Institutional Strengthening (IS) Project

Slides:



Advertisements
Similar presentations
Intergovernmental Consultation on Strengthening the Scientific Base of the United Nations Environment Programme
Advertisements

United Nations Environment Programme (UNEP) Secretariat of the Basel Convention (SBC) Enhancing cooperation between the Basel Convention and the Stockholm.
United Nations Development Programme Elements of HCFC Phase-out Management Plan Sri Lanka HPMP Inception workshop 31 March 2011.
CAPACITY BUILDING WITHIN THE UNFCCC AND LDCS Richard Muyungi United Republic of Tanzania.
Decisions of the Parties Related to Essential Use Nominations (EUNs) Ozone Secretariat 6 July 2008 Bangkok.
Ninth Replenishment of IFAD’s Resources Draft Resolution: Revisions made since the 2 nd Session of Consultation October 2011.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
Data Reporting Decisions A presentation prepared by the Multilateral Fund Secretariat Joint Meeting of the Latin American and Caribbean Networks of Ozone.
Montreal Protocol Implementation in Sri Lanka- Current Situation and HCFC Phase out challenges Dr W L Sumathipala Senior Technical Advisor Ministry of.
Institutional Arrangements for HCFC Phase-out G.M.J.K Gunawardana G.M.J.K GunawardanaDirector Promotion, Environmental Education & National Ozone Unit.
THE MONTREAL PROTOCOL – MEETING LIBERIA’S OBLIGATIONS UNDER THE PROTOCOL GEF NATIONAL DIALOGUE INITIATIVE (NDI) Cape Hotel, Mamba Point NATIONAL OZONE.
Mahendra Senevirathne Project Coordinator National Ozone Unit Sri Lanka 17 September
Project Overview, Objectives, Components and Targeted Outcomes
Secretariat’s report on ODS sales for uses onboard ships As requested by Decision XXIII/11, the As requested by Decision XXIII/11, the Secretariat’s report.
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
1 Basel Convention on the Control of Transboundary Movement of Hazardous Wastes and Their Disposal Brief background The Convention Implementation actors.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
Paul Desanker Financial and Technical Support UNFCCC secretariat Framework for Capacity- building in Developing Countries Expert Workshop.
ROLE OF PMU IN CFC PRODUCTION PHASE-OUT PROJECT WORKSHOP ON CFC PRODUCTION PHASE-OUT PROJECT Amit Gulati Audit Coordinator-PMU.
1 Integrating (Mainstreaming) Sound Management of Chemicals into National Development Planning United Nations Development Programme Energy and Environment.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Update on decisions from the 62 nd Meeting of the Executive Committee with special reference to decisions regarding HCFC phase-out for LVC countries A.
Implementation of PRTRs as a tool for POPs reporting, dissemination and awareness raising Steering Committee meeting Madrid November 26.
1 Stockholm Convention on Persistent Organic Pollutants Clearing-house Mechanism for Information on POPs. Role of Regional Centres.
Update on HPMP preparation Art. 5 and CEIT ECA Network meeting - May 18-22, 2009 Yerevan, Armenia.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Secretariat of the Stockholm Convention Getting ready for COP-4.
INTRODUCTION TO THE MONTREAL PROTOCOL Liana Ghahramanyan NOU of Armenia October 2009 Budapest, Hungary.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Decisions of the 46 th to 48 th Meetings of the Executive Committee A presentation at the Meeting of the Regional Network in Europe and Central Asia Stephan.
United Nations Environment Programme CHINA ECA DIALOGUE ON COOPERATION IN BORDER ENFORCEMENT INCLUDING JOINT TRAINING/CONSULTATION OF CUSTOMS OFFICERS.
RECOMMENDATIONS CONTAINED IN THE “REPORT OF THE EXECUTIVE COMMITTEE ON THE EVALUATION OF CUSTOMS OFFICERS TRAINING AND LICENSING SYSTEM PROJECTS TO THE.
WP8 Project management Milan Gocić University of Niš
PRESENTATION OF MONTENEGRO
Introduction to LDC Strategy
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
EIA approval process, Management plan and Monitoring
Implementation Subprogramme
Institutional Strengthening Support
GEF & UNFCCC Cooperation: COP 17 Action Items
WP1 - Consortium coordination and management
IMPLEMENTATION OF MEAs IN NATIONAL LAW
Roadmap to Enhanced Technical Regulations of WMO
GEF & UNFCCC Cooperation: COP 17 Action Items
Presentation title Adaptation Committee and Least Developed Countries Expert Group Agenda item 5 (c-e) Draft recommendations developed by the Adaptation.
State Environmental Protection Administration
PROGRESS REPORT ON AMENDMENT OF THE NATIONAL YOUTH DEVELOPMENT
Progress in Replacing Halons in Civil Aviation
PRESENTATION TO THE PORTFOLIO COMMITTEE ON TRADE & INDUSTRY Protocol Amending the Marrakesh Agreement establishing the World Trade Organisation (WTO)
Operationalizing Export Certification and Regionalization Programmes
Helene Skikos DG Education and Culture
Momade Saide, Ministery of Planning & Development Hanoi, February 2007
United Nations Voluntary Fund on Disability (UNVFD)
Task Force on Target Setting and Reporting TFTSR
ROLE OF PMU IN CFC PRODUCTION SECTOR PHASE-OUT PROJECT, ODS-III
Presentation title Adaptation Committee and Least Developed Countries Expert Group Agenda item 5 (c-e) Draft recommendations developed by the Adaptation.
NDPHS Work Plan for 2012 NDPHS 8th Partnership Annual Conference
The WTO-Agreement on Trade Facilitation
Roles and Responsibilities
CAP Services and Activities including South-South Cooperation: 2016 Review and 2017 Plan Atul Bagai Senior Regional Coordinator, South Asia Network UNEP,
Overview of Technical and Policy Challenges in meeting 2020 phase-out targets Annual 2017 Network Meeting of National Ozone officers of South Asia Countries.
Legal instruments: PCA or SSFA
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
ODS licensing and annual quota system relationship and differences
Introduction to HPMP.
South Asia Ozone Officers Network Meeting
Surveys on ODS alternatives
Presentation transcript:

Institutional Strengthening (IS) Project

Objectives of IS The main objective of institutional strengthening is to provide necessary resources to an eligible country to enable it to strengthen a mechanism within the country to facilitate expeditious implementation of projects for speedy and effective phase-out of the controlled substances effective liaison between the country and the Executive Committee, the Fund Secretariat, and the Implementing Agencies on the other. (UNEP/OzL.Pro/ExCom/7/30, para. 74.2).

Mandate and Responsibilities (1) (i) the National Ozone Unit (NOU) is given a clear mandate and responsibility to carry out the day-to-day work in order to prepare, coordinate and, where relevant, implement the government's activities to meet its commitments under the Montreal Protocol; this also requires access to decision-makers and enforcement agencies; (ii) the NOU’s position, capacities, and continuity of officers, re sources and lines of command within the authority in charge of ozone issues are such that the National Ozone Unit can carry out its task satisfactorily; (iii) a specified high-level officer or a post within the authority is given overall responsibility for supervising the work of the NOU and ensuring that action taken is adequate to meet commitments under the Protocol; (iv) necessary support structures, such as steering committees or advisory groups are established involving other appropriate authorities, the private sector and non-governmental organizations, etc.;

Mandate and Responsibilities (2) (v) personnel and financial resources and equipment provided by the Multilateral Fund are fully allocated to the task of eliminating ODS consumption and production and are made available to the NOU; (vi) annual work plans for the NOU are prepared and integrated in the authorities' internal planning processes; (vii) a reliable system to collect and monitor data on ozone depleting substances imports, exports and production is established; and (viii) measures taken and problems encountered are reported to the Secretariat and/or the Implementing Agency in charge of the institutional strengthening project when required by the Executive (Decision 30/7)

Excom Decision 61/43(b) on IS Project To maintain funding for overall institutional strengthening (IS) support at current levels, and to renew IS projects for the full two-year period from the 61st Meeting taking into account decisions 59/17 and 59/47(b), which allowed Article 5 Parties to submit their IS projects as stand-alone projects or within their HCFC phase-out management plans, and to review continued IS funding at these levels at the first meeting of the Executive Committee in 2015; and To approve the revised format for IS renewals with the identified objectives and indicators, attached in Annex XII to the present report and to request the implementing and bilateral agencies to use those formats for requests for renewal of IS projects submitted to the 62nd Meeting and onwards.

New Format Reporting on IS progress and requests for renewals was simplified for efficiency; The proposed formats summarize the current reporting requirements into a simplified manner and identify common objectives for each IS projects that countries need to meet; It reflects that the workload of the NOU funded under the IS has changed due to new control measures of the Montreal Protocol.

Excom Decision 74/51 on IS Project (a) To note the review of funding of institutional strengthening (IS) projects prepared in line with decision 61/43(b), as contained in document UNEP/OzL.Pro/ExCom/74/51; (b) To recall and reiterate the decisions adopted by the Executive Committee regarding IS;

Excom Decision 74/51 on IS Project (cont.) (c) To approve all IS projects and renewals at a level 28 per cent higher than the historically agreed level, with a minimum level of IS funding of US $42,500 per year, to continue support for compliance with the Montreal Protocol and to address the challenges related to the phase-out of HCFCs in line with the objectives of decision XIX/6 and the transition to alternatives that minimized environmental impact;

Excom Decision 74/51 on IS Project (cont.) (d) To review IS, including funding levels, at the first Executive Committee meeting in 2020; and (e) To continue to use the existing format for IS renewals as approved at the 61st meeting (decision 61/43(c)) with a modification in section 10, to indicate that performance indicators should be included, as contained in Annex XIX to the present report.

Basic requirements for IS renewal Disbursement rate CP Progress reporting for previous year Timely submission of Terminal Report and Request for Extension of IS Funding

Objective 1: Adoption/implementation of ODS legislation and regulation to control and monitor ODS consumption Introduction of licensing and quota system for HCFCs Enforcement of control measuresto sustain CFC phase out Monitoring illegal ODS trade (all ODS) Ratification of Amendments to the Montreal Protocol

Objective 2: Efficient and timely data collection and reporting Monitoring customs import/export Article 7 data reporting Country programme data reporting

Objective 3: Consultations and coordination with other national agencies/stakeholders Steering Committee Industry associations

Objective 4: Supervision of timely implementation of phase-out activities and reduction in ODS consumption Terminal phase-out management plan implementation HCFC phase-out management plan preparation/implementation Project 1 Project 2

Objective 5: Awareness raising and information exchange Information dissemination to key stakeholders International Ozone Day

International Ozone Day Celebration This is the benchmark activity of NOU in every year. His Excellency the President of Sri Lanka also as Minister grace this occasion as the Distinguished Chief Guest In parallel to IOD celebration, educational, social and industrial activities are carried out. This very popular event among school children, Technical students and Technicians

H.E. President visit Art Exhibition, IOD 2015

H.E. President declared open the First Refrigerant Reclaim Centre at IOD 2015

IOD 2016

Students participation for IOD 2016

.

Objective 6: Regional cooperation and participation to Montreal Protocol meetings Regional network participation Open-ended Working Group / Meeting of the Parties

Budget

SSFA with UNEP SSFA = Small Scale Funding Agreement Usually 4 payment tranches under one phase (2 years) Basic requirements for payments: First payment: Final financial report and terminal report for the previous IS phase; Second/third payment: Interim progress and financial report for the current phase, and at least 80% of the previous payments must have been expended; Final payment: The progress and financial report for the current phase, and 100% of all approved funding have been expended. Other requirements Article 7 data (Ozone Secretariat) CP Progress report (Fund Secretariat) Terminal report and action plan

Thanks