Presentation is loading. Please wait.

Presentation is loading. Please wait.

Provo River Watershed Modeling with WMS Ryan Murdock.

Similar presentations


Presentation on theme: "Provo River Watershed Modeling with WMS Ryan Murdock."— Presentation transcript:

1 Provo River Watershed Modeling with WMS Ryan Murdock

2 Creation of Hydrologic Model
Import 17 USGS 7.5 minute quads 30m resolution UTM projection Import 250K Digital Raster Graphic (DRG)

3 DEMs and DRG

4 DEM Processing Fill no data cells Smooth DEM
Compute flow directions & flow accumulations Convert raster streams to feature arcs Choose outlet Set accumulation threshold Delineate basin boundaries

5 Flow Accumulations (threshold = 1000)

6 Delineated Basin elevation~ 1200m-3800m

7 More Data USGS gaging stations Land use/land cover data Provo
Vivian Park Heber Land use/land cover data CN extraction

8 Completing the Model Create and study sub-basins
Calibrate flow rates to gaging station records (HEC-1) Input Reservoirs (Deer Creek)

9 Further Analysis Analyze lag time & time of concentration approaches
Robustness of equations Sensitivity to slope, area, and location Try multiple methods on same area Compare results

10 Water Resources Engineers at work


Download ppt "Provo River Watershed Modeling with WMS Ryan Murdock."

Similar presentations


Ads by Google