New Exploration Gas Prospect

Slides:



Advertisements
Similar presentations
OilSim day 2 Today’s Challenges Task 3 yesterday Task 5 Task 4
Advertisements

The Focus of Industry Lecture 1 Exploration Refining Production
Going Beyond Exploration
WATER EVAPORATION: Stage of water cycle when water changes from liquid to vapor (or gas)
PC Based Reservoir Analysis System Allows Quick Decision on E&P Well Plans for Black Widow Prospect J.L. Buchwalter Gemini Solutions, Inc. T.M. Campbell.
Kuwait Gulf Oil Company (K.S.C.) A Subsidiary of Kuwait Petroleum Corporation Enhancing Reservoir Performance and Production Capability of Divided Zone.
IPAA OIL & GAS INVESTMENT SYMPOSIUM APRIL 21, 2004.
DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING.
E. Putra, Y. Fidra and D.S. Schechter
1 Technical and Environmental Challenges for CBM Resource Development in India Deep Industries Limited 3rd India Unconventional Gas Forum Conference (IUGF)
Preliminary Reservoir Model MC252 6-July DRAFT Outline Modelling approach & purpose Input Data & Model −Rock & Fluid Properties −Layering −Aquifer.
Why Developing?  Restore aquifer, following damage due to drilling  Reduce head loss by increasing permeability  Increase well efficiency  Reduce drawdown.
Optimizing In Fill Well Drilling - Wamsutter Field
Converting a supply well into an ASR well: Case Histories Roger Dittus PG – United Water Idaho Inc.
Sedimentology & Stratigraphy:
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
{ Monoco Petroleum, Inc. Houston, Texas USA Texas Gulf Coast Petroleum Project Development Drilling to Produce 2 - 3½ Million Barrels of Oil & Natural.
Workflow for Finding Bypassed Reserves in Mature Assets  Real Time Integration of Simulation, Seismic Interpretation, and Geophysics  Best Answers Possible.
Reservoir Simulation Study
BULLDAWG PROSPECT Liberty County, Texas. HOUSTON, Oct. 5, 2005 PRNewswire-First Call -- Carrizo Oil & Gas, Inc. (Nasdaq: CRZO) announced today that.
RANGE Resources Range Resources Company Presentation | September 30, 2009 | 1 IPAA’s 7th Annual Oil and Gas Investment Symposium Shale Gas Economics RANGE.
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
Wytch Farm Field Development Project
Ground Water Notes. I like science. Water Table The spaces between the grains are filled with air. The spaces between the grains are filled with water.
Res A Performed By Gemini Solutions, Inc. May 2001.
Selection Sort Comparison Data Movement Sorted.
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
Uncertainty in AVO: How can we measure it? Dan Hampson, Brian Russell
Information Retrieval Performance Measurement Using Extrapolated Precision William C. Dimm DESI VI June 8, 2015.
PAWNEE RESERVOIR SIMULATION STUDY Pioneer Natural Resources Co. Performed By Gemini Solutions, Inc. January 2001.
Trends in Energy Conference Gifford Briggs Louisiana Oil & Gas Association.
10/18/20161 Reserves Estimation and Classification.
Petroleum Accounting.
Royce/Cecil Area Summary
Drilling and Production
Date of download: 10/13/2017 Copyright © ASME. All rights reserved.
Date of download: 10/15/2017 Copyright © ASME. All rights reserved.
Date of download: 10/17/2017 Copyright © ASME. All rights reserved.
Date of download: 10/20/2017 Copyright © ASME. All rights reserved.
Competitive Bidding 2010.
Date of download: 10/29/2017 Copyright © ASME. All rights reserved.
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
OPK-3 Mud Gas Analysis Fig. 1 Comparison of d15N nitrogen vs. d13C methane measured on a RFT Gas sample from OPK-3A vs. samples within NAM's concession.
Gerard Mulder Smart Wells Global Implementation Leader,
Date of download: 1/2/2018 Copyright © ASME. All rights reserved.
Date of download: 1/20/2018 Copyright © ASME. All rights reserved.
تخمین مخازن در چاههای اکتشافی
Implementation of Efficient Check-pointing and Restart on CPU - GPU
SPE Horizontal Well Stimulation Workshop
Gas Condensate PVT A worked example to estimate
Introduction Concern: intrusion into confined aquifer in glacial sediments.
Pitchfork Field Study Rochak Karki, Dhruba Panta, Tayyab Parvez, Rebecca Podio and Omair Sadiq.
Top 6 Strategies of Digital Marketing.
Subsea Systems Market report categorizes the global market by Subsea Processing, Subsea Production & Geography.
Oil and Gas E&P Opportunities
Resistivity Logs High deep resistivity means:
Upstream Innovations in Shale Production
تحليل الحساسية Sensitive Analysis.
Solar Cell Fabrication Process Comparison
Historical Review of Dual and Multiple Completions
Gas Field Development Class Example
Training the Sprinter Develop the Relationship Coach Kimberly Rollins
How do we use this information?
Modeling Well Performance in Simulation
Brent Lowry & Jef Caers Stanford University, USA
Depth Imaging unfolds complex geology and impacts Reserves
A Prospect A prospect is a location and depth that has been identified as a good place to drill for oil and/or gas For us to find oil or gas, certain conditions.
Shale Play Development – A New Paradigm
Gas Field Development Class Example
POTENTIAL NEW USES FOR OLD GAS FIELDS: SEQUESTRATION OF CARBON DIOXIDE Paul R. Knox Susan D. Hovorka Bureau of Economic Geology Jackson School of Geosciences.
Presentation transcript:

New Exploration Gas Prospect Simulation Study Investigating: Well arrangements to recover hydrocarbons Production profiles and recovery factors Sensitivity to rock compressibility Sensitivity to target deliverability rate Sensitivity to tubing size – 3.5 versus 4.5

New Exploration Gas Prospect Top of Structure – Sand A

Eugene Island -Thunderbolt Prospect Top of Structure - Sand B

New Exploration Gas Prospect Top of Structure - Sand C

New Exploration Gas Prospect Sand A - 229 BCF

New Exploration Gas Prospect Gas Zone - Sand B, 938 BCF

New Exploration Gas Prospect Gas Zone - Sand C, 642 BCF

Completion Strategy Objectives: Maintain deliverability targets – 300 / 715 mmcf/d cases Produce all fault blocks efficiently Complete largest targets first Only plugback completions Resulting Completion Strategy: 11 wells required 2 wells in Sand A 6 wells in Sand B 3 wells in Sand C 6 wells required at time 0 for 300 mmcf/d case 2 recompletions – A and E both from 21000 to 20000 ft.

Well Completions in Sand A 715 mmcf/d, 4.5 tbg, Cr =15E-6 Well I - 45 BCF Well K – 105 BCF

Well Completions in Sand B Well E – 29 BCF, recompletion 715 mmcf/d, 4.5 tbg, Cr =15E-6 Well E – 29 BCF, recompletion Well H – 150 BCF Well F – 189 BCF Well J – 174 BCF Well B – 123 BCF Well C – 56 BCF Well D – 34 BCF

Well Completions in Sand C 715 mmcf/d, 4.5 tbg, Cr =15E-6 Well E – 86 BCF Well G – 185BCF Well A – 178 BCF

Comparison – low vs. high Crock 715 mmcf/d, 3.5 tbg, Cr =15E-6 and 5E-6

Comparison – 3.5 vs 4.5 tbg 715 mmcf/d, Cr = 5E-6

Conclusions Recoveries between 45-52 % possible Low recoveries for high Crock, 3/1 Aquifer 11 wells for 715 mmcf/d 6 wells followed by 5 drilled wells for 300 mmcf/d 4.5 tubing increases gas recovery for 715 mmcf/d 50 BCF additional reserves vs. 3.5 tubing Tubing size does not increase ultimate recovery or deliverability significantly for 300 mmcf/d case