Best Practices: Operations in a Fabless Startup

Slides:



Advertisements
Similar presentations
Tales from the Lab: Experiences and Methodology Demand Technology User Group December 5, 2005 Ellen Friedman SRM Associates, Ltd.
Advertisements

18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
Make vs Buy Decision D0394 Perancangan Sistem Manufaktur Pertemuan IX - X.
James T. Heires Consulting1 Software Portfolio Management Eastern Iowa PMI Chapter Program March, 2002 James T. Heires
©2004 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
An International Technology Roadmap for Semiconductors
Introduction Progression of Warehousing Decisions Why Use Warehouses?
Financial Management F OR A S MALL B USINESS. FINANCIAL MANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Supply Chain Management
Turnkey IC and Device Packaging Package Science Services LLC Package design, characterization, simulation, modeling, measurements and analysis.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
OH 2-1 Agenda Sign in for all classes to earn credit for class Sign up for Presentations A test final test question will come from each of the group presentations.
1 Chapter 3 Organizing The Purchasing Function IDIS 424 Spring 2004.
Chapter 41 Chapter 10 Strategic Cost Management. 2 Definition Strategic Cost Management: Supply chain partners working together to identify design changes,
Supply Chain Management
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
Management Information Systems, 4 th Edition 1 Chapter 16 Alternative Avenues for Systems Acquisitions.
© 2007 Pearson Education O perations as a C ompetitive W eapon Chapter 1 YearExpected Demand Cash Flow 080,000($150,000) 190,000$90, ,000$150,000.
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Purchasing.
Concepts in Enterprise Resource Planning 2 nd Edition Chapter 1 Business Functions, Processes, and Data Requirements.
Managing Procurement and Sourcing Getting What You Need.
Power Series: Fulfillment Strategies Dan Kremers 4 Walls Solutions.
The Purchasing Function
Marketing Operations Financials Instructions Delete this slide and the next one from your final presentation. Delete instructions & blue type from the.
BEST PRACTICES IN THE SEARCH & SELECTION OF A 3PL PARTNER OPERATIONS SUMMIT 2013 Presenters: Rick Hall – VP, Client Success, FIFTH GEAR Matt Konkle – President,
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Quality in Manufacturing and Service Systems
Toshiba Understanding Costs of Chip Design and Manufacture Peter Hsu, Ph.D. Chief Architect Microprocessor Development Toshiba America Electronics Components,
Introduction to Computer Engineering ECE/CS 252, Fall 2007 Prof. Mikko Lipasti Department of Electrical and Computer Engineering University of Wisconsin.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Value Analysis/ Flow Analysis
From Research Prototype to Production
June 20, 2012 Outsourcing Physical Plant Should I ???
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Inventory/Purchasing Questions
Industry SDLCs and Business Climate. Justin Kalicharan Credentials Director and Senior Technology Officer Over 14 years of coding experience in various.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Setting Your Fees Project Cost and Setting Your Fees.
Creating and Starting the Venture
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
ADTRAN: The Network Access Company. 2 Telecommunications u Multi-billion dollar industry u Voice and digital data transmission u Carrier and End User.
Customer-Supplier Division Supplier Selection & Qualification A Podcast presentation for members of the Customer-Supplier Division and ASQ Presented by.
CHAPTER 4: Procurement.
Inventory Decisions. What are Inventories? Stockpiles of raw materials, supplies, components, work in process, and finished goods. Appear at numerous.
Enterprise-Wide Resource Planning Enterprise Resource Planning (ERP) programs are software used by companies to manage information in every area of the.
Southwold Enterprises Co.,Ltd. An outsourcing partner committed to your company.
J.Kulp. 3/06 Why Outsource? A summary discussion of why companies decide to outsource. Simply stated, the decision to outsource is made to positively effect.
Business Functions, Processes, and Data Requirements
Concepts in Enterprise Resource Planning Fourth Edition
Resiliency Track Readout August Objective and Scope Objective: –To share best practices in supply chain resiliency Track Scope: Product, Supplier.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
Service excellence for customers world-wide The Cost Of Test: A Perspective from a Test Service Provider SETNET User Group 21 February,
Proprietary + Confidential1 Tech Review Guideline Please arrive at your Tech Review ready to present and discuss all of the following information. The.
Careers in Distribution, Copyright 2005, WERC Careers in Distribution Management Jobs.
Cloud solutions for growing entrepreneurial companies EXACT SOFTWARE.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 4 Supply Processes and Technology.
PitchTECH Rocket Pitch Template The following slides are a guide to help you with the presentation of your innovative technology idea. Feel free to incorporate.
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
Global Sourcing Strategies to Achieve Long-Term Success
Global E-Business: How Businesses Use Information Systems
PitchTECH Rocket Pitch Template
PitchGreen participants will be automatically entered into the
Purchasing supplies at CERN
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Managing Supplier Quality
PitchGreen participants will be automatically entered into the
Presentation transcript:

Best Practices: Operations in a Fabless Startup Gina Gloski President Semiconductor Operations Consulting

Semiconductor Operations Consulting Topics Planning for Operations Resource Requirements Fixed Operations Costs Variable Cost Factors Key Things to Remember March 2006 Semiconductor Operations Consulting

Planning For Operations First step: Establish a baseline Where is your company/product in the design cycle? Specification/MRD RTL Netlist Working prototypes March 2006 Semiconductor Operations Consulting

Planning For Operations At Specification time Baseline development and material costs Research foundry capabilities to support product performance and IP requirements Determine development and prototype cycle time and develop contingency plans Respin Redesign March 2006 Semiconductor Operations Consulting

Planning For Operations At RTL time Must have completed all items from previous slide… or you are already behind the curve! Finalize DFT strategy Evaluate internal or external test program development Choose foundry partner and begin relationship building Revise cost and cycle time assumptions March 2006 Semiconductor Operations Consulting

Planning For Operations At Netlist time All previous activities completed Select package, assembly and test/test development partners and begin managing these relationships Revise cost and cycle time assumptions Evaluate yield and WIP data management systems Define operations system requirements Develop qualification and characterization plan and partners Evaluate and set document control system Begin customization of operations forms and key procedures March 2006 Semiconductor Operations Consulting

Planning For Operations At Working Prototypes time Ensure all previous steps completed Update material costs with refined test and assembly assumptions Select yield and WIP data management methodology Execute product qualification plan Execute characterization plan Complete key operating procedures Develop or buy forecast, WIP, order management and planning process and management tools Exit strategy of public offering vs buy out factor in system selections March 2006 Semiconductor Operations Consulting

Planning For Operations Second step: Define requirements to support your end product Are you shipping a reference design or software with each chip? Are your targeted customers going to require early ISO 9000/2000 certification? Software control – you need a document control system at RTL time Need quality/manufacturing engineer to support component, PCB and supplier selection at time of RTL March 2006 Semiconductor Operations Consulting

Planning For Operations Are you utilizing alternative fab processes? RF GaAs SiGe These take longer to debug and qualify and fewer skilled people in marketplace for design Manufacturing supplier relationships and product support requirements take longer to refine March 2006 Semiconductor Operations Consulting

Planning For Operations Third step: Product portfolio breadth How many designs or new tapeouts are anticipated each year? 5+ design tapeouts per year may justify design tool expenditures and in house operations team 3-5 tapeouts – portions of operations may be outsourced to reduce cost and underutilization of resources For 1-3 design starts per year, consider outsourcing both physical design and operations Determine probability of first time working prototype Be Realistic! March 2006 Semiconductor Operations Consulting

Resource Requirements Staffing First hire: “hands on” VP/Director of Operations at RTL time Plan on 3 months for hiring process VP/Director accountable for Staffing up group Supplier relationship development, pricing negotiations and cost model With engineering manager supplier selection System requirements Positions to be filled by time of production: product engineer, test engineer (if internal test development), quality engineer/document control, supply planner/buyer/order management March 2006 Semiconductor Operations Consulting

Resource Requirements Product Engineer Characterization plan and execution Yield Management strategy DFT Strategy March 2006 Semiconductor Operations Consulting

Resource Requirements Planner/Buyer/Customer Service (at production ramp time) Accept and place purchase orders Contract reviews Manage logistics of shipment to end customers Forecast management Build plan development March 2006 Semiconductor Operations Consulting

Resource Requirements Quality Engineer (at netlist time) Document control development and management (especially important if shipping software and/or ISO compliance) Supplier quality management Customer quality management Component qualification plan and execution March 2006 Semiconductor Operations Consulting

Fixed Operations Costs What are the fixed cost assumptions? (based on the number of tapeouts annually) Mandatory to model the following costs: Labor International travel and communications IT support personnel IT systems and maintenance Transportation and insurance Inventory carrying costs Facilities March 2006 Semiconductor Operations Consulting

Operations Cost – when in Production Essential Infrastructure Captive Operations Labor: 4-5 “Perfect-fit” employees, office space, travel, salary, benefits, computers, software $800K to $1M Annually Shipping logistics and insurance 0.3% of COGS IT Infrastructure: Servers, 1 “Perfect-fit” IT employee, supply chain and logistics software, document control, yield management, maintenance and support $200K to $500K NRE Up to ½ of NRE annually March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Fixed Operations Cost Staffing If you have flip chip or thermal or electrical enhancements, add one packaging expert expect to pay at least ½ of package development cost for characterization If analog content is greater than 20%, add one test engineer and plan 6 months to find If using alternate fab processes, add at least one process engineer Remember the risk if you have only one expert in any given area… What will you do if they leave? March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Material Cost Modeling Available at time of Print IC Knowledge Corp: “Current Year IC Cost Model: www.icknowledge.com Use FSA wafer pricing data and build your own March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors NRE Masks/Merge if IP Load boards (3 per product) Probe cards (3 per product) Burn-In boards Sockets Proto wafers (12 wafers) Corner lot (12 wafers) Sort, package, assembly, test of qualification and corner lots Qualification testing cost (Life test, ESD, Latch Up, Temp Cycle) Tester time rental or supplier test program development cost Package design and tooling Ball placement tool (BGA only) March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Wafer Cost Process technology (nPoly layers, xMetal layers) Die Size Xeff (mm) = X + adj. factor for scribe lines (120 to 250m) Die Size Yeff (mm) = Y + adj. factor for scribe lines Die Area (mm^2) Gross Die Epi/LV/LPa or other custom process adders Backgrind cost/wafer Yield parameters: Process complexity n Effective do (/in^2) w/small die yield adjustment March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Gross Die Formula Each foundry has their own gross die formula General formula: Gross dies per wafer = (area of wafer)/(area of die) - Pi*(wafer diameter)/(sqrt(2*die area)) March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Defect Density Projections Poisson's yield model: Yield = exp(-A*D0) Both defect density and process complexity lumped into one parameter D0. Negative binomial model: Yield = 1/((1+A*D0)^n) Defect density and process complexity separated out into two parameters. Murphy's yield model: Yield = ((1-exp(-A*D0))/A*D0)^2 This one is not as popular as the previous two. March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Defect Density Projections (continued) If using 30% or more SRAM effective defect density is higher than logic and must be adjusted Analog IP are less defect density sensitive, but difficult to predict using defect-based yield models March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Assembly Cost Package type Body size Thickness Lead spacing Ball/pin pitch Pin count Number of substrate layers Number of bond wires Assembly yield Electrical characteristics Thermal characteristics (qJA) and analysis Cavity up or down or flip chip March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Test Cost Tester cost/hour (platform required) Probe testing temperature Final test temperature Handler index time Prober index time Utilization factor at sort Utilization factor at final test Final test time in CPU seconds Wafer sort time in CPU seconds Final test yield Wafer sort yield (in addition to defect density) March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Overhead Cost Operations overhead $ (% of units manufactured) IT overhead (systems and people to support operations) March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Variable Cost Factors Production Ramp Cycles of Learning Whatever production cost is, plan for at least 2X cost for first 3 months of production. Need to optimize: Yield Test time Cycle time Can be longer based on volume ramp. Typically need 5 wafer lots at least for digital products Don’t underestimate cost and labor to get product out Need slush fund for debug (ebeam, FIB) Model risk buy contingencies Can you afford all risk buy material to be scrapped at your cost? March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Key Things To Remember Supplier quotes Ensure all necessary steps included Scan, bake, dry pack 5V tolerant mask step Package cost factored by number of bond wires Development of sort, final test and QA programs Realistic start up and production final test time, including set up and index time (understand test cost models) March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Key Things To Remember Transportation costs for prototypes, preproduction and shipping to assembly (Re: variable costs) Import/Export classification (DES encryption can add 4 month to product classification time) Product insurance March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Key Things To Remember Can you afford the operational people if your first product needs to be redesigned? This is when most companies need to have a Reduction in Force. Minimize this negative impact Prepare contingency modeling for time and cost if redesign or respin is needed IT infrastructure Reverse bill of materials needs tier II ERP vendor as a minimum Yield management model is required, you own it if you own operations Reporting, backlog, costed BOM is critical if you own operations Document Control needs to be put in early, low cost, but trains everyone to control Docs March 2006 Semiconductor Operations Consulting

Semiconductor Operations Consulting Key Things to Remember Be clear on the core skills of your company: Physical design and operations ownership Getting the right product to market Don’t underestimate supply relationship building There is a lot of trust involved in this business Don’t start too late – you will not recover! Cash conservation and contingency planning are critical Where are your funding dollars best spent? March 2006 Semiconductor Operations Consulting