PA Supplier Workshop Net Metering September 10, 2019.

Slides:



Advertisements
Similar presentations
Expanded Virtual Net Metering (VNM)
Advertisements

Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
PG&E’s General Market Virtual Net Metering Schedule NEMV
Welcome and Introductions CoServ Presentation & Member Input.
‘Today’s Energy Partner For Tomorrow’s World’ Billing and Bureau.
The Community Renewable Energy Amendment Act of 2013.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
Restructuring BUSINESS PROCESSES IN MAINE. Business Transactions Contracts Metering Usage History Enrollments & Drops Billing, Collections & Payments.
Interconnection of Small Wind & Solar Systems to Distribution Utilities: A Cooperative Perspective Patrick Parke Midwest Energy Hays, KS September 26,
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
BGS-CIEP Rate - Energy Components (Continued)
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
1 UFE Workshop Sponsored by COPS October 19, 2004.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Philippine Feed-In Tariff System Implementation 1.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Distributed Generation Chau Nguyen, Pricing & Sales Support
1 City of Palo Alto Utilities Large Commercial Customer Pilot Demand Response Program Customer Meeting March 8, 2012.
1 The End Of Price Freeze Service (PFS) For Schedule P Customers Presentation To The Maryland Public Service Commission by Wayne Harbaugh March 4, 2002.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
Theft of Energy ElectraLink – 03 August 2016 An Overview of The Theft Risk Assessment Service (TRAS) and Energy Theft Tip Off Service (ETTOS)
SCE Green Rate and Community Renewables Programs 2016.
Smart Grid Tariff Changes
Interpreting HB 3693 Interstate Renewable Energy Council
Solar, according to Click
Eric Hartsfield Director-Customer Assistance
Sunverge Energy – SGIP Overview
Internal/External Sales Rate Development Level III
Kaysville City, UT Electric Rate Study Results
Distributed Generation Task Force
5 Accounting for Merchandising Operations Learning Objectives
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Settlement Timeline Workshop
Distributed Generation Chau Nguyen, Pricing & Sales Support
Narragansett Electric Rate Classes
Supply Chain Logistics: management of the flow of things between the point of origin and the point of consumption to meet requirements of customers or.
ESB Networks AIP Programme
Health Savings Account (HSA) Funding & Invoicing
Accounting, Fifth Edition
Current as of 12/12/2017 RES-BCT.
Internal/External Sales Rate Development Level III
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
PEPCO Energy here Used there
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Net Metering John McComb: P.E.
Customer Dedicated Solar
Royal Mail Group: Publishing Volume Commitment Incentive.
Royal Mail Group: Publishing Volume Commitment Incentive.
Case No UT PNM Workshop Comments
Cash and Cash Management
2016 Attachment O True-Up Customer Meeting August 22, 2017
PA Supplier Workshop January 16, 2019.
Net Metering John McComb: P.E.
Dual Billing Process Flows
Julie Ford-Williams Bureau Chief-Customer Assistance
Mike Mumper & Brian Kick Good afternoon
PA Supplier Webinar March 20, 2019.
Fleet Electrification
Scheme for Growth Pilot
Royal Mail Group: Publishing Volume Commitment Incentive.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Smart Meter Update Oregon Public Utility Commission
Beartooth Electric Cooperative Rate Design Analysis
Presentation transcript:

PA Supplier Workshop Net Metering September 10, 2019

Agenda Overview of Smart Meter Overview of Net Metering Changes Customer Invoicing (Bill Print presentation changes) Settlements Banking EDI Changes (Differences between Delivered and Received) 867s (MU, IU, HU) 810 (Rate Ready) PA Supplier Workshop September 10, 2019 Meeting Name Location • Date

Change Controls The changes we will discuss are being implemented as a result of PA EDEWG Change Controls 150 and 151 Change Control 150 was approved on April 11th, 2019 Change Control 151 was approved on May 9th, 2019 These change controls are part of accommodating Rider D to increase solar usage by PA customers. Rider D encourages customers to use solar and other alternative sources by receiving a larger discount than what they would pay if they didn’t have it. PA Supplier Workshop September 10, 2019

PA Smart Meter Implementation Timeline Completed P P P Automated Billing In Penn Power Interval Data available; Automated Billing Available to all OpCos Filed Plan PLUS Approved P Pilot Voluntary Remote Connect / Disconnect (Penn Power) P Benefits Realization Begins P Initiate Hourly Pricing Billing P Voluntary Remote Connect / Disconnect (All OpCos) P Enable Net Metering Billing Meters 500K ~1.5% Remaining 300K 50K (PP) New Business 120K (PP) Network   Installed Connected Grid Routers 116 Range Extenders 502   Installed Remaining Connected Grid Routers 1,617 Range Extenders 7,131 376 Data as of 8/23/19 Smart Meter Operations Center (SMOC) SMOC Monitoring and Reporting SMOC Set Up Year 2020+ 2017 2016 2018 2019 2013 2015 2014 Solution Validation Phase Penn Power Only Full Scale Deployment Original plan as of June 2014 PA Supplier Workshop September 10, 2019 Smart Meter Stakeholder Meeting Harrisburg, PA | April 18, 2019 4 4

About Net Metering Net Metering is a rate tariff rider available to customers that install renewable generators such as solar, wind, or hydro power. These customers operate the generator in conjunction with usage from the electric company’s electrical system. A meter with bi-directional functionality, such as a smart meter, is required. Bi-directional meters measure: Delivered – Electricity supplied by an electric utility to the customer Received – Electricity produced by a customer-generator and supplied to the electric utility for purchase by either the utility or the customer’s supplier PA Supplier Workshop September 10, 2019

Net Metering | What is it? Per PA Act 213 of 2004 – Alternative Energy Portfolio Standards Act… Net Metering is measuring the difference between electricity supplied by an electric utility, and electricity generated by a customer- generator …when any portion of the electricity generated by the alternative energy generating system is used to offset part or all of the customer- generator’s requirements for electricity. Buy from Grid = Utility ‘Delivered’ kWh Sell to the Grid = Utility ‘Received’ kWh Net = ‘Delivered’ minus ‘Received’ PA Supplier Workshop September 10, 2019 SMIP All Hands - March 7, 2018

Utility is required to offer Net Metering Rider per statute Net Metering | PA Utility Tariff Perspective, Rider D – Net Metering Rider Utility is required to offer Net Metering Rider per statute PURPOSE Applicable to Customers with installed renewable customer-owned generation APPLICABILITY Rider available to Residential as well as Commercial & Industrial Rates Generation capacity of not greater than 50 kilowatts for residential service or not greater than 3,000 kilowatts at other customer service locations Customer facility shall be equipped with a single bi-directional meter that can measure and record the flow of electricity in both directions BILLING PROVISIONS The customer-generator will receive a credit for each kilowatt-hour received up to the total amount of electricity delivered to the Customer during the billing period If the Company delivers more kWh than received from the customer-generator facility during the billing period, the resultant bill for a full service customer is as if the billing determinant was based on the NET kWh consumption, the generation value of received kWh being ‘full retail value’ PA Supplier Workshop September 10, 2019 SMIP All Hands - March 7, 2018

With Sunshine over an hour… Net Metering Example 1 Solar Power Example 2.50kWh 5.00kWh With Sunshine over an hour… Example: Customer usage is 2.50 kWh while solar generation is 5.00 kWh. Utility ‘Delivered’ = EDI 867 REF*6W*1 will portray 0 kWh Utility ‘Received’ = EDI 867 REF*6W*2 will portray 2.50 kWh Excess = 2.50 kWh PA Supplier Workshop September 10, 2019

With limited Sunshine over an hour… Net Metering Example 2 Solar Power Example 2.50kWh 1.50kWh 1.00kWh With limited Sunshine over an hour… Example: Customer usage is 2.50kWh while solar generation is 1.00kWh. Utility ‘Delivered’ = EDI 867 REF*6W*1 will portray 1.50 kWh Utility ‘Received’ = EDI 867 REF*6W*2 will portray 0.00 kWh Excess = 0.00 kWh PA Supplier Workshop September 10, 2019

Changes in Net Metered Invoicing Net of delivered and received kWh used for billing Old Method New Method Bill based on delivered kWh Credit based on received kWh up to the delivered kWh value Example Delivered = 350 kWh Received = 200 kWh Net Delivered = 150 kWh *150 kWh is used for ALL billing determinants Example Delivered = 350 kWh Received = 200 kWh *Customer billed for 350 kWh (delivered) and receives a credit on 200 kWh (received) For full service customers, the purchase power credit for the 200kWh is such that the resultant total bill is the same as if net kWh were used as the billing determinant For shopping customers, rate ready supply charges are now based on delivered kwh versus net; any generation credit for the received kwh are the responsibility of the supplier; utility provides credit on distribution PA Supplier Workshop September 10, 2019

Net Metering | Changes in Settlement Smart Meter Interval Metering vs Monthly Metering Smart meters enable all accounts to be hourly metered accounts and settlement with PJM becomes more accurate of physical flow for customers on Rider D Settlements provides actual hourly data to PJM for reconciliation of scheduled vs actual hourly energy consumption AND production Previously, the NET kWh used for billing determinant in retail billing was simply ‘profiled’ to an hourly schedule using applicable class profiles With this change, actual hourly usage for ‘delivered’ kWh will be reported as consumption, while actual hourly generation ‘received’ will be reported in a second schedule as production For a full service customer, this production is reported against the POLR schedule For a shopping customer, this production is reported for the load serving entity PA Supplier Workshop September 10, 2019 SMIP All Hands - March 7, 2018

Net Metering | Banking Mechanism The customer-generator will receive a credit for each kilowatt-hour received UP TO the total amount of electricity delivered to the Customer during the service period For service periods where received kWh exceeds delivered kWh, the excess will be banked for use in the next billing cycle If a non-hourly default customer, the valuation of this banked kWh in the next billing cycle is full retail value as billed in that next cycle If an hourly priced default customer, the excess if valued at the hourly prices in which is was produced and a dollar value is assigned upon ‘deposit’ and used for credit in the next billing cycle The bank is trued up annually or at any time status changes in shopping, at which time any balance is a true up credit and the bank value is reset to zero PA Supplier Workshop September 10, 2019

Changes in Net Metered Invoicing KWH Out is now Kilowatt Hours Delivered KWH Metered is now Kilowatt Hours Received PA Supplier Workshop September 10, 2019

Net Metering Credits Credit Calculation The Net Metering Credit is the excess kilowatt hours received up to the delivered kWh value Banked Usage Info Banked usage is now shown on the invoice Delivered usage is now used as the billing determinant, while received usage has a separate line item for the credit. Recall, for shopping customers, the Net Metering Credit is a discount on the distribution portion only and does not include any crediting for generation. PA Supplier Workshop September 10, 2019

Net Meter 867 Customer generates LESS than delivered consumption PA Supplier Workshop September 10, 2019

Net Meter 867 Customer generates MORE than delivered consumption The supplier will receive the credit for their customer's excess generation via their PJM bill and is responsible for providing that credit back to their customer. PA Supplier Workshop September 10, 2019

Net Meter 810 (Rate Ready) Rate Ready 810 charges will be calculated based on: Delivered kWh usage Rate Ready 810 will not be calculated based on: Net kWh usage The EDI SAC*C line will show delivered kWh: PA Supplier Workshop September 10, 2019

Net Meter 867 IU Delivered Received PA Supplier Workshop September 10, 2019

Net Meter 867 HU Delivered Received Other units of measure will NOT be affected, such as K1 or K2 PA Supplier Workshop September 10, 2019

Process 867 MU Net metered customer that bills after 8/16/19 PTD*SU loop will have the new changes with the REF*6W lines in the PTD*PM loops to report Delivered & Received usage PTD*BB loop will report the Delivered usage instead of net usage as approved in Change Control 150 Net metered customer that bills service period start date prior to 8/16/19 the utility will continue to bill on “net” for any customer that has a bill period with a service period start date prior to 8/16/19 Rate Ready will bill on net until the first cycle with a service period start date commencing 8/16/19 Bill Ready / Dual Bill will have the 867 changes applied and the EGS needs to bill as appropriate 867 IU Changes will take place on any bill with a service period start date commencing 8/16/19 (First cycle to be billed with a service period start commencing 8/16/19 is expected on or after 9/18/19) 867 HU Any request sent after 8/16/19: PTD*SU loops will have the new changes for kWh with the REF*6W lines to report the delivered and received usage instead of net usage as approved in Change Control 151 867 HIU Changes will not take place until the customer has 12 months of bill certified interval data Changes will not take place for a customer that moves into a bill certified premise that only has interval meter data available PA Supplier Workshop September 10, 2019

Questions ? ? ? ? ? PA Supplier Workshop September 10, 2019

Questions – with Responses Can FirstEnergy send sample files for EDI 867? Yes, please contact Ernie Mathie to request sample files. Can EDI sample files be requested via the supplier support e-mail? You may use the contact us form on our Supplier Services website. Will EDI samples be in the format of production or testing? Samples will be a text file. All the intervals will be in the same transaction when the change occurs. Regarding EDI 867 MU on slide 20, have these changes already occurred? The EDI 867 MU changes are seen now for customers who billed after 08/16/2019. The slide also details other changes per EDI 867 type. Will the presentation be available? Yes, we will send the presentation as soon as we can, with an appendix of Q&A. We will also post to website. Will the minimum individual customer capacity be zero kwh? Yes. PA Supplier Workshop January 16, 2019