ACEC Designer Training

Slides:



Advertisements
Similar presentations
The Website Its Magical May How to Use the Cool Cities Website.
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Document Design Principles WritePoint Ltd.
Things to look for and remember while preparing FD05 Estimates.
© 2011 Autodesk CI4073: Wholly Sheets Batman! Plotting in AutoCAD® Civil 3D Seth Cohen CAD Management Resources Inc. CAD Applications Specialist Autodesk.
Construction Documents COMMUNICATION OF A DESIGN.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Mapping. Required readings: 18-1 to &18-12&18- 14, and Required figures: 18-2, 18-5, 18-6, 18-7, 18-8, 18-10, and
How to Export Question Bank. Step 1: Select Export Question Bank Over here!!!
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
Create Mailing Labels (Word 2007) Word 2007 using the Mail Merge function and an Excel spreadsheet Create mailing labels from Member Rosters in.
Digital Measures Chair Training College of Education.
ELECTRONIC DESIGN DATA MANAGEMENT. Directory Structure (GEOPAK Road Manual Chapters 1 & 2) MicroStation/GEOPAK files are stored in the t drive under t:\de-proj\county_designation\jobnumber.
Automated OUTLAY REPORT. The is an Excel spreadsheet which is used to track all funds related to the project, from beginning to end.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
Basic Cartography The Finishing Components Are we done yet? – We have an excellent representation of a cave now But it doesn’t look finished – it still.
Good Morning!! Please grab a laptop from the cart. Be careful, they are all plugged in at the back. Sign on get to my school wires site. Take out your.
Allen Hughes State Materials Office
Things to look for and remember while preparing FD05 Estimates.
Dr. Catherine Turner Assembly drawings.
Introduction to ArcGIS for Environmental Scientists Module 1 – Data Visualization Chapter 4 - Layouts.
Building a Better 3D Model And Interrogating it for a Better Design Kevin Martin, KYTC Jason Littleton, AEI.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
CM-220 Unit 1 Seminar Margaret Baker. Seminar Rules Try to be on time. Be respectful. We will have many people attending, so stay on task. If you enter.
Q: How do I view and upload a document? First, Login to NTREIS Transactions First, Login to NTREIS Transactions.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
OUTREACH TRAINERS Class Records Requirements. Outreach Trainer Requirements It is important to familiarize yourself with the complete Outreach Training.
2010 Construction Contract Standards Training Part 2 Prototype October 2011.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
In your project you first said that the page name will be forums and when we installed vbulletin we made a folder name forum.That is soccermm.com/forum.
Residential Construction Drawings
Survey Please complete the following survey before we start. I will share my Google folder with you when we are done.
Step-by-step Demo
Guide To Reconcile Sales Tax Updated September 2014
REAL ESTATE PROFESSIONALS
Architectural Drafting
Cartography and Labeling
Traffic Control Plan Development Course
Using Excel with Google Maps
Completing the State Aid Payment Request
Unit 7 – Excel Graphs.
For a new user you must click on the “Registration for Generator” link
Administrator of Construction Todd Wilson Senior Project Manager
Overcoming project blockers in financial institutions
Name of your training course
Virginia Department for the Aging
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
CCP New Admission to Elwyn
PLAN PREPARATION BASICS GENERAL LAYOUT
2020 Census Local Update of Census Addresses Operation (LUCA)
Please add the technical content of your presentation
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
PLAN PREPARATION BASICS STATEMENT OF ESTIMATED QUANTITIES (SEQ)
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
Lecture 5: Writing Page
CSE 231 Section *** Teaching Assistant: YOUR NAME
Drawing of Sufficient Detail (DOSD)
ESTIMATE TAKE-OFF & RELATED MATH WORKSHOP - Part 2
Guide To Reconcile Sales Tax Updated June 2019
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
Project Manager / Utility Liaison
Constructability Rick Kruchten, Senior Project Manager
ACEC Designer Training
Introduction – Hi, firstly I wanted to make sure that everyone has their phone on mute while I review the 3 steps in uploading the contract, and then I’ll.
Week #3 – Excel and Retirement
Presentation transcript:

ACEC Designer Training Consistency of Plans Good Morning Everyone, For those who don’t know me I am Hector Mendoza Sr. PM for DPW Design. My Segment is about Consistency of Plans.

Plan Sets Title Page Utility/Legend/Index General Notes Schedule of Quantities by Street (Spreadsheet) Typical Sections Pavement Core Report Curb Ramp Details with Elevations Plan Sheet Drafting Standards on City Website

Title Page Title Page: a couple of things. -Location Map: show only Project Location, it will be a lot easier to read at a glance, Less is more. Indiana 811 logo show be on every sheet.

Index Page Legend: Show all symbols and Callouts that are used in the set of plans. Index: Make sure all Sheet Name and Sheet Numbers are matching the plans. Since Utility Personnel is always changing, Please make sure your contact information is up-to-date

General Notes The General Notes are DPW standards, however if you need to be added other notes for your project, please let your DPW PM know.

Schedule of Quantities Quantity Breakdown per street segment designed. Include Pay Items numbers as shown here. Speaking of Pay Items, make sure all DPW Pay items have Technical Spec. are included in the Contract Book. Just a quick note on Approach Milling, Quantifying/Labeling: (If Mainline, Approaches are not paid as approach.

Typical Sections Typical Cross Section should be in fact “Typical”, (*) notes underneath section denoting a casual changes between cross section. It’s difficult to follow without any notes.

Pavement Core Report Cores and Cores Report will be added to the plan set and not to the Contract Book. Contractor and RPR will have plans set before they will have the Contact Book.

Curb Ramp Details Show Spot Elevation and Slope on all Curb Ramp Details, also include quantities for the follow items: Concrete, Sidewalk, Detectable Warnings, Curb and Gutter. Detectable Warning should be shown in the proper location also shown tyned Grooves. More correct information shown on the details, the less question we will have from the contractor. Hopefully!

Plan Sheet Consistency of Plan between the Prime and Subs: Legend should be on every sheet and only what’s pertain to that sheet. Show address for all properties, Plan Sheet are to true scale at 11x17, Full at 22x34. Few things that need to be on every sheet, North Arrow, stationing alignment, hatching, begin and end stationing. All shading and text size should be the same from the Prime to the Sub’s set of plans. The only things that are different are Company Logo and Engineers seal.

Design Standards Sheets DPW/City of Indianapolis/Marion County Design Standards June 2019 https://www.indy.gov/activity/public-works-specifications-and-manuals Pre-Construction Drafting Standards (AutoCAD and MicroStation) Plan Sheet Standards Sample (PDF) MicroStation Digital Plan Sheets (DGN) AutoCAD Digital Plan Sheets (DWG) AutoCAD Xref Files: Excel files, Logos, and Pen Table Just a quick note. When all said in done, the plans and contract book are a legal document and they are out there with your signed seal. Please take the time and QC the plans, talking from personal experience I had projects that were miss calculation on elevation on a profile, wrong quantities or even totally missed a major pay item those issue has cost the City money. Again QC! QC! Thank you