GIS Analysis in Land Management

Slides:



Advertisements
Similar presentations
Snohomish County Parks and Recreation Lord Hill Regional Park Trail Mapping Aaron Bailey Alex Commerer Joe Nguyen.
Advertisements

Hydrological Modeling. Overview Introduction Watershed delineation Automatic delineation Flow length.
LTHIA – Upgrades and Training Bernard A. Engel Tong Zhai Larry Theller Agricultural and Biological Department Purdue University In conjunction.
An integrated hydro-topographic model for Viti Levu Gau Conway Pene 2012 Pacific GIS&RS Conference November 2012, Suva.
Workshop for Watershed Management Using Web-Based Decision Support Tools Bernard A. Engel Jin-Yong Choi.
CEE 795 Water Resources Modeling and GIS Learning Objectives: Perform raster based network delineation from digital elevation models Perform raster based.
Introduction to Cartography GEOG 2016 E
From Topographic Maps to Digital Elevation Models Daniel Sheehan DUE Office of Educational Innovation & Technology Anne Graham MIT Libraries.
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Hydrologic Analysis Francisco Olivera, Ph.D., P.E. Srikanth Koka
Concept Course on Spatial Dr. A.K.M. Saiful Islam Application of GIS in Watershed Analysis Dr. A.K.M. Saiful Islam Institute of Water and Flood.
Cost Path Analysis of Skid Trails Using GIS Laura Heath December 14, 2006 FOR 557.
Flow modeling on grid terrains. DEM Representations TIN Grid Contour lines Sample points.
Advanced GIS Using ESRI ArcGIS 9.3 Arc ToolBox 4 (Spatial Analyst 2)
Remote Sensing and GIS in Water Dr. A.K.M. Saiful Islam Hands on training on surface hydrologic analysis using GIS Dr. A.K.M. Saiful Islam.
From Topographic Maps to Digital Elevation Models Daniel Sheehan IS&T Academic Computing Anne Graham MIT Libraries.
Why calculate slope and Aspect? Study the flow of water Identify the habitats of plants Identify potential sites for urban growth Drainage patterns on.
“Flood monitoring and mapping for Emergency Response in San Antonio-Texas” Part I by Silvana Alcoz Source photo Term.
GIS Tools for Watershed Delineation Public Policy Perspectives Teaching Public Policy in the Earth Sciences April 21, 2006 Gary Coutu Department of Geography.
DEM’s, Watershed and Stream Network Delineation DEM Data Sources Study Area in West Austin with a USGS 30m DEM from a 1:24,000 scale map Eight direction.
1 GIS in Hydrology Watershed management Definitions Algorithms Watershed delineation Automatically delineating watersheds Flow length Raster to vector.
Topographic Maps vs DEM. Topographic Map 1:24,000 Scale 20 ft contour 100 ft contour Stream Center Line.
Digital Elevation Model Based Watershed and Stream Network Delineation Understanding How to use Reading
Regulated Tileline & Ditch flowshed delineation: a comparison study Regulated Tileline & Ditch flowshed delineation: a comparison study Larry Theller,
How do we represent the world in a GIS database?
Creating Watersheds and Stream Networks
Using ArcGIS ModelBuilder for Conservation & Ag Drainage Projects Janell Weiss Nutrient Mgmt. Specialist/Ag Technician Darke Soil & Water Conservation.
DIGITAL ELEVATION MODELING GEOG 421: DR. SHUNFU HU, SIUE Project One Steve Klaas Fall 2013.
Characterization of Hydrological Networks and Surfaces Theory and Tools.
GIS Data Structures How do we represent the world in a GIS database?
Esri UC 2014 | Technical Workshop | Creating Watersheds, Stream Networks and Hydrologically Conditioned DEMS Steve Kopp Dean Djokic.
Processing Elevation Data. Limitations of DEMs for hydro work Dates Static, does not evolve Matching to linear line work due to scale Processing errors.
L7 - Raster Algorithms L7 – Raster Algorithms NGEN06(TEK230) – Algorithms in Geographical Information Systems.
Introduction to GIS. What is GIS? Geographic Information System Geographic implies of or pertaining to the surface of the earth Information implies knowledge.
LOCATION OF THE DAM ON KOSI RIVER USING GIS TECHNIQUES By Anil Kumar Hemant Singh Himanshu kashyap.
Characterization of Watersheds from DEMs using Spatial Analyst/ArcHydro Robert G. Burns, P.G. Engineering Geologist DWR – Division of Safety of Dams Watershed.
Definition In scientific literature there is no universal agreement about the usage of the terms: digital elevation model (DEM) digital terrain model (DTM)
GEOGRAPHICAL INFORMATION SYSTEM
Raster/Map Algebra/Hydrology
Flow field representations for a grid DEM
An Analysis of the Rhône River Basin through Lyon, France
National Hydro Data Programs
Lecture 22: Using ArcToolbox Tools in Python
Watershed Analysis.
Digital Elevation Model Based Watershed and Stream Network Delineation
Geographic Information Systems
Digital Elevation Model Based Watershed and Stream Network Delineation
Problems with Vector Overlay Analysis (esp. Polygon)
Data Sources for GIS in Water Resources by David R
Key Concepts from Exercise 4
Hydro Networks in GIS Network model Flow on Networks
GIS FOR HYDROLOGIC DATA DEVELOPMENT FOR DESIGN OF HIGHWAY DRAINAGE FACILITIES by Francisco Olivera and David Maidment Center for Research in Water Resources.
A Study of the Drainage as Based on an Evaluation of the Irrigated Land in the Flood Plain of the River Moustiques Etude de drainage en vu de la valorisation.
Hydrologic Analysis of the Hyrum Reservoir watershed
Terrain Analysis Using Digital Elevation Models (TauDEM)
Welcome to GIS in Water Resources 2018
Provo River Watershed Modeling with WMS Ryan Murdock.
Digital Elevation Model based Hydrologic Modeling
Chapter 3. GIS Decision Support Methods and Workflow
Hyrum Reservoir and how it applies to Flood Control by Nathan Wright
10. Hydrologic Modeling 10.1 Digital elevation model (DEM)
Vector Geoprocessing.
Data Sources for GIS in Water Resources
Development of a Hydrologic Model for the Wichita Falls District
Creating Watersheds and Stream Networks
Hydrologic modeling of Waller Creek
Chapter 13 Running Water Running water means……….
Geographic Information Systems
Presentation transcript:

GIS Analysis in Land Management Presented by: Jimmy West, The Schneider Corporation

Presentation Overview: Creating Computer Generated Watersheds Use of Drainage Calculation Software to Assess Drainage with Parcels, Watersheds & Soils Layers

Accuracy… Fancy software does not equal accurate data Additional data layers will only be as accurate as basemap Parcels must be maintained and up to date through a known date – almost all GIS layers will refer back to ownership information

Watersheds of the Past?

Software Used to Create Computer Generated Watersheds ESRI – ArcInfo ESRI – Spatial Analyst Tools What is needed?

Data Layer Sources Needed for Computer Generated Watersheds 2’ contours – seamless Linear stream features – seamless and topologically correct 2’ contours – seamless Linear stream features – seamless and topologically correct

Computer Generated Watershed Raster Processes Elevation Raster Flow Direction Raster Flow Accumulation Raster Raster Streams Layer Make grid 2x bigger

Assumptions and Obstacles: …and 3 things to know about drainage Water runs downhill Water drains into streams Obstacles “Sinks” and “Peaks” Culverts

“Fill” Process for Sinks and Peaks

Streams at Culverts

Zoomed Stream Elevation Raster

“Burning” in the Streams

Creation of Computer Generated Watersheds Hydrology Modeling extension is used to “burn in streams” and build watersheds using raster images created from contour data Computer generated watersheds are merged/attributed to match County’s existing tiered administrative watershed system

Computer Generated Watersheds Threshold = 500 Watersheds

Tiered Watershed Layer

Drain Calc Overview Preparing Data For Use in Drain Calc Multiple assessment methodologies One rate per acre assessments Proportional assessments

Tiered Watershed Layer

Watershed/Parcel Overlay

Watershed/Parcel Intersect - Lower

Watershed/Parcel Intersect - Upper

Watershed/Parcel/Soil Intersect

Range of Watershed Assessment Options Flat rate per benefited acre Setting minimum assessment amount(s) Additional assessment options Soils Parcel class/landuse Distance from hydrological features other

Individual Watershed Projects

Defined Watershed Project

Apply Assessment Rule Selections

Soil Type Rule Example

Import Parcel Data

Define Hearing/Notice Report Info

Generate Reports/Notices

Print Assessment Schedule