Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGaz Next Generation Positioning Mar Closing Report

Similar presentations


Presentation on theme: "TGaz Next Generation Positioning Mar Closing Report"— Presentation transcript:

1 TGaz Next Generation Positioning Mar. 2016 Closing Report
November 2011 doc.: IEEE /0xxxr0 Mar. 2016 TGaz Next Generation Positioning Mar Closing Report Date: Authors: Jonathan Segev (Intel Corporation) Osama Aboul-Magd (Samsung)

2 November 2011 doc.: IEEE /0xxxr0 Mar. 2016 Abstract This document is the Next Generation Positioning TGaz closing report for the Macau meeting, Mar Jonathan Segev (Intel Corporation) Osama Aboul-Magd (Samsung)

3 July 2015 Mar. 2016 Work Completed Reviewed and approved a working draft Functional Requirement Doc. (FRD). Reviewed and approved the Spec. Frame work document template. Approved a 1st batch for scalability FR. Approved a 2nd batch of 60Ghz FR. Approved additional 3 use cases followed by a document freeze. Agenda: See 11-15/218r5. Jonathan Segev, Intel Corporation Donald Eastlake, Huawei Technologies

4 July 2015 Mar. 2016 Goals for May meeting Continue on Functional Requirement Document development. Approve initial submissions of technical material towards SFD text where FRD is sufficiently mature. Review technical submissions on channel models, proposed technical approaches etc. Call for submission for the FRD and SFD to be issued post this meeting. Jonathan Segev, Intel Corporation Donald Eastlake, Huawei Technologies

5 Teleconference Schedule
July 2015 Mar. 2016 Teleconference Schedule May 4th 10:00AM ET for 1hr. Jonathan Segev, Intel Corporation Donald Eastlake, Huawei Technologies


Download ppt "TGaz Next Generation Positioning Mar Closing Report"

Similar presentations


Ads by Google