1 The American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009.

Slides:



Advertisements
Similar presentations
Potential Federal and State Funding for a Madison New Start Transport 2020 Implementation Task Force June 28, 2004 Rod Clark WisDOT Bureau of Transit &
Advertisements

Committee of Practitioners March 19, Even Start Application 2. Homeless Education 3. Migrant Education Program 4. ED Monitoring 5. SES Appeals.
Superintendents Quarterly Meeting March 13, 2009.
The Current State of the States: Is there Light at the End of the Tunnel? NASACT Economic Summit Charleston, WV August 11, 2010 Brian Sigritz Director.
2011 State and Local Fiscal Outlook. 2 State and Local Governments in the U.S. Economy Major employer (about 14 percent of total U.S. employment in 2009)
Mn/DOT Economic Recovery Forum Feb. 13, Agenda 8 a.m. - Welcome Julie Skallman, Mn/DOT 8:15 a.m. - Transit, Freight and Aviation Overview Tim Henkel,
Mn/DOT Economic Recovery Program Update Feb. 19, 2009.
2009 Roadway Conference April 20, 2009 Cathy Nelson, Technical Services Manager / Chief Engineer.
ARRA Update All funds were obligated by Of the funds programmed with FHWA, 80% has been expended Allowance for funds released after –Must.
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
1 Understanding IDEA and MOE under the ARRA The basics of maintenance of effort 4/09.
November Overview of Presentation MAP-21 Overview Outline of the FY 2013 Apportionment Notice Key Provisions and Interim Guidance – Planning and.
New York State Division of Housing and Community Renewal The American Recovery and Reinvestment Act: Realizing the Potential of the Weatherization Assistance.
Federal Lands Highway Program Scott Johnson Office of Federal Lands Highway Federal Highway Administration Scott Johnson Office of Federal Lands Highway.
1 FTA AND THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 ITS Georgia Luncheon May 28, 2009.
American Recovery and Reinvestment Act of 2009 ITS - Georgia Chapter May 28, 2009.
1 The American Recovery and Reinvestment Act of 2009 (ARRA) Satvinder Sandhu & Frances Sakaguchi, FHWA.
1 American Recovery and Reinvestment Act of 2009 Association of Government Accountants May 12, 2009 Robert J. Tuccillo Chief Financial Officer Federal.
1 American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009.
June 2009 American Recovery and Reinvestment Act of 2009 TIGER Discretionary Grant Program.
Implementation of the FY 2010 Federal Transit Program and other “Hot Topics” December 8, 2010.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
1 Transportation Update. 2 Overview Pre-legislative effort The American Recovery and Reinvestment Act of 2009 (ARRA) – Highway – Transit – Discretionary.
1 The Development of Federal Surface Transportation Authorization Legislation Jim Kolb Committee on Transportation and Infrastructure U.S. House of Representatives.
Preparing To Receive Economic Stimulus Funds An APTA Webinar Hosted In Conjunction With The Federal Transit Administration February 13, 2009.
THE PRESIDENT’S FISCAL YEAR 2012 BUDGET REQUEST Federal Transit Administration.
Highway Funding 2009 and Beyond: The States’ Perspective AASHTO Executive Director John Horsley Pacific Northwest Waterways Association Washington, D.C.
ARRA Grants & Procurements American Recovery Reinvestment Act Training.
Office of Infrastructure Investment 1 Jeffrey A. Simon Director of Infrastructure Investment.
Eere.energy.gov Rebuild Hawaii Consortium – 3/5/2012 Peter Ashley DOE / EERE Presentation.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
The Recovery Act in Michigan June Michigan Recovery and Reinvestment Plan 2 The American Recovery and Reinvestment.
SAFETEA-LU Highlights Roger Petzold Office of Interstate and Border Planning Federal Highway Administration Transportation Border Working Group Nov. 9,
East-West Gateway Council of Governments February 25, 2009 American Recovery and Reinvestment Act: Transportation Elements.
FY 10 Budget Balancing Plan and the Impact of the American Recovery and Reinvestment Act Mary Lassiter State Budget Director June 4, 2009.
FY 2012 President’s Budget Released February 14, 2011.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
Highway Program Financing July Michigan Allocations Federal Law + State Law + Michigan Policy = MDOT & Local Allocations of Federal Apportionment.
Michigan Recovery and Reinvestment Plan michigan.gov/recovery 1 The Recovery Act in Michigan August 2009.
1 North Carolina Department of Transportation Financial Overview Mark L. Foster April 20, 2010.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Surface Transportation Authorization AASHTO Executive Director John Horsley SCOH Subcommittee on Construction Chicago, Illinois August 4, 2009.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
Michigan Recovery and Reinvestment Plan michigan.gov/recovery 1 The Recovery Act in Michigan SMACNA Metropolitan Detroit Chapter November 2009.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
John S. Halikowski ADOT Director Phoenix Chamber of Commerce Transportation Committee Sept. 22, 2011.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Steve Baumann Financial Specialist (503) Mike Morrow(Field Operations Engineer) Mike.
The American Recovery and Reinvestment Act of 2009 (Recovery Act) Data Reporting Federal Highway Administration September, 2009.
American Recovery and Reinvestment Act of 2009 CAPITAL REGION TRANSPORTATION PLANNING AGENCY.
1 SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Office of Program Management Tribal Transit Outreach.
City-County- State-Federal Cooperative Committee March 18, 2009 Walter C. Waidelich Jr. California Division Federal Highway Administration Future Directions.
Stimulus Funding for Food and Nutrition Programs Oklahoma Food Security Committee May 28, 2009 David Blatt Director of Policy, Oklahoma Policy Institute.
A Recovery Act Update for Michigan Nonprofits Leslee Fritz, Director MI Economic Recovery Office April 14, 2009.
Investing in Transportation Infrastructure Government Research Association Annual Policy Conference Janet Oakley, AASHTO July 28, 2009.
Implementation of the American Recovery & Reinvestment Act (ARRA) of 2009 FHWA Georgia Division February 25, 2009.
1 CONNECTICUT DEPARTMENT OF TRANSPORTATION’S ARRA REPORTING June 1, 2009 R2 CTDOT Internal Version.
American Recovery & Reinvestment Act Discussion February 13, 2009.
OSAE sets the PACE: Premier Auditing Consulting and Evaluations! American Recovery and Reinvestment Act (ARRA) Readiness Review.
Nathan Pryor Eileen Yazzie February 17, 2009 American Recovery and Reinvestment Act of 2009 Working Group Meeting #2.
Association of Metropolitan Planning Organizations Fixing America’s Surface Transportation (FAST Act) April 7, 2016.
MAP-21 Formula Briefing Preliminary DRAFT. Moving Ahead for Progress into the 21 st Century (MAP-21) MAP-21 was passed by Congress and signed by the President.
1 Hearing to Discuss the Potential Interplay and Effect of the Money Available to States’ Low- Income Weatherization Programs under the American Recovery.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
ADMINISTRATION Legislative Update Transportation Policy Committee March 24, 2010.
Stimulus Package Planning Programs and Funding in The American Recovery & Reinvestment Act (ARRA) April 21st, 2009.
Economic Recovery in Washington State
The American Recovery and Reinvestment Act of 2009
American Recovery and Reinvestment Act of 2009 Funding
Preparing To Receive Economic Stimulus Funds
Presentation transcript:

1 The American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009

2 Outline •Objectives of the Act •Funding Availability/Distribution •Requirements/Provisions •Accountability and Transparency –Reporting Requirements –FHWA Stewardship and Oversight –Highway Sign Design •Additional Information

3 President Barack Obama Inaugural Address – Jan. 20, 2009 “For everywhere we look, there is work to be done. The state of the economy calls for action, bold and swift, and we will act – not only to create new jobs, but to lay a new foundation for growth. We will build the roads and bridges, the electric grids and digital lines that feed our commerce and bind us together…All this we can do. All this we will do.” - President Barack Obama

4 Main Objectives of the Act •Job preservation and creation •Infrastructure investment •Energy efficiency and science •Assistance to unemployed, and •State and local fiscal stabilization

5 ARRA Highlights •Signed into law on February 17, 2009 •$787 billion total investment •$48.1 billion for transportation, including: –$27.5 billion for highways –$8.4 billion for transit –$8.0 billion for high speed rail –$1.3 billion for Amtrak –$1.5 billion for National Surface Transportation Discretionary Grants •Significant accountability, transparency and reporting requirements

6 Highway Portion Distribution of Funding •$27.5 billion available through Sep. 30, 2010 •Amounts allocated before apportionment: –$550 M Federal Lands Highway and Indian Reservation Program •$310 M Indian Reservation Roads Program •$170 M Park Roads and Parkway Program •$60 M Forest Highway Program •$10 M Refuge Roads Program

7 Highway Portion Distribution of Funding –$20 M Highway Surface Transportation and Technical Training (OJT/Supportive Services) –$20 M DBE Bonding Assistance –$45 M Territorial Highway Program –$105 M Puerto Rico Highway Program –$60 M Ferry Boat Discretionary Program –$40 M FHWA Oversight

8 Funds Apportioned To States •$26.6 billion total apportionment to States •Formula based on 50/50 combination of –Surface Transportation Program in 23 USC 104(b) –Same ratio as the obligation limitation distribution for FY 2008

9 Funds Apportioned To States •Set-asides and suballocation of funds –3% set-aside for Transportation Enhancements –30% suballocation per STP requirements •Funds suballocated for –Individual Areas over 200,000 population –Areas with populations less than or equal to 200,000 –A portion is reserved for areas less than 5,000 population

10 Appropriation for Highways- $27.5B Less Amount Allocated Before Apportionment $840M Remainder Apportioned to States $26.6B Transportation Enhancements – 3% Sub-Allocation for Areas Based on Population – 30% For Any Area of the State – 67% For Individual Urbanized Areas over 200,000 by % of Population For Areas with Population ≤ 200,000 For Areas with Population <5000 Distribution of Highway Funds Under ARRA

11 Funds Apportioned to State •Eligible Uses –Restoration, repair, construction and other activities under Surface Transportation Program –Passenger and freight rail transportation and port infrastructure projects as described under TIFIA •May not be used for conversion of advance construction on previously authorized federal-aid projects. •Federal share up to 100%

12 Funds Apportioned to State •Act also states that in establishing project priorities for funding, priority is to be given to projects that are: –Projected for completion within 3 years –Located in economically distressed areas –Expeditious project delivery –Maximizing job creation and economic benefit

13 Use It or Lose It Provisions •First Redistribution –Fifty percent of funds apportioned to the State – excluding funds sub-allocated – must be obligated within 120 days or the remainder will be redistributed. •Second Redistribution –After 1 year all unobligated balances of apportioned funds, included funds sub-allocated, will be redistributed. Recipients of redistributed funds will have until Sept. 30, 2010 to obligate. 67% For Any Area of the State 3% TE 30% Sub-Allocation At 120 days 50% of the apportioned funds must be obligated (excluding sub-allocated funds)

14 Maintenance of Effort Sections 1201(a) and (b) •Certification by Governor –Within 30 days of enactment, the Governor must certify to the Secretary that the State will maintain the level of State funding for transportation projects. –Must identify the amount of funds the State planned to expend from State sources from the date of enactment through September 30, 2010.

15 Maintenance of Effort Sections 1201(a) and (b) •Failure to Maintain Effort –The State will be prohibited from receiving additional limitation in August redistribution for fiscal year 2011 •Executed at Governor to Secretary level.

16 Other Certifications Section 1511 and Section 1607 •The ARRA also requires two additional certifications: –Section 1511: The Governor is to certify that infrastructure investments have received the full review and vetting required by law. –Section 1607: The Governor is to certify within 45 days that the State will request and use funds provided by the ARRA and the funds will be used to create jobs and promote economic health.

17 DBE Requirements •DBE Goals in Section 1101 (b) of SAFETEA- LU apply to ARRA funds. •Provides $20 million in bonding assistance under 49 USC 332(e) –Minority Resource Center in OST •Provides $20 million for On The Job Training/Supportive Services –Supplement existing OJT Programs –Entertain new starts (template to be provided) –Resurrect Business Opportunity Workforce and Development (BOWD) concepts or other unfunded past efforts –Other Ideas – e.g. Wounded Warrior Program in Virginia

18 Buy American Provisions •Due to the Applicability of Title 23 Requirements in Title XII, there will be no changes in our BA implementation for ARRA projects •FHWA’s BA statutory provisions in 23 USC 313 and our regulatory policies in 23 CFR apply. •Waivers must be in the Federal Register

19 Davis Bacon Requirements •Davis Bacon will apply to all ARRA projects (the existing exclusion for local roads and rural minor collectors will not apply). •This is the result of the “Notwithstanding any other provision of law and in a manner consistent with other provisions of this Act…” language in Section 1606.

20 National Surface Transportation Discretionary Grants •$1.5 billion (≤ $200 million for TIFIA) •Projects with significant impact on Nation, Metropolitan Area or Region. •Ensure equitable geographic distribution of funds and appropriate balance between urban/rural •≤ 20% of total funds to single State •Grants between $20-$300 million •Federal share up to 100%

21 National Surface Transportation Discretionary Grants •Priority to projects that require additional share of Federal funds to complete financing. •Priority to projects expected to be completed within 3 years of enactment. •Publish competitive criteria within 90 days of enactment •Applications submitted not later than 180 days after the publication of the criteria •All projects selected within 1 year •Obligated by end of FY 2011

22 Accountability and Transparency “Every American will be able to hold Washington accountable for these decisions by going online to see how and where their tax dollars are being spent.” - President Barack Obama

23 Reporting Requirements Types of Reports •Types of Reports –Certification –Periodic (90 & 180 days and 1, 2, & 3 years) –Quarterly •Data for Periodic and Quarterly Reports –Projects (Monthly data from States) –Finance –Jobs (Monthly Data from States)

24 Proposed Data Model Conceptual Overview Data Integration, Analysis, & Reporting Bid Tab Database Finance (FMIS) Reports, Maps, and Charts Jobs, Awards & Project Status

25 Overview State DOT provide data to FHWA Periodic Grouped Project reports Location, Project number, Purpose, Description, Cost and Project Schedule Initial reports Project number Name of project Description Purpose Cost Rationale Location Project Schedule EDA NEPA Information FHWA provide data Periodic reports Indirect jobs Monthly reports Appropriated Allocated Obligated Outlayed Geospatial data Highway network Per capita income Unemployment rate Monthly reports Employment: •Number •Hours •Payroll Projects: •Critical dates •% Complete •Contractor Info

26 Periodic Reports Reporting Schedule •Required 90 & 180 days, and 1, 2, and 3 years after enactment. •First report due to Congress by May 18 •Monthly and periodic reports will serve as input •Includes information on: 1.Number of projects where work has begun 2.Number of projects where work is complete 3.Number of direct and indirect jobs 4.Aggregate expenditure of State funds 5.Total amount appropriated, allocated, obligated, and outlayed 6.Number of projects let to bid and number of projects awarded

27 Quarterly Reports Reporting Schedule •Monthly and periodic reports will serve as input for the quarterly reports •FHWA reports to Recovery.gov within 30 days of the end of each calendar quarter •First report due by July 30, 2009 •Includes information on: 1.Name of project 2.Description of project 3.Estimate of completion status 4.Number of jobs created and number of jobs retained 5.Purpose, cost, and rationale 6.Subcontract information 7.Total funds received 8.Total amount expended or obligated

28 FHWA Stewardship and Oversight •Delivery of the ARRA is the top priority for FHWA •FHWA is redirecting existing staff and adding additional part-time and full time staff to support increased work load.

29 FHWA Stewardship and Oversight •Projects must follow all Federal requirements •Projects will be advanced with maximum flexibility under the regulations •Projects will be administered in accordance with our normal Stewardship Agreements

30 FHWA Stewardship and Oversight •A higher level of accountability and increased attention by GAO and IG is expected. •FHWA is developing an ARRA Risk Management Plan. •FHWA will use a variety of techniques to conduct in-process examination of areas identified as high risk. •Financial management and State oversight of local projects will be areas of particular attention.

31 ARRA Project Sign

32 ARRA Project Sign: Guidance •Sign Design –Sign design layout and color should be similar to the sign design shown on the previous slide •Sign Placement –Should be easily identifiable with the ARRA project –Should not obscure other traffic control devices –Should not be places near key decision points.

33 For More Information •Visit our ARRA website at: h ttp:// –Summary of Highway Provisions –Implementing Guidance –Funding Distribution Tables –Frequently asked questions –Best Practices –ARRA Calendar of Key Dates