Presented by Michael Nagel

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Current status Arkadiy Klebaner November 21, 2012
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
The integration of 420 m detectors into the LHC
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Installation of the T600 at Fermilab CSN2, September 22,
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Overview of the ESS Linac Cryogenic Distribution System
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
SIS 100 Vacuum chamber Recooler String system Components
Final Design Cryogenic and mechanical configurations
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
LARP Vertical Test Facility
Aachen Status Report: CO2 Cooling for the CMS Tracker
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
Block 4 and Cluster D - Safety
Recirculating CO2 System
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
On the accuracy of port assembly at Wendelstein 7-X
Aachen Status Report: CO2 Cooling for the CMS Tracker
ILC Experimental Hall Cryogenics An Overview
Cryogenic System Commissioning Summary Report
ESS elliptical cryomodule
ESR2 Process Cycle Design
Cryogenics – The Basics
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Presentation transcript:

Concept for the cryo distribution for the Wendelstein 7-X cryo vacuum pumps Presented by Michael Nagel M. Ihrke, M. Pietsch, H.-S. Bosch, C.P. Dhard and Th. Rummel Max-Planck-Institut für Plasmaphysik Wendelsteinstraße 1, 17491 Greifswald, Germany 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

September 3-7 2018 Oxford, England 0. Contents Introduction (W7-X cryostat, cryo plant) Layout of the cryo distribution (transfer lines, valve box, cryo pump) Functional requirements Results (pressure drop, temperature rise) Summary My talk is structured as follows: First, I give a short overview of the W7-X cryostat and the cryo plant used for the cooling of the magnets. Then I show our concept for the cryo distribution consisting of transfer lines, a valve box and the cryo pumps. I,ll give details on the functional requirements of the distribution system. Then I’ll present the calculation results for pressure drop and temperature rise for the helium and nitrogen circuits. A short summary will close my talk. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

September 3-7 2018 Oxford, England 1. Introduction 20 planar coils nominal current of 16 kA at 4 K 50 non-planar coils nominal current 17.6 kA at 4 K 7 electrical circuits 5 non-planar coil circuits 2 planar coil circuits with 10 coils each in serial Machine base The W7-X cryostat has roughly the shape of a donut. In the core of the outer ring is the hot plasma. It is located inside the vacuum vessel also called plasma vessel. 70 superconducting coils are stringed over the plasma vessel. The coils create the magnetic cage that keeps the hot plasma in position. The coils are mechanically fixed at massive support structure located inboard. The complete magnet system is inside an evacuated cryostat to minimize the heat loads on the coils. The 70 coils are electrically connected in 7 circuits, 5 circuits for the non planar 2 circuits for the planar coils. So 10 coils are connected in serial. The magnetic field energy is 620 MJ. The magnetic peak field at the conductor is 6.7 T. The field on the plasma axis is 3 T. Characteristic values magnetic field energy: 620 MJ magnetic peak field: 6.7 T (on plasma axis 3 T) Plasma vessel Coil support structure Plasma 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

September 3-7 2018 Oxford, England 1. Introduction View on W7-X cryostat Experimental campaigns in 2016, 2017, 2018 Further completion with 10 actively cooled divertors 10 cryo vacuum pumps to be installed inside the plasma vessel Slide 3 shows a view on the W7-X cryostat inside the Torus hall. Ports and supply systems mainly occupy the surface of the cryostat. A staircase makes the access to the center of the cryostat possible. We had 2 experimental campaigns in 2016, 17. After the campaign in 2018, which will end in October W7-X will be further completed. 10 actively cooled divertors will be installed. The divertors will be mounted inside the plasma vessel at the PV-wall and protect the areas with higher heat loads. The cryo vacuum pumps sit behind the target modules, which are part of the divertor. Particles that are pumped have to pass the pumping gap, then the RT-chevron and finally the N2 chevron bevor they are frozen on the He-panels. The chevrons are used to reduce the thermal radiation and the micro wave stray radiation on the He-panels. Cross section of plasma vessel with target module of the divertor and cryo pump. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

September 3-7 2018 Oxford, England 1. Introduction No. Device 7 kW Refrigerator power at 4.5 K 2 Screw compressors 1.6 MW electrical power 3 Pressure levels 1.1; 3-4;11-17 bar 1 Oil removal system Dryers 7 Turbines in cold box Phase separator Sub coolers with cold compressors 4 Cold circulators LHe - dewar 5 Different consumers Layout of cryo plant Screw compressor Coalescer + adsorber dryer Cold box The slide gives an overview of the cryo plant. The refrigerator has a cooling power of 7 kW at 4.5 K. 2 screw compressors are used to compress the helium from 1.1 bar to the medium pressure of 3 bar and then from 3 bar to high pressure of 14 bars. After oil separator and gas cooler the remaining oil is taken out of the helium flow with three coalesces and a charcoal adsorber. Two dryers with silica gel filling remove the remaining water out of the helium flow. Seven turbines in the cold box produce the cooling power. One phase separator and two sub atmospheric baths are located inside the sub cooler box. 4 cold circulators pump the helium trough the heat exchangers in the baths and through the cooling circuits. The refrigerator supplies five consumers (coils, supports structures, thermal shield, current leads, cryo pumps.). Cold box LHe- dewar Cold pump 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

2. Layout of the cryo distribution Conceptual layout for the helium cooling circuit 1 common flow from SCB to valve box splitting the flow within valve box 10 short transfer lines run into plasma vessel to the 10 CVP parallel cooling schema almost same schema for LN2 The conceptual layout for the helium circuit us shown in slide 5. A common transfer lines runs from the sub cooler box to the valve box in the torus hall below the cryostat. Inside the box, the flow is split into 10 cooling circuits. Each circuit supplies one cryo pump. 10 short transfer lines run from the box to the cryostat interface. From the interface, the pipes are routed through ports inside the plasma vessel to the individual CVP. Safety valves and rupture discs are connected with a warm gas storage tank. The schema is almost the same for the LN2-circuit. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

2. Layout of the cryo distribution Common TL from SCB to valve box Multi channel transfer line Ø323.9 mm 2 helium + 2 LN2 process pipes (Ø48 mm) Supports made of G10 Thermal shield, actively cooled MLI wrapped around process pipes MLI between vacuum jacket an shield Special mounting procedure: Assembly starts in area of the CVB CTL segment to be lifted up to the ceiling of the floor Aligned and then partially stringed into the narrow pipe channel Next segment is lifted, aligned and welded to the previous segment. Group of segments are stringed further into the narrow pipe channel. Process is repeated seven times Space restriction limits the maximum length of the segments to 4.6 m. The next slide shows a CAD-drawing of the area below the torus with the valve box, the common transfer line plotted in orange and the surrounding piping. The common transfer line is a multi channel transfer line with an OD of 324 mm. Inside there are 2 helium process pipes and 2 LN2 process pipes with an OD of 48 mm each. The pipes are fixed with supports made of glass fiber reinforced plastic. The pipes are enclosed by an actively cooled thermal shield. Multi-layer insulation is wrapped around the process piping. There is also MLI between the vacuum jacket and the thermal shield. A special mounting procedure is needed because of the crowded environment. The assembly starts in area of the CVB. The TL segment is lifted up to the ceiling of the floor, is then aligned and partially stringed into the narrow pipe channel. The next segment is lifted, aligned and welded to the previous segment. The group of segments are stringed further into the narrow pipe channel. The process is to be repeated seven times. Space restriction limits the maximum length of the segments to 4.6 m. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

2. Layout of the cryo distribution Short TL from valve box to port Interface 10 short TL’s run through torus center Support structures and diagnostics need to be circumvent Three dimensional routing required Multi channel transfer line (same concept as CTL) Vacuum jacket: Ø159 mm regular case, Ø219 mm at special locations only thermal shrinkage of process pipes Risk caused by loss of vacuum minimized separate vacuum for each transfer line Shrinkage of vacuum jacket when a process pipe breaks  Lateral and axial bellows, flexible hoses 10 short TL run from the VB through the center of the torus to the ports of the W7-X cryostat. 5 ports are placed at the lower side, 5 at the upper side of the cryostat. The place in the center is already filled with support structures and diagnostics. So the process pipes need to circumvent these components resulting in a three dimensional pipe routing. These TL are multi-channel transfer lines as well and have the same basic design concept as common TL. The vacuum jacket has an OD of 159 mm in the regular case. At special locations, a diameter of 219 mm is allowed to give space for lateral or radial compensators. The thermal shrinkage of process pipes has to be considered in the design. The risk caused by loss of vacuum in a TL needs to be minimized. Therefore, each transfer line has a separate vacuum. In addition, the shrinkage of vacuum jacket needs to be considered in case a process pipe breaks. Lateral and axial bellows are used to compensate the shrinkage of the TL jacket. Flexible hoses are allowed for the process pipes. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

2. Layout of the cryo distribution feed flow is distributed to 10 parallel cooling circuits return flows are collected in return header pressure and pressure drop between in- and outlet 1 temperature sensor in the common inlet line 10 temp. sensors in the parallel return lines 1 control valve + 1 flow measurement in each feed line bypass between feed and return header electrical heater inside the box safety valve, rupture disks. non-return flaps nitrogen circuit is almost a copy Valve Box The next silde shows the concept for the valve box. The feed flow is distributed to 10 parallel cooling circuits. The return flows are collected in the return header. The pressure in the process pipe is measured at the inlet and the pressure drop is measured between in- and outlet. 1 temperature sensor is placed in the common inlet line. 10 temp. sensors are installed in the parallel return lines. There are 1 control valve and 1 flow measurement in each feed line. A bypass between feed and return header allows to disconnect the cryostat without stopping the flow coming from the cryo plant. An electrical heater inside the box can simulate the heat load on the helium flow in the CP. Safety valves and rupture disc will open and guide the flow to a warm gas storage tank in case of vacuum loss in the plasma vessel or in the vacuum jackets of the TL. Non-return flaps in the process pipes and in the safety lines help to stabilize the flow. The nitrogen circuit is almost a copy of the helium circuit. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

2. Layout of the cryo distribution valve box The next slide shows a CAD drawing of the VB below the torus. The VB is marked with the red circle. TLs and actuators for the cryo valves are placed on the base plate of the box. On the left-hand side is the valve box for the coil cooling circuits. The P&I-Diagram for the VB is shown on the right giving more details than the previous simplified schema. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

2. Layout of the cryo distribution View on cryo vacuum pump water baffle Flow path to the CVP process pipes routed through port into the plasma vessel and connected to 10 CVP’s. process pipes Ø12x1 overall length of piping 15.8 m cooling of panels with helium at 3.9 K, 45 W per CVP baffle and box cooled with LN2 at 80K 600 W / 1.2 kW per CVP parallel cooling schema (He, LN2) LN2-baffle gas flow A picture of the CP is shown on the left side. Gas that is pumped has to pass first the water cooled and then the liquid nitrogen cooled baffle. Behind the nitrogen baffle the gas is frozen on the He-panels (mostly hydrogen). The process pipes for the CVP cooling run through port into the plasma vessel and are connected to 10 CVP’s. The piping has a diameter 12 mm. The overall length of the piping is 15.8 m.   The cooling of panels is done with helium at 3.9 K. The load on a single CVP is estimated to 45 W. The LN2-baffle and the box are cooled with LN2 at 80K The expected heat load on the shield is 600 W in the beginning. Later when longer plasma pulses are operated up to 30 minutes, the load will increase to 1.2 kW per CVP. A parallel cooling schema is used for the He and LN2 circuits. Ehrke G at al., Design and manufacturing of the Wendelstein 7-X cryo-vacuum pump, 2018 Proc. of the Symp. on Fusion Technology, September 16-21, Naxos (Italy) 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

3. Functional requirements Functional requirements for the transfer lines and CVB CTL STL CVB CVP Heat load on He line ≤ 0.2 W/m ≤ 0.35 W/m ≤ 30 W (total) ≤ 45 W LN2-line ≤ 0.5 W/m ≤ 1.0 W/m ≤ 150 W (total) ≤ 600 / 1200 W Pressure drop He, 250 g/s ≤ 3.2 kPa ≤ 2.2 kPa ≤ 2.5 kPa ≤ 40 kPa LN2, 68 g/s ≤ 1.0 kPa ≤ 5.0 kPa ≤ 5.5 kPa ≤ 100 kPa Helium lines 165 W 10 CVP 450 W Pressure drop limited by cold circulator 60 kPa 2-phase cooling for LN2 Return flow has a mass vapor fraction of about 90% LN2 mass flow defined by heat load (68 g/s) The functional requirements for the TL and the VB are plotted for the helium circuits on the slide. The allowed heat load on the common TL is 0.2 W/m and 0.35 W/m for the short TL. The harder space requirements for the short TL are the reason why the higher values are allowed. The sum of the loads for the valve box is specified with 30 W. The value for the CP is also given. Altogether, the load on the TL + CVB are 165 W and 450 W on the CVP. The limits for the pressure drop in the different circuits are printed below. The cold circulator limits the maximum allowed pressure drop to 600 mbar for the helium circuits.   The corresponding numbers are printed for the nitrogen circuit. Here as well the accepted loads for the short TL are higher than for the common TL. The heat on the CVP mainly dominates the loads. 2-phase flow is foreseen for the cooling. The return flow should have a vapor fraction of about 90% to avoid overheating of the gas phase. The heat load defines the minimum mass flow rate of 68 g/s. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

Pressure drop and temperature rise for helium circuit 4. Results Pressure drop and temperature rise for helium circuit Calculated pressure along the flow path (feed + return) Only values at inlet/outlet of components are plotted. Steady state compressible flow calculation Pressure drop caused by pipe friction, pipe bows, valves, and density change due to pressure drop and heat loads CTL = common transfer line CVB = valve box STL = short transfer line CVP = cryo vacuum pump temperature pressure The calculated pressure drop (blue line) and the temperature rise (red line) along the flow path are shown in the slide for the helium circuits. The horizontal axis gives the flow path position. The left vertical axis shows the pressure and the right axis the temperature values. Only the values at inlet/outlet of components are plotted, therefore the straight lines. The calculation is done for steady state condition for compressible fluids. The pressure drop calculation takes into account pipe friction, pipe bows, losses in valves, and density change due to pressure drop and heat loads. The mass flow rate is 250 g/s with an inlet temperature of 3.9 K. The pressure drop is 420 mbar and the temperature rise is 0.65 K. The biggest contribution on pressure drop and heat loads causes the CVP. 250 g/s, 515 W  Δp = 42 kPa, ΔT = 0.65K 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

Pressure drop and temperature rise for nitrogen circuit 4. Results 2-phase flow, 68 g/s, 1200 W per CVP  Δp = 54 kPa Feed flow calculated as liquid, return flow as gas phase (conservative assumption) Alternative option: Cooling with liquid nitrogen Cold circulator 600 g/s  Δp = 50 kPa, ΔT = 10 K CTL = common transfer line CVB = valve box STL = short transfer line, CVP = cryo vacuum pump Pressure drop and temperature rise for nitrogen circuit Pressure, subcooled flow temperature Pressure, 2-phase flow Pressure drop and temperature rise are plotted for the nitrogen cooling circuit. In the calculation, the feed flow is treated as liquid and the return flow as gas which is a conservative assumption. The 2-phase cooling condition requires a mass flow rate of 68 g/s considering the heat load of 1.2 kW per CVP. The resulting pressure drop is Δp = 540 mbar.   An alternative cooling option is the cooling with subcooled nitrogen. A cold circulator pumps then 600 g/s of liquid through a heat exchanger that is immersed in a nitrogen bath, and then through the cooling circuits. The temperature rises by 10 K. The return pressure should be above 4 bar to avoid 2-phase flow condition. The pressure drop over the circuit is 500 mbar. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England

September 3-7 2018 Oxford, England 5. Summary 10 cryo vacuum pumps will be installed Cryo distribution with multi channel transfer lines Pipe routing for transfer line from cryo plant to cryo valve box Pipe routing for 10 parallel lines from valve box to the CVP Panels are cooled with 250 g/s helium flow at 3.9 K Shield and baffle cooling with LN2 (68 g/s, 12 kW) After the experimental campaign in 2018, the Wendelstein 7-X stellarator will be completed with 10 actively cooled divertor units. In addition, 10 cryo vacuum pumps (CVP) will be installed behind the divertor. The CVP is cooled with super critical helium and liquid nitrogen. A multi-channel transfer line connects the subcooler box of the cryo plant with the dedicated valve box in the torus hall. 10 short transfer lines supply the 10 CVP’s in a parallel cooling schema. The helium panels are cooled with a flow of 250 g/s at 3.9 K. Shield and baffle are cooled with liquid nitrogen with a flow of 68 g/s. Pipe routings and pipes diameters are defined. The conceptl fulfills the requirements. 28.10.2019 ICEC 27- ICMC 2018 September 3-7 2018 Oxford, England