TGbd Closing Report – Vietnam

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
Advertisements

IEEE mc Closing Report for March 2015
Doc.: IEEE /0695r0 Report May 2015 Dorothy Stanley, Aruba NetworksSlide 1 IEEE mc Closing Report for May 2015 Date: Authors:
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /1185r0 Submission Sep 2012 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /1419r2 Submission Nov 2012 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /1462r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOKoden Techno Info.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
Doc.: IEEE /0163r0 Submission Jan 2013 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGa Project Timeline
TGax March 2017 Closing Report
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
TGaf Waikoloa Closing Report
Next Generation V2X Study Group Nov 2018 Agenda
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
NGV SG Closing Report – Hawaii, USA
2017 Jan Sun Mon Tue Wed Thu Fri Sat
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGs Montreal Closing Report
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
Jan Sun Mon Tue Wed Thu Fri Sat
TGaf Geneva Closing Report
TGac Status and Timeline
IEEE ah Timeline Projection
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGaf San Francisco Closing Report
TGaf San Antonio Closing Report
An Introduction of IEEE TGbd
802.11bd Timeline Date: Authors: January 2019
IEEE TGbd Jan 2019 Agenda Date: Author: Jan 2019
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
TGn Closing Report Los Angeles, CA, US 802 Interim
TGbd Closing Report – St. Louis, US
July 2018 doc.: IEEE r0 July 2018 PAR Review SC - Meeting Agenda and Comment slides - July 2018 – San Diego Date: Authors: Jon.
TGaf Waikoloa Closing Report
IEEE TGbd Mar 2019 Agenda Date: Author: Mar 2019
Proposed timeline for the Light Communications TG
IEEE TGmc January 2014 Agenda
TGbd Closing Report – Vancouver, Canada
NGV SG Closing Report – Bangkok, Thailand
IEEE SGa Project Timeline
IEEE TGbd Jan 2019 Agenda Date: Author: Jan 2019
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
IEEE TGbd Mar 2019 Agenda Date: Author: Mar 2019
September 2009 Closing Report
Timeline for the Light Communications TG
November 2010 Closing Report
TGm Closing Report – May 2010
IEEE TGbd Mar 2019 Agenda Date: Author: Mar 2019
TGbd Closing Report – Atlanta
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
IEEE TGv November 2010 Agenda
IEEE TGbd Jan 2019 Agenda Date: Author: Jan 2019
PAR Extension Motions Date: Authors: July 2016 Name Company
IEEE mc Closing Report for September 2015
IEEE TGbd Mar 2019 Agenda Date: Author: May 2019
TGae Closing Report – November 2011
IEEE TGbd Jul 2019 Agenda Date: Author: Jul 2019
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
IEEE TGbd Jul 2019 Agenda Date: Author: Jul 2019
TGax November 2017 Closing Report
IEEE TGbd Sep 2019 Agenda Date: Author: Sep 2019
Presentation transcript:

TGbd Closing Report – Vietnam May 2018 doc.: IEEE 802.11-18/0980r0 Sep 2019 TGbd Closing Report – Vietnam Date: 2019-09-19 Authors: Bo Sun (ZTE) Jon Rosdahl, Qualcomm

Abstract Closing report for Sep 2019 TGbd meeting in Hanoi, Vietnam May 2018 doc.: IEEE 802.11-18/0980r0 Sep 2019 Abstract Closing report for Sep 2019 TGbd meeting in Hanoi, Vietnam Bo Sun (ZTE) Jon Rosdahl, Qualcomm

Completed work items in the week Sep 2019 Completed work items in the week 6 meeting slots were allocated in the week, including two parallel Adhoc slots Meeting agenda: the last revision of 11-19/1412 Work items completed in this week include: Approval of the meeting minutes for Jul meeting and Aug CC Approval of the updated FRD document (11-19/0495r2) Approval of the updated SFD document (11-19/0497r3) Liaison update per IEEE 1609’s progress Approval of the spec draft skeleton document (11-19/1638) Review and update TGbd timeline Milestones from D0.1 will be deferred one or two meetings. Approval of Teleconference plan after Sep meeting 25 tech submissions were presented for the week. 26 motions passed for developing SFD and FRD MON TUE WED THU AM1 TGbd AM2 PM1 TGbd/PHY MAC PHY PM2 EVE Bo Sun (ZTE)

Approved TG Document Sep 2019 TG Document Baseline Version Latest Revision Definition and requirements 11-19/0202r1 Selection Procedure document 11-19/0030r6 Functional Requirement document 11-19/0440r0 11-19/0495r2 Spec Framework document 11-19/0441r0 11-19/0497r3 Liaison response to IEEE VT/ITS 1609 WG 11-19/0437r3 Liaison response to ITU-T CITS 11-19/0843r0 TBbd FRD/SFD Motion Booklet 11-19/0514r0 11-19/0514r10 TGbd Use Case document 11-19/1342r0 TGbd Spec Draft Skeleton document 11-19/1638r0 Bo Sun (ZTE)

Timeline (updated) PAR approved Dec 2018 First TG meeting Jan 2019 Sep 2019 Timeline (updated) PAR approved Dec 2018 First TG meeting Jan 2019 D0.1 Sept 2019  Nov 2019 D1.0 Letter Ballot Nov 2019  Mar 2020 D2.0 LB recirculation Mar 2020  Jul 2020 Form Sponsor Ballot Pool May 2020  Sep 2020 D3.0 LB recirculation May 2020  Sep 2020 D3.0 unchanged recirculation July 2020  Nov 2020 Initial Sponsor Ballot (D4.0) Sept 2020  Jan 2021 Final 802.11 WG approval July 2021  Nov 2021 802 EC approval July 2021  Nov 2021 RevCom and SASB approval Sept 2021  Jan 2022 Bo Sun (ZTE)

Teleconferences and Goal for Sep meeting Planned TC: Date: Oct 8 Time: 6:00pm~8:00pm, ET New TC plan: Date: Oct 22 Time: 10:00am ~ 11:59am Goal for Nov meeting Develop FRD and SFD Approval of spec draft D0.1 Bo Sun (ZTE)