Development and validation of RasChain alignment systems for the pre-alignment of CLIC Niels van Bakel, Bram Bouwens,Harry van der Graaf, Henk Groenstege,

Slides:



Advertisements
Similar presentations
Biobank of Wallonia Biobank of Wallonia: Co-operation between researchers & commercial companies: dream or reality? 18 June 2010 Philippe Van der Hofstadt.
Advertisements

First operation of GridPix in double phase Liquid Argon Patrick Decowski Gijs Hemink Mattheo Alfonsi Rolf Schon Niels van Bakel Maarten van Dijk Harry.
How to make a VM Clone VMWare 9.0 4/28/2013. With the VM of the machine you want to clone powered off, Select the VM, then right click, and select “Manage”,
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
TPC meeting, GSI, 2-3 June 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, GSI, 2-3 June 2003 Børge Svane Nielsen, Jørn Westergaard Niels.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Solomon William KAMUGASA
Detector R&D Jan Timmermans Programme: ≥ 2003
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege,
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Lightning Detector Michael Bloem December 5, 2002 Engr 311.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
H. SCHMICKLER Alignment challenges for a future linear collider.
Using Electricity. Q: WHAT IS A "VAN DE GRAAFF MACHINE"? A: A Van de Graaff machine is a mechanical- electric device which produces extremely high voltage.
RasClic: A long-baseline 3-point alignment system for Linear Accelerators H. Manaud Durand, J-P. Quesnel, T. Touzé CERN TS-SU, Geneva, Switzerland Harry.
The RASNIK Alignment System. Particle Physics CERN, Geneva, Swiss.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
An Integrated Single Electron Readout System for the TESLA TPC Ton Boerkamp Alessandro Fornaini Wim Gotink Harry van der Graaf Dimitri John Joop Rovekamp.
Preparing the telescope and CCD-camera for observations Andrych K, Tvardovskyi D.
Microscope Parts Quiz Multiply the lenses together to get the total magnification. A. B. C. D. E. F. G. H. I. eyepieceilluminatorstagearm fine focus coarse.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
06/01/2016 TE-SM/Haiying GuoSPAB Customer Presentation Compact pressure sensor SPAB 1.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Micromegas (Ingrid)+TimePix 8-chip modules
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
Almega. Visible Raman Microscope
17/03/01 PDR ATLAS Alignment, Olivier Cloué1 ATLAS ALIGNMENT (BARREL) : Installation at CERN (1) zEstimated dates : (Web planning) y11/2004 -> Start of.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
By Joshua Shaw.  Now that we have a program, we should see how it works in the real world  To do this we need the Cortex and the orange USB cable 
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
LED Experiment Edward Cazalas Chris Sopko 9/9/13.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
Optical performance measurements of various fibre connections
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
The reading is 7.38 mm. The reading is 7.72 mm.
Fred Hartjes 1 RD51 mini week, CERN, June 14, 2012 Implementing GridPix in a Darwin detector Matteo Alfonsi, Niels van Bakel, Patrick Decowski, Harry van.
Wire Procurement and Wire Joint Production
BM&N STS ladders assembly in VLHEP
DT-LHCb coordination meeting 18 April 2016
Light Emitting Diode: LED
on behalf of the CLIC active pre-alignment team
BSS Prep work at CERN and Acceptance of Parts
nSW Alignment Installation
ALICE Offline Week, CERN
Towards a common mechanical interface
Alignment challenges for a future linear collider
Status of the PANDA Solenoid Magnet Production in BINP
Basics Semiconductors
Station and Module Support Frames
ולידציה מול כיול-השונה והדומה
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
STEEL PLATES.
Alignment NOtes.
The ATLAS Barrel Alignment Readout System
Presentation transcript:

Development and validation of RasChain alignment systems for the pre-alignment of CLIC Niels van Bakel, Bram Bouwens,Harry van der Graaf, Henk Groenstege, Joris van Heijningen, Ad de Snayer, Robert Hart, Gerrit Brouwer Nikhef CLIC Workshop CERN, Jan 29, 2013

RasChain First: Rasnik-RasDif performance studies at Nikhef

RasChain: interconnected Rasnik systems for basic CLIC units of 2010 mm

All parts received - installation June 1

6 ChainPlates including 2x RasNik 4 m 2x RasDif 4 m 3x proximity systems Proximity Rasnik Rasnik RasDif

Fine adjustment of focal length of standard Melles Griot lenses: f = 1000 mm: apply UV light LEDs, infra-red light LEDs Quite some trouble with LeLac LED/Laser power box (USB controlled) (green) semiconductor lasers: unstable (power, position?)

6 ChainPlates including 2x RasNik 4 m 2x RasDif 4 m 3x proximity systems Proximity Rasnik Rasnik RasDif

In preparation: calibration station for RasChain on (existing) steel bar (6.8 m long) 3 support plates variable mount Measurements: 3D machines, RasNiks, streched wire