MKCG MEDICAL COLLEGE & HOSPITAL, BEHRAMPUR, ODISHA

Slides:



Advertisements
Similar presentations
Kingdom Hall Construction Burundi. Facts on Burundi No. of Congregations:51 Kingdom Halls Needed:35 Kingdom Halls completed since start of program:29.
Advertisements

366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
Elegant. Project Approved By “Elegant” a project blended with nature’s beauty, peace and tranquility. “Elegant” redefines beauty, leisure and excitement.
EventFlat Earnest Money Deposit10 Completion of Plinth10 Completion of slab 13 Completion of slab 23 Completion of slab 33 Completion.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Pulivendula 1.  construction area of 1.32 Lakhs Sq.ft comprising Laboratory Animal House, Community center, Shopping Complex, Primary School, Auditorium,
CONSTRUCTION OF IGCARL RESEARCH BUILDING COMPLEX
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Awards for Excellence in Downtown Revitalization Category: Building Rehabilitation Golden Street Loft Apartments.
Special School of Athens School Presentation/ Activities.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Foundations Mr. O’Rourke Construction. Definition the first piece of a home to be constructed and creates a base for the rest of a home's components.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
NIGHT DUTY RESPONSIBILITIES of MLOP in the Main Hospital WARD NIGHT DUTY RESPONSIBILITIES of MLOP in the Main Hospital WARD.
Progress Report on Construction Projects of Rajarata University of Sri Lanka as at 30 th June 2015.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Government Engineering College Painavu, Idukki. IDP status of Achievement Sl. No DeliverablesTargetCurrent Status 1Number of students registered for (a)
Natural Sciences for Adult Learners 3rd November 2010 Filipe Dias, 2010.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Computer Visualization Final Project The Rusakov Club Sheridan College Architectural Technology Course: Architectural Computer Visualization 1 By Jonathan.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
GOVERNMENT POLYTECHNIC FOR GIRLS, AHMEDABAD COMPUTER DEPARTMENT WELCOMES YOU TO THE ORIENTATION PROGRAMME 3 rd August 2015 Term Date : 3/8/2015 to 11/12/2015.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
1 VIET NAM – COUNTRY PAPER Designed by lecturer : NGUYEN THI THANH XUAN WELCOME TO NINH BINH MEDICAL COLLEGE.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
By Prof.Kuldeep Nayi Sub : Building Construction ( )
Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009.
TOWER A Bldg. As of July 21,2009 SCHEDULED ACCOMPLISHMENT21.79% ACTUAL ACCOMPLISHMENT29.46% VARIANCE+7.67% SUMMARY OF ACCOMPLISHMENTS PROJECT DURATION.
The school building in the period between the Unification of Italy and the First World War: intervention methodology applicable to a stock property.
Tanvee Housing Complex (HIG & MIG)
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
The school building in the period between the Unification of Italy and the First World War: intervention methodology applicable to a stock property.
Bengal Engineering and Science University, Shibpur
AARNA Progress Report-January 2017
Prepare for NEET with NOTS APP
How To Tie A Shoe By: Period.
Progress Charts.
AARNA Progress Report-June 2017
PROGRESS REPORT ON CONSTRUCTION PROJECTS
Erma Ora Byrd Hall – 1st (Ground) Floor
Implementation of Entity Relationships
International Building Materials and components
Background - Facts about adolescent population 15-19
MATERIALS AND CONSTRUCTION I
The Derivative as a Function
Pier Foundations Piers Suspended floor Ground beam Next slide.
Are You Smarter Than a 5th Grader?
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Special Valuation 1017 W First Avenue Odd fellows Hall/Montvale Event Center Commercial.
Paul ‘Captain’ Cronkwright
Kinder Math Bee Counting Practice.
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Kinder Math Bee Addition Practice.
Thank you to our Skeleton Sponsors
Erma Ora Byrd Hall – 1st (Ground) Floor
Toilets In ČRG.
Before and After Practice
Timekeeper t OVER (Time lapse display Lecture Discussion
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Presentation transcript:

MKCG MEDICAL COLLEGE & HOSPITAL, BEHRAMPUR, ODISHA Space for photo PROGRESS STATUS

Perspective Views Auditorium Hall(G+1) Laboratory Complex(G+6) Super Specialty Block(G+4) Auditorium Hall(G+1) Laboratory Complex(G+6) Lecture & Examination Hall(G+3) Sr. Resident Doctors Hostel(S+6) PG Gents Hostel(S+4)

Perspective Views UG Boys Hostel(S+5) UG Girls Hostel(S+4) PG Ladies Hostel(G+4) UG Boys Hostel(S+5) LT & Laboratory Building for Nursing School(G+3) Student Nurses Hostel(G+3) UG Girls Hostel(S+4)

Lecture & Examination Hall (G+3) External Plastering in Progress

Auditorium (G+1) Truss Erection works in Progress. Masonry Activities in Progress in Ground & First Floor Levels.

Brickwork activities in progress at 2nd, 3rd & 4th Floor levels Lab Complex (G+6) Brickwork activities in progress at 2nd, 3rd & 4th Floor levels

LT & Lab Complex for Nursing School (G+3) Brickwork in Progress at 1st Floor Level

Super Speciality Block (G+4) 1st Floor Slab completed. 2nd Floor Slab Pour-3 & 3rd Floor Slab Pour-2 : Activities in Progress

UG Boys Hostel (S+5) Brickwork completed at 2nd Floor level. Activities in progress at 1st & 3rd Floor level.

External Plastering in Progress UG Girls Hostel (S+4) External Plastering in Progress

Flooring Works in Progress PG Gents Hostel (S+4) Flooring Works in Progress

External Plastering Completed. Flooring works in progress PG Ladies Hostel (G+4) External Plastering Completed. Flooring works in progress

Sr. Resident Doctors Hostel (S+6) Terrace Slab Last Pour ready for Concreting. Brickwork in Progress at 2nd & 3rd Floor levels.

Student Nurses Hostel (G+3) Internal finishing works in Progress

Service Building for SS Block (G) Structure Completed. Brickwork in Progress.

THANK YOU.