NEW ACUTE HOSPITAL, STOKMARKNES Development and solutions

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Jack Jedwab Association for Canadian Studies September 27 th, 2008 Canadian Post Olympic Survey.
Repaso: Unidad 2 Lección 2
1 A B C
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
David Burdett May 11, 2004 Package Binding for WS CDL.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Create an Application Title 1Y - Youth Chapter 5.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
CHAPTER 18 The Ankle and Lower Leg
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
Turing Machines.
1 Room Planning Service Area.
PP Test Review Sections 6-1 to 6-6
Maths Trail. How many hanging baskets are there in the garden? 1.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Regression with Panel Data
1 The Royal Doulton Company The Royal Doulton Company is an English company producing tableware and collectables, dating to Operating originally.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 TV Viewing Trends Rivière-du-Loup EM - Diary Updated Spring 2014.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Subtraction: Adding UP
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
One-Degree Imager (ODI), WIYN Observatory What’s REALLY New in SolidWorks 2010 Richard Doyle, User Community Manager inspiration.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Presentation transcript:

NEW ACUTE HOSPITAL, STOKMARKNES Development and solutions PRESENTATION AT THE IFHE WORLD CONGRESS 2012 Architect MNAL Svein Erik Tøien BOARCH arkitekter as Commissioner: Nordlandssykehuset HF Architect: BOARCH arkitekter as Consultant structural engineering: Rambøll as Consultant technical engineering: Norconsult as Project administration: Hospitalitet as/ Hartmann Prosjektrådgivning as 1

NORDLANDS-SYKEHUSET HF NLSH Vesterålen NORDLANDS-SYKEHUSET HF 2 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

AREA OF SERVICE Area Vesterålen – appr. 30.000 inhabitants NLSH Vesterålen 3 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

MAIN NUMBERS Population in capture area: Appr. 30.000 inhabitants NLSH Vesterålen Population in capture area: Appr. 30.000 inhabitants Function area: Appr 8000 m2 Gross area: Appr 14.900 m2 Budget frames: Appr 900 mill. NOK Start construction: September 2010 Project planned finalised: August 2014 Normal beds incl maternity ward: 69 Observation beds: 5 Surveillance beds : 5 Post-surgery beds : 5 Outpatient treatment rooms: 26 Daycare places; dialysis, medical and surgical: 17 (7+5+5) Operating theaters: 3+1 Birth rooms: 2 4 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Year 2000 – Existing environment HSH Stokmarknes skisseprosjekt 17.06.03 Year 2000 – Existing environment BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

Optimistic start – the existing structure is assumed to be fit for future use, demanding total renovation and reconfiguration… HSH Stokmarknes generalplan 2001 – GENERAL PLAN BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

…A simple pattern for logical grouping of functions was developed Ambulanse-inngang Mottagelse Observasjon Surgery Acute section: Intensive care Recovery Beds Vakt Radiology Main entrance Cantine Kiosk Lab. Outpatient Script service Radiology Resep-sjon Public/outpatient functions Acute functions Receipt Main kitcen Central supplies Treatment functions Technical plant Technical dept Laundry Waste handeling Bed- handeling Cleaning services Textile services Beds HSH Stokmarknes skisseprosjekt 17.06.03 Grouping of functions Technical and administrative functions BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

… and a first complete scedule for renovation and extentions to the hospital, is commissioned, compensating low buliding heights with creative use of glass and levels HSH Stokmarknes skisseprosjekt 17.06.03 SKETCH PROJECT 2003 BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

2004 – SCETCH FOR A COMPACT, NEW HOSPITAL … then, a year later, the regional health administration got a new director of medical profession, putting forth a strong urge to build new, instead of mending the old stuff… LOWER LEVEL – «PUBLIC» UPPER LEVEL – «ACUTE» HHF Stokmarknes idéprosjekt nybygg 25.02.04 2004 – SCETCH FOR A COMPACT, NEW HOSPITAL BOARCH arkitekter as

Two alternative sketch projects followed, analyzing the differences in cost, and concluding that building new is the most economic solution. HHF Stokmarknes skisseprosjekter 29.11.2004 2004 – SKETCH PROJECT 2-3 10 V BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

NEW CONSIDERATIONS – SINTEF ENGAGED The project was then challenged on flexibility and generality. A period of thorough analysis and studies, led by SINTEF Health, followed... HHF Stokmarknes skisseprosjekt 2008 NEW CONSIDERATIONS – SINTEF ENGAGED 11 BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

USER PARTICIPATION – TRYING OUT LAYOUTS … the users were invited to participate actively... HHF Stokmarknes skisseprosjekt 2008 USER PARTICIPATION – TRYING OUT LAYOUTS 12 BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

SCETCH PROJECT 4 – 2008: INITIAL STUDIES … and the architects challenged the “usual” patterns of hospital layouts… All beds and acute functions on one level 10 2 7 8 Beds in 2 levels All beds in one level, divided from acute functions 1 4 3 Beds in 3 levels NLSH Vesterålen utvikling skisseprosjekt 2008 SCETCH PROJECT 4 – 2008: INITIAL STUDIES 13 6 5 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

STUDY OF OTHER HOSPITALS 2008 – study of other hospitals’ bed areas St. Olavs hospital 48 beds Ringerike sykehus 36 beds Bærum sykehus 24 beds Visby lasarett 30 beds NLSH Bodø forprosjekt 54 beds NLSH Vesterålen utvikling skisseprosjekt 2008 STUDY OF OTHER HOSPITALS NLSH Vesterålen sketch project 2004 58 beds BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

SCETCH PROJECT 4 – 2008: INITIAL STUDIES …trying out totally different shapes… 2A 7A 9A 12A 13A 11A NLSH Vesterålen utvikling skisseprosjekt 2008 SCETCH PROJECT 4 – 2008: INITIAL STUDIES 15 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

SCETCH PROJECT 4 – 2008: INITIAL STUDIES 2008 – closing down to 5 alternatives 2B 7A 9B 14A 8A NLSH Vesterålen utvikling skisseprosjekt 2008 SCETCH PROJECT 4 – 2008: INITIAL STUDIES 16 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Alternativ 9B 3D from south 2008 – one model showing signs of final layout NLSH Vesterålen utvikling skisseprosjekt 2008 Alternativ 9B 3D from south 17 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Bed clusters – early ideas Brainstorming around bed clusters – concluding that daylight into the middle of the cluster is essential NLSH Vesterålen utvikling skisseprosjekt 2008 Bed clusters – early ideas 18 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Sengeområde – bad til alle rom Bending fasade to minimize length NLSH Vesterålen utvikling skisseprosjekt 2008 Sengeområde – bad til alle rom 19 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Striving towards a compact sceme – but is it compact enough? Gross/net factor in one wing appr. 1,7 Length 3 bed clusters appr. 78 m NLSH Vesterålen skisseprosjekt 2008 Wing of bed clusters 20 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Bed cluster – scheme TREAT-MENT WORKSTATION DINING KITCH EXAMIN SINGLE NLSH Vesterålen skisseprosjekt 2008 Bed cluster – scheme 21 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Flexibility in bed area – clusters linked General bed clusters can be adapted to different needs for bed types NLSH Vesterålen forprosjekt 2009 Flexibility in bed area – clusters linked 22 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

The site in 2009 - before construction start NLSH Vesterålen forprosjekt 2009 The site in 2009 - before construction start 23 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Most of the existing hospital buildings are plannet demolished after completion of the sceme DR. THODES GATE SYKEHJEM SYKEHJEM ? ? PSYK. BUILDINGS PLANNED DEMOLISHED PSYKIATRI PSYK. PARK. IVAR BERGSMOS GATE HADSEL- HALLEN SITE BORDER PARK-VEIEN HADSELHALLEN Exisiting site - NLSH Vesterålen skisseprosjekt 2008 BARNE- HAGE 24 BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

Sun studies of existing site 12. october/3. march kl 10 og 12 Cad-generated sun studies – revealing a shadowy southern part of the site from october to march Kl. 10 Kl. 12 HHF Stokmarknes skisseprosjekter 29.11.2004 Sun studies of existing site 12. october/3. march kl 10 og 12 25 BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

Sun studies of the building model NLSH Vesterålen skisseprosjekt 2008 Sun studies of the building model 26 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Alternative 9C Climate analysis Climate study analyzing wind and snowdrift – revaling needs for shielding vegetation NLSH Vesterålen skisseprosjekt 2008 Alternative 9C Climate analysis 27 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Sketch outdoor facilities Wind-damping vegetation and atriums for exercise is part of the sceme NLSH Vesterålen forprosjekt 2009 Sketch outdoor facilities 28 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Pattern of expansion Possible expansion in three directions NLSH Vesterålen forprosjekt 2009 Pattern of expansion 29 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Site plan NLSH Vesterålen forprosjekt 2009 30 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Plan ground floor: Main entrance, outpatient functions and technical service NLSH Vesterålen detaljprosjekt Ground floor 31 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

First floor Upper/first floor: Acute entrance and inpatient functions Operation Birth Acute reception, observation, surveillance 24 beds 24 beds 19 beds incl. pasient hotel NLSH Vesterålen detaljprosjekt First floor 32 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Second floor Administration and ventilation plants NLSH Vesterålen detaljprosjekt Second floor 33 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Each bed cluster has its defined «square», a defined architectural place for identification and belonging for the patients… NLSH Vesterålen forprosjekt 2009 Axonometry bed area 34 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspective 3 bed clusters in a row Visibilty between the workstations was crucial in the layout NLSH Vesterålen detaljprosjekt Perspective 3 bed clusters in a row 35 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Axonometry bed cluster … NLSH Vesterålen forprosjekt 2009 Axonometry bed cluster 36 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspective bed cluster - I Environment in one bed cluster… NLSH Vesterålen forprosjekt 2009 Perspective bed cluster - I 37 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspektiv bed cluster - II … seen across NLSH Vesterålen forprosjekt 2009 Perspektiv bed cluster - II 38 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspective bedroom Environment in bedroom, with large bay window NLSH Vesterålen forprosjekt 2009 Perspective bedroom 39 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspective patient-zone Each bed cluster features a zone for patient resting near the workstation, and with access to wintergarden/multi-use space NLSH Vesterålen forprosjekt 2009 Perspective patient-zone 40 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Vintergarden/play area …used for childrens play… NLSH Vesterålen forprosjekt 2009 Vintergarden/play area 41 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Wintergarden/tactile-/plant room …or plant/tactile room… NLSH Vesterålen forprosjekt 2009 Wintergarden/tactile-/plant room 42 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

The main expedition is easily found by the main entrance NLSH Vesterålen forprosjekt 2009 Main expedition 43 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Corridor by surgical area Circulation areas with daylight and wiews for orientation NLSH Vesterålen forprosjekt 2009 Corridor by surgical area 44 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Surveillance area Extensive use of glass for contact between functions NLSH Vesterålen forprosjekt 2009 Surveillance area 45 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Use of colours to give identity to different wings INTERIØR KONSEPT GRØNT FARGETEMA: FONDVEGG & TEKSTILER LAMMHULTS ”CINEMA SPORT”, H450mm, I GABRIEL ”COMFORT 0049” VEGG KORRIDOR, OVERFLATE FAST & LØST INVENTAR: NCS S0500-N NORTHERN LIGHTING ”DOKKA” PENDEL I KROM TIL SENGEROM VINYLGULV: TARKETT IQ NATURAL 173 OFFECCT ”GRIP” HVITT SIDEBORD, H440mm, M. TILHØRENDE BLOMSTERVASE (BORDPLATE I CORIAN) HVITPIGMENTERT EIK DETALJER I FAST INVENTAR HELLAND ”GENT” HVILESTOL, H460mm, I GABRIEL ”COMFORT 0049” GARDIN: ALMEDAHLS ”UNI 75689-3” FONDVEGG SENGEROM, TUN B1: BUTINOX 5757 ”FRI” FONDVEGG SENGEROM, TUN B2: NCS S 2030-G80Y FONDVEGG SENGEROM, TUN B3: NCS S 2010-G30Y BOARCH arkitekter as PLAN 2, FLØY B: SENGEROM NLSH VESTERÅLEN

Facade materials and details Glass, aluminium, brick, stone and wood combined to emphasize the different elements of the buliding NLSH Vesterålen forprosjekt 2009 Facade materials and details BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Gross bulding height 4,5 m, and flat beam-and-slab constructions allow flexibility for future changes in technical facilities NLSH Vesterålen forprosjekt 2009 Constructions BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Main technical supplies are conducted via subway, passing along the core of the building wings. Economical limitations put a hold to establishing a complete basement… NLSH Vesterålen detaljprosjekt Plan culvert 49 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Technical supply duct … NLSH Vesterålen forprosjekt 2009 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Ventilation plant rooms are located on roof, central on each wing, minimizing distances and duct dimensions. Calculated energy consumption 284 kWh/m2 and year NLSH Vesterålen forprosjekt 2009 Ventilation, heating BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Access, controll and security Security combined with openness – ensured through extensive zoning NLSH Vesterålen forprosjekt 2009 Access, controll and security BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspective from north east NLSH Vesterålen detaljprosjekt Perspective from north east 53 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Perspective from south west NLSH Vesterålen detaljprosjekt Perspective from south west 54 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Atrium south NLSH Vesterålen forprosjekt 2009 55 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Atrium north – training garden NLSH Vesterålen detail project Atrium north – training garden 56 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Building site dec. 2011 NLSH Vesterålen detail project 57 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Building site march 2012 NLSH Vesterålen detail project 58 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Building site march 2012 …the first users have already moved in… NLSH Vesterålen detail project Building site march 2012 59 BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as