to guide the blade

HDS Surveys

Total Stations: the ones designed for CS are of lower angular resolution(10” or 20”), and shorter ranges(500 m) Relative GPS: sub-centimeter accuracy with real time kinematic GPS in horizontal, few cm in vertical. Must maintain visibility with satellites Levels

Horizontal and Vertical Control Before Construction: new control points around the site must be established with high accuracy. Additional points inside the site are then established. All points must be “tied out” for repositioning. These initial points should: Meet certain accuracy standards Be clearly marked, referenced, and recorded Be far enough to be safe during construction. During Construction: additional control is extended by the contractor as needed, around or inside the structure. These additional points should be close enough to the structure so that workers with simple equipment can use them 4 4 4 5 7

Staking out a Pipeline Sanitary (sewage) sewers and storm sewers which carry storm runoffs operate under gravity. The grade in such pipelines is critical. City water, oil, and natural gas pipes are not as critical. The location of the line is determined after a profile leveling is done. The center line and an offset reference line are established. Precise alignment and grade are guided by laser beams or battered boards. 5 5 5 6 8

Pipe Laying Laser system by Apache Source: laserlevels.net

Staking Pipeline Grades A- Cut and Fill: The center line and an offset line are marked and stationed. The actual profiling and staking are on the offset line, not the CL. Using profile leveling method, obtain ground elevation at each stake, compute the depth of cut or fill to the invert level. Mark that depth on the stake side facing the trench, mark the station on the other side of the stake. B- Line and grade: Generally done using laser equipment. 7 7 6 7 10

Staking out a Building First step is to locate the building by boundary surveying. Stakes are placed temporarily at the corners as a check. In a small size building, a set of batter boards and reference stakes are first set. The boards are around the building corners and nailed at a full number of feet above the footing base or at first floor elevation. Nails are driven into the batter board tops so that a string connecting them will define an outside wall See fig 23-7, and the example which illustrates staking out the building in fig 23-8. In a larger building, radial methods, the one you used to lay out piles, are used used. Fig 23-9 8 8 7 8 11

Additional Control for Buildings Elevations: Visible benchmark(s) should be set. Additional control could be done using marks on nearby buildings, or marks on interior structure elements (columns, walls). Horizontal: temporary batter boards inside the site, marks on nearby buildings. Plumbness: Essential for multistory buildings: columns, elevator shafts, construction walls, etc. Checked by a theodolite line of sight rotating in a vertical plane, or by lasers. Two instruments, with perpendicular line of sights, could be used to guide the construction of vertical members in real time. 9 12 9 8

CS Using Total Stations We are simply trying to define (X,Y) and maybe (Z) of the center of the TS. Once stored in memory, the TS can do further computations onsite. Horizontal Orientation: By azimuth: input occupied point coordinates and azimuth to another point. By coordinates: input occupied point coordinates and another point coordinates By resection: input coordinates of unoccupied points , at least three, output is occupied point coordinates. Vertical Orientation: if necessary, output is HI: By adding the instrument height to occupied point elevation. By adding the vertical distance to a benchmark elevation and prism height: HI = elevB + hp - V 10 13 10 9

Staking out with a Total Station First the instrument is oriented, and a file that contains control points and stake points information is downloaded into the total station. For 2-D stakeout, the number of the desired stake point is entered, the instrument will display differences of angles and distances to orient the prism. For 3-D works, The difference in elevation between the stake elevation and the required elevation (cut or fill) is also displayed. 11 14 11 10