TGax November 2017 Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Advertisements

Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
IEEE mc Closing Report for March 2015
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
A Proposed Timeline for IEEE ba TG
TGaz Next Generation Positioning Mar Closing Report
TGv Closing Report March 2008
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE aj January 2016 Closing Report
TGs Process, November Date: Authors: November 2007
TGax March 2017 Closing Report
IEEE TGz Vancouver Agenda
TGac Documents and Timeline
TGaf San Francisco Closing Report
TGad September 2010 Closing Report
TGaf Waikoloa Closing Report
TGae Closing Report – January 2010
TGae Closing Report – March 2010
January 2017 doc.: IEEE March 2017
TGax November 2017 Meeting Agenda
IEEE TGmb Sept 2010 Agenda Date: Authors:
TGae Closing Report – May 2010
TGs Montreal Closing Report
IEEE TGaf Waikoloa Closing Report
TGac Status and Timeline
IEEE ah Timeline Projection
TGaf San Francisco Closing Report
TGaf San Antonio Closing Report
802.11bd Timeline Date: Authors: January 2019
TGs Process, November Date: Authors: November 2007
IEEE TGaf Singapore Closing Report
TGmd March 2019 Closing Report
Tgae Closing Report – November 2009
TGs Process, November Date: Authors: November 2007
TGaf Waikoloa Closing Report
QoSMAN SG Closing Report – Nov 2009
TGax January 2017 Meeting Agenda
IEEE TGaf Palm Springs Closing Report
TGad March 2011 Closing Report
TGs Process, September Date: Authors: September 2007
TGba January 2018 Closing Report
September 2009 Closing Report
TGae Closing Report – July 2010
November 2010 Closing Report
TGm Closing Report – May 2010
2019 March TGba Closing Report
Task Group AY September 2017 Closing Report
TGs Process, January Date: Authors: January 2007
TGae Closing Report – July 2011
TGae Closing Report – January 2011
Task Group AY May 2016 Closing Report
TGax March 2017 Meeting Agenda
IEEE TGv November 2010 Agenda
TGax September 2017 Closing Report
TGaf San Antonio Closing Report
IEEE mc Closing Report for September 2015
IEEE mc Closing Report for September 2016
IEEE aj March Closing Report
TGae Closing Report – November 2011
IEEE aj May Closing Report
TGaz Next Generation Positioning Jan Closing Report
TGs Process, March Date: Authors: March 2008 March 2008
TGae Closing Report – September 2010
TGbd Closing Report – Vietnam
Presentation transcript:

TGax November 2017 Closing Report doc.: IEEE 802.11-11/0xxxr0 November 2017 TGax November 2017 Closing Report Date: 2017-11-09 Authors: Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

November 2011 doc.: IEEE 802.11-11/0xxxr0 November 2017 Abstract This document is the closing report for the TGax for the November 2017 session. Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

November 2011 doc.: IEEE 802.11-11/0xxxr0 November 2017 Work Completed The TG almost completed the assignment of comments received on Draft D2.0. A lead is identified for various clauses of the draft. The lead is responsible for coordinating resolutions of relevant CIDs. The TG approved resolutions to 36 CIDs The TG updated its timeline to reflect the outcome of WG LB. A TG motion passed to hold an ad hoc meeting in San Diego during the period January 10-12, 2018. The agenda is available at: https://mentor.ieee.org/802.11/dcn/17/11-17-1546-04-00ax-tgax-november-2017-meeting-agenda.pptx Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

Timeline Old Timeline New Timeline November 2017 May 2014: start of the TG Nov. 2014: First draft of the TG SFD was approved Jan. 2016: proposed TG draft March 2016: Draft D0.1 was approved and CC started November 2016: Draft 1.0 and WG letter ballot LB-225: opened Dec. 1st 2016 and closed January 8th 2017 September 2017: Draft 2.0 and WG letter Ballot LB-230: opened at Oct. 5th 2017 and closed Nov. 4th 2017 May 2018: MDR (Mandatory Document Review) May 2018: Formation of SB pool  Need to change the date November 2018: Sponsor Ballot July 2019: RevCom May 2014: start of the TG Nov. 2014: First draft of the TG SFD was approved Jan. 2016: proposed TG draft March 2016: Draft D0.1 was approved and CC started November 2016: Draft 1.0 and WG letter ballot – Failed (57.77%) LB-225: opened Dec. 1st 2016 and closed January 8th 2017 September 2017: Draft 2.0 and WG letter ballot – Failed (62.84%) LB-230: opened Oct 5th and closed Nov 4th, 2017 May 2018: Draft 3.0 and WG letter Ballot July 2018: MDR (Mandatory Document Review) February 2019: Formation of SB pool May 2019: Sponsor Ballot December 2019: RevCom Osama Aboul-Magd (Huawei Technologies)

January 2018 Goals Continue with comment resolution on draft D2.0. November 2011 doc.: IEEE 802.11-11/0xxxr0 November 2017 January 2018 Goals Continue with comment resolution on draft D2.0. Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

Conference Call Times Nov. 30, Dec. 14, Jan 4 10:00 -1200 ET November 2011 doc.: IEEE 802.11-11/0xxxr0 November 2017 Conference Call Times Nov. 30, Dec. 14, Jan 4 10:00 -1200 ET Dec. 7, 21, Jan 25 20:00 – 22:00 ET Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)