Material Requirement Planning (MRP)

Slides:



Advertisements
Similar presentations
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Advertisements

1 Unit 4B - Logics and Calculation of Material Requirement Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
0 © 2009 Wellesley Information Services. All rights reserved. Implement SAP ERP Consumption-Based Planning Functionality for Your Non-Critical Production.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Material Requirements Planning (MRP)
MRP, MRP II, and ERP.
Material Requirement Planning (MRP)
Material Requirements Planning
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Operations Management Material Requirements Planning
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 15 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Chapter 15 Resource Requirements Planning: MRP and CRP.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Resource Planning Chapter 15.
Manufacturing Systems Engineering
BUAD306 MRP.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Material Requirements Planning (MRP)
Material Requirements Planning
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
Production Contents: Maintaining bills of material (BOM)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Concepts in Enterprise Resource Planning Third Edition
FDFPLSCP4A Manage and schedule production
Material Requirements Planning (MRP)
MRP: Material Resource Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
Materials Requirements Planning
merchandising operations
BUAD306 MRP/ERP.
Production Contents: Maintaining bills of material物料清單(BOM)
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Forecasting and MRP: Setup & Configuration
Chapter 16 Materials Requirements Planning
MRP and ERP.
12 Inventory Management PowerPoint presentation to accompany
Introduction to Materials Management
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
Material Requirements Planning (MRP)
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Chapter 11 The Accounting Information System
Resource Planning Chapter 16
Chapter 14 Dependent Demand
Inputs and Outputs to Aggregate Production Planning
Master Production Scheduling (MPS)
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Material Requirement Planning (MRP) Today we will discuss what Material Requirements Planning is and how we can use it in our organization. VARUN BABU

Contributors to MRP Joseph Orlicky George Plossl Oliver Wight American Production and Inventory Control Society Material Requirements Planning was introduced in the 1970’s. Much of the credit goes to three individuals by the names of Joseph Orlicky, George Plossl, and Oliver Wight. The American Production and Inventory Control Society (APICS), which was endorsed by Orlicky, Plossl, and Wight, was also credited with the introduction of MRP. 10/16/2019 bvarun.weebly.com

What is MRP? Computerized Inventory Control Production Planning System Management Information System Manufacturing Control System MRP is a system that controls inventory levels, plans production, helps supply management with important information, and helps with the manufacturing control system with respect to the production of assembled parts. 10/16/2019 bvarun.weebly.com

When to use MRP Job Shop Production Complex Products Assemble-to-Order Environments Discrete and Dependent Demand Items There are certain environments or situations in which it is better and more efficient to use MRP. These environments and situations are as follows. 10/16/2019 bvarun.weebly.com

What can MRP do? Reduce Inventory Levels Reduce Component Shortages Improve Shipping Performance Improve Customer Service Improve Productivity Simplified and Accurate Scheduling Reduce Purchasing Cost Improve Production Schedules Reduce Manufacturing Cost Reduce Lead Times Less Scrap and Rework Higher Production Quality MRP can do many things to help your company succeed. Probably the most important quality of MRP is the fact that it will help your company with inventory. It plans production so that the right materials are at the right place at the right time. 10/16/2019 bvarun.weebly.com

What can MRP do? Improve Communication Improve Plant Efficiency Reduce Freight Cost Reduction in Excess Inventory Reduce Overtime Improve Supply Schedules Improve Calculation of Material Requirements Improve Competitive Position Here are some qualities of MRP. MRP determines the latest possible time to product goods, buy materials, and add manufacturing value. Proper MRP can keep cash in the firm and still fulfill all production demands. 10/16/2019 bvarun.weebly.com

Three Basic Steps of MRP Identifying Requirements Running MRP – Creating the Suggestions Firming the Suggestions The three basic steps of MRP are 1) Identifying requirements for items to be included in an MRP run, 2) Running the MRP and creating suggestions for action, and 3) firming the suggestions to release manufacturing orders and purchase orders. 10/16/2019 bvarun.weebly.com

Step 1: Identifying the Requirements Quantity on Hand Quantity on Open Purchase Order Quantity in/or Planned for Manufacturing Quantity Committed to Existing Orders Quantity Forecasted The MRP system looks at several components of demand in order to create its suggestions. The requirements include the above items. Many of these requirements are included in the master production schedules and inventory master files that will be discussed later in this presentation. 10/16/2019 bvarun.weebly.com

Step 1: Important Information MRP is….. Company Sensitive Location Sensitive Date Sensitive The MRP system is company, location, and date sensitive. It is important that all data that is entered into the MRP system is accurate. Elements such as outdated bills of material, and lead times can negatively impact the results or MRP. 10/16/2019 bvarun.weebly.com

Step 2: Running MRP – Creating the Suggestions Critical Items Expedite Items Delay Items At the end of each day, the MRP system will be run to identify items as critical, expedite, or delay. The MRP system will suggest if you need to order more of a certain material by classifying into the three categories. Critical items are items of immediate importance that should be taken care of right away. Expedite items are items that need to be sped up so that it is completed in less than the normal lead time. Delay items are item that are not of vital importance and can be delayed for the benefit of other items. If you wish, the MRP system can also give greater details such as expected receipt dates, and customer orders making up the demand. 10/16/2019 bvarun.weebly.com

Step 3: Firming the Suggestions Manufacturing Orders Purchasing Orders Various Reports Once it has been run, the MRP system will suggest that the user send out a purchase order or manufacturing order. The user can then choose on whether to accept the suggestions of the system or change them. For example the MRP system will suggest that a purchase order be sent to order 100 units of material X. The user may accept this suggestion or change the information to fit what he thinks should be ordered. The MRP system keeps track of a vendor master file to ease of sending faxes, emails, or printouts of orders. 10/16/2019 bvarun.weebly.com

Overview of the MRP System Product Structure File Master Production Schedule Inventory Master File Material Requirements Planning The is an overview of how the MRP system works. The Orange boxes indicate the inputs into the MRP system. The MRP system then processes the information and delivers outputs as indicated by the yellow boxes. Manufacturing Orders Purchase Orders Various Reports 10/16/2019 bvarun.weebly.com

MRP Inputs Product Structure File Master Production Schedule Inventory Master File The three main inputs into the MRP system are product structure files, master production schedules, and inventory master files. These three main inputs summarize the input requirements described earlier. 10/16/2019 bvarun.weebly.com

Product Structure File Bill of Materials The product structure file contains a bill of material for every item produced. In other words, this file contains all the component parts for a larger item. For example if you are producing a car, the component parts for the car would be the screws, steel, rubber, and so on. Not only does the product structure contain all the component parts, it also supplies information for in which order the product is to be assembled. The MRP system accesses the product structure file to determine which component items need to be scheduled. 10/16/2019 bvarun.weebly.com

Master Production Schedule Schedule of Finished Products Represents Production, not Demand Combination of Customer Orders and Demand Forecasts What Needs to be Produced The master production schedule specifies which end items or finished products the company is to produce, how many are needed, and when they are needed. The numbers that are on the master production schedule represent production, not demand, may be a combination of customer orders and demand forecasts, and gives what needs to be produced. 10/16/2019 bvarun.weebly.com

Inventory Master File On-Hand Quantities On-Order Quantities Lot Sizes Safety Stock Lead Time Past-Usage Figures This file includes all the numbers from inventory. The MRP system keeps track of your inventory and when more items need to be ordered. It is important that you inventory numbers are accurate from the beginning in order for the MRP system to work properly. 10/16/2019 bvarun.weebly.com

MRP Process Schedules the Production of all items using an MRP Matrix Item: Low-Level Code: Lot Size: Lead Time: PD 1 2 3 4 5 Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases During the process, the the system uses an MRP matrix to record the calculations that are made. From the inputs discussed earlier in the presentation, the system calculates the gross requirements, scheduled receipts, projected on hand, net requirements, planned order receipts, and planned order releases. 10/16/2019 bvarun.weebly.com

Terms Defined Item – name or number for the item being scheduled Low-Level Code – the lowest level of the item on the product structure file Lot Size – order multiples of quantity Lead Time – the time from when an order is placed to when it is received PD – Past Due Time Bucket, orders behind schedule Some of the terms that are used with the MRP matrix are defined above. This should help the user understand how the MRP calculates everything. 10/16/2019 bvarun.weebly.com

Terms Defined Gross Requirements – demand for an item by time period Scheduled Receipts – material already ordered Projected on Hand – expected ending inventory Net Requirements – number of items to be provided and when Planned Order Receipts – net requirements adjusted for lot size Planned Order Releases – planned order receipts offset for lead times More terms defined. 10/16/2019 bvarun.weebly.com

Example of the MRP Process Item: A Low-Level Code: 1 Lot Size: 25 Lead Time: 1 PD 1 2 3 4 5 Gross Requirements 10 15 25 30 Scheduled Receipts Projected on Hand 20 Net Requirements Planned Order Receipts Planned Order Releases Here’s an example of how the MRP process works. This is a preliminary schedule that the MRP system gathered from the master production schedule, inventory master file, and product structure file. The question now is in what period should orders be released and what should be the size of those orders? 10/16/2019 bvarun.weebly.com

Example of the MRP Process Item: A Low-Level Code: 1 Lot Size: 25 min Lead Time: 1 PD 1 2 3 4 5 Gross Requirements 10 15 25 30 Scheduled Receipts Projected on Hand 20 Net Requirements Planned Order Receipts Planned Order Releases For period 1 we first want to calculate the projected on hand. This is done by subtracting the gross requirements in period one from the sum of the scheduled receipts in period 1, projected on hand from the previous period, and the planned order releases from the (t-l) period where t is the current period and l is the lead time. So the projected on hand for period 1 is 20 minus 10. The planned order releases are in sizes of 25 so we have planned order release of 25 for period one. Period two we repeat the same process. Now in period 3 we need to calculate the net requirements along with the projected on hand. The projected on hand = ((20+25)-25) = 20. The net requirements is calculated by subtracting the scheduled receipts (0) in the period plus the projected on hand in the previous period (20) from gross requirements (25) which equals 5. You want to repeat this process for all the periods. In the end the answer should be that orders should be released in periods 1,2,3,4, and 5 for quantities of 25,25,25,30, and 25 respectively. 10/16/2019 bvarun.weebly.com

MRP Outputs Manufacturing Orders Purchasing Orders Various Reports The MRP system delivers two main outputs along with various other reports. The two main outputs are manufacturing orders which can be released to shop floors for in-house production and purchasing orders which are sent to outside suppliers. The various reports offer suggested changes in previous plans or existing schedules. 10/16/2019 bvarun.weebly.com

Hubbell Lighting Case Manufactures Industrial Lighting Products Good-Quality Products Poor at Meeting Due Dates Work is Specialized for Each Customer Job Shop Environment Complex Products Hubbell light manufactures industrial lighting products for schools, malls, NASA, and other companies. They have a strong reputation of making good-quality products but also have a reputation of not meeting due dates. Their work is very specialized, in a job shop environment, and they make complex products. They have 3,200 end items. Some of which consist of 15,000 component parts that can be configured into over 5 million different final products. This situation would involve complex bills of material, production schedules and inventory files. This is an ideal situation to implement MRP. 10/16/2019 bvarun.weebly.com

Hubbell Lighting Case Before MRP Implementation Less than 75% of orders completed on time After MRP Implementation 97% of orders completed on time 2% of orders completed with 1 to 2 days after due date Hubbell lighting decided to implement an MRP system to improve its overall capabilities and completion times. Before the MRP implementation, Hubbell Lighting completed less the 75% of its orders on time. After the MRP implementation, on time orders rose to 97% with 2% of orders completed with 1 to 2 days of the promised completion time. 10/16/2019 bvarun.weebly.com

Summary of MRP MRP is a….. Computerized Inventory Control Production Planning System that….. Schedules Component Items as Needed which will….. Track Inventory and….. Help you in many other aspects of business Read the Summary above. 10/16/2019 bvarun.weebly.com

References Russell, Roberta S., and Bernard W. Taylor III. Operations Management. 3rd Edition: Prentice Hall, 2000 Grubbstrom, Robert W. Material Requirements Planning and Manufacturing Resource Planning. 03/12/2002. http://www.itbp.com/opsmanagement/iebm/material_requirements.htm. Vormittag Associates, Inc. System 2000 MRP. 03/12/2002. http://www.vaihome.com/s2000mrp.htm. Inventory Solutions. What is MRP?. 03/12/2002. http://www.inventorysolutions.org/def_mrp.htm. All information on this slide show was gathered from the above resources. 10/16/2019 bvarun.weebly.com