California Transportation Electrification Activities

Slides:



Advertisements
Similar presentations
EESE O&E Committee Update & Next Steps May 14, 2010.
Advertisements

ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
1 AB 32 Scoping Plan Energy Action Plan Meeting Mike Scheible Deputy Executive Officer California Air Resources Board California Public Utilities Commission.
IEEE JOINT TASK FORCE ON QUADRENNIAL ENERGY REVIEW Utility and Other Energy Company Business Case Issues Related to Microgrids and Distributed Generation.
California Energy Commission AB 1257 Report on the Role of Natural Gas in California Staff Workshop on California’s Natural Gas Infrastructure, Storage,
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
1 Plug-in Electric Vehicle Readiness For CMUA 11/8/2010.
1 Cal TF’s Support of California’s Broader Energy Policy Objectives ANNETTE BEITEL ALEJANDRA MEJIA JUNE, 2014.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Commission’s Energy Efficiency Research Activities Related to the HVAC Industry David.
Vehicle-Grid Integration (VGI) © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved.
AB32 Scoping Plan Update Readiness (Adaptation) Plan Environmental Goals and Policy Report Climate Change Research Plan Water Plan Update Integrated Energy.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
1 Review of CPUC Role with the Public Interest Energy Research (PIER) Program on Natural Gas Briefing for California Senate Energy, Utilities and Communications.
1 LCFS Electricity Workgroup Meeting Wednesday, July 14, 2010.
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
CPUC Role in AB 32 Implementation LIOB – 2 nd June, 2010 San Diego, CA.
AEE So Cal September 24, 2015 Integrating Renewables and The Distribution Grid of the Future 1.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
By Erik Takayesu, PE Director, Electric System Planning Southern California Edison More Than Smart Webinar August 4, 2015 Distribution Resources Plan.
CEC Project “Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability” Sunil Chhaya Principal Investigator.
11 AB 32 Climate Change Scoping Plan Progress Report October 21, 2010 California Air Resources Board.
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 2/26/15 Asish Gautam Demand Analysis Office Energy Assessments Division.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Southern California Edison Presented By Don Skaff Tesoro High School Emerging Technologies Readiness Job Shadow Emerging Technologies Project Manager.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
SB350 IRP Overview April 18, 2016 Tanya DeRivi Southern California Public Power Authority Scott Tomashefsky Northern California Power Agency CEC IRP Workshop.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
September 4, 2008 Beyond Oil. CONFIDENTIAL2 Building ‘smart grid’ technology to control the flow of electricity between the grid and plug-in vehicles.
California Energy Efficiency Policy and Goals Beena Morar Southern California Edison June 14, 2016.
Retail Metering Working Group Progress Report 08/15/07.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
The Role of Energy Storage in Supporting the Energy Transition 23 June 2016 Energy Infrastructure Forum Copenhagen, Denmark Thierry Le Boucher EASE Vice-President.
Locational Net Benefit Analysis Working Group
LNBA Subgroup: Avoided Transmission Value
Transmission-Distribution Interface Working Group Meeting
Locational Net Benefit Analysis Working Group
East Coast utility EV Initiative
Locational Net Benefit Analysis Working Group
Market Operations Engagement Group EVSE Working Group – Principles
Alternative Transactive Electricity Market Models
VEHICLE ENERGY SYSTEMS
Mike Jaske California Energy Commission
Next Generation Distribution System Platform (DSPx)
Distributed Energy Strategy - Solar PV
GREENHOUSE GAS EMISSIONS INVENTORY
Integrating Distributed Energy Resource into Grid Operations
The Transition to a High DER Future
The Future of Demand Response in New England
Opportunities in the Changing Energy System
The Case for Why and When PCE Programs
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
Forging Sustainable Solar (and Storage) Incentives for New England
Wind & Transmission: The Clean Energy Superhighway
Transforming Maryland's Electric Distribution Systems
DECISION
European energy policy
Transportation Electrification Programs Overview
Energy Storage Roadmap & Flexibility Roadmap Information Session
DC National Grid Modernization Trends NC DEQ Clean Energy Plan Workshop #3 April 22, 2019 Autumn Proudlove Senior Manager of Policy Research NC Clean.
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

California Transportation Electrification Activities Background and Context for VGI Working Group Launch Meeting August 19, 2019

Vehicle-Grid Integration (VGI) is crucial to meeting the state’s transportation electrification goals The growing load from electric vehicle (EVs) could adversely affect the electric grid if not managed Grid services must be balanced with drivers’ needs SB 350 requires electricity as a transportation fuel to be a lower-cost option than conventional fuels Managed EV charging and discharging could help meet higher renewable generation procurement requirements and emission reduction goals Two-way communication between EVs and grid managers can provide incremental benefits to drivers and the grid at large

CPUC in 2018 initiated a new rulemaking to provide clear guidance for future IOU TE investment programs The DRIVE OIR (R.18-12-006) directs the CPUC to identify a clear role for IOUs in meeting statewide TE goals Informed by statewide goals for ZEV adoption, GHG reduction and air quality improvement and the CEC’s AB 2127 Infrastructure Deployment Strategy Align with other state and local policies and programs Improve access to charging for all ratepayers Encourage third-party investments Explore emerging issues such as micromobility, car- and ride-sharing services, and autonomous vehicles Provide grid benefits and reduce the cost of electricity as a transportation fuel Launch a new interagency working group to help identify and scale the value(s) of VGI

VGI is an interagency effort beyond this new Working Group California VGI Roadmap Published in 2014 as the core statewide approach to enabling vehicle-grid services Currently being updated by the CEC, in collaboration with CARB, CPUC, CAISO, and GO-Biz to incorporate new transportation segments and consumer-orientation 2017 VGI Communication Protocols Working Group Staff recommended hardware requirements to ensure infrastructure is capable of high-level communication Submetering Identify strategies to facilitate submetering to reduce the cost of implementing EV- specific rates and other VGI use cases Infrastructure deployment Increase access to charging options for all Californians while ensuring growing EV loads do not adversely affect the grid

Stakeholder efforts since 2017 to lay new VGI groundwork CEC-led VGI Roadmap Research & Symposiums (2017-Present) Synthesizing R&D investment lessons in coordination with DER Research Roadmap Identifying strategies to prioritize and implement actions across stakeholders Firming links between research, deployment planning, and infrastructure assessments CAISO ESDER 3 implementation (2019-20) and ESDER 4 policy launch (2019) Allows the use of submeters to separately calculate and value EV load curtailment Identifying parameters that better reflect DER operational characteristics and how to qualify variable-output DERs Gridworks-led VGI initiative and framing document (2018-2019) Evaluated potential grid benefit valuation methods Identified data gaps and potential resources to fill them Compiled a literature review of recent VGI value studies

Definition of VGI VGI should ensure increasing load from electric vehicles is helping the state meet its GHG and renewable energy goals while providing grid benefits SB 676 (Bradford, 2019) proposes to define VGI as: “any method of altering the time, charging level, or location at which grid-connected electric vehicles charge or discharge, in a manner that optimizes plug-in electric vehicle interaction with the electrical grid and provides net benefits to ratepayers by doing any of the following: Increasing electrical grid asset utilization Avoiding otherwise necessary distribution infrastructure upgrades Integrating renewable energy resources Reducing the cost of electricity supply Offering reliability services consistent with Section 380 or the ISO tariff” This legislation has not been adopted and the definition is still in flux. Also, the CPUC has authority to modify the definition above in the current version of the bill

New VGI Working Group Scope defined in DRIVE OIR The DRIVE OIR asks the new interagency working group to build upon prior and ongoing efforts to, at a minimum: Identify what VGI use cases can provide value now, and how that value can be captured Evaluate how the value of VGI use cases compare to other storage or distributed energy resources Provide policy recommendations to the CPUC if any changes are to allow additional use cases to be deployed in the future

New VGI Working Group Scope (continued) The work plan should leverage existing resources from the 2017 VGI Communication Protocol Working Group, the VGI Roadmap update effort, and other interagency efforts to identify, capture, and scale the value of VGI Costs and benefits of V1G and V2G use cases should be evaluated Out of Scope: Pros and cons of specific communication pathways Technical interconnection requirements (i.e. Rule 21, which is being revised through CPUC docket R.17-07-007)