BES III Software: Short-term Plan ( )

Slides:



Advertisements
Similar presentations
27 Oct. 2000TGC Simulation video meeting1 Trigger Simulation Hisaya Kurashige KOBE Univ.
Advertisements

20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
Global Particle Identification Software Requirements Steve Kahn Mice Collaboration Meeting 31 March 2004.
Algorithms and Methods for Particle Identification with ALICE TOF Detector at Very High Particle Multiplicity TOF simulation group B.Zagreev ACAT2002,
1 Benchmarking the SiD Tim Barklow SLAC Sep 27, 2005.
BESIII Offline Software Overview Weidong Li & Yajun Mao BESIII Collaboration Meeting, Beijing 12 January 2006.
May 29 - Jun 4 , 2005BESIII Annual Meeting , Beijing 1 The BESIII Detector Description With XML Jun 1, 2005 Zhengyun You , Yajun Mao (School of Physics,
Status of MC Simulation Huaimin Liu BESIII Collaboration meeting IHEP, Beijing, Jan. 12, 2006.
BES III core/reconstruction software planning for Release 3.0 BES III core/reconstruction software planning for Release 3.0 Li Weidong
BES Ⅲ Detector Description and Event Display Zhengyun YOU, Yajun Mao School of Physics, Peking University Jan.10th, 2006.
GlueX Software Status April 28, 2006 David Lawrence, JLab.
The BESIII Offline Software Weidong Li Institute of High Energy Physics, Beijing Workshop on the cooperation of PRC-US in HEP 16 June 2006.
BESIII MC Release notes & planned development Dengzy, Hem, Liuhm, Youzy, Yuany Nov. 23, 2005.
BESIII Detector Simulation with Geant4 Huaimin Liu, Guofu Cao IHEP, Beijing 12 th Geant4 Collaboration Workshop Hebden Bridge (UK), September, 2007.
Summary of PHOS Internal Notes (part I) Rafael Diaz Valdes 10/25/20151.
CBM Software Workshop for Future Challenges in Tracking and Trigger Concepts, GSI, 9 June 2010 Volker Friese.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
BESIII Simulation Software Deng Ziyan, IHEP ACAT 2007, Amsterdam April
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
ATLAS Data Challenges US ATLAS Physics & Computing ANL October 30th 2001 Gilbert Poulard CERN EP-ATC.
SiD performance for the DBD Jan Strube CERN. Overview Software Preparation (CERN, SLAC) Machine Environment (CERN, SLAC) Tracking Performance (C. Grefe)
Simulations for CBM CBM-India Meeting, Jammu, 12 February 2008 V. Friese
1 PID & FPD Software Gilvan Alves (Lafex/CBPF) Q4Q4 D S Q2Q2 Q2Q2 Q3Q3 Q3Q3 Q4Q4 S A 1Q A1SA1S A 2Q A 2S P 1Q P 2S P 1S P 2Q p p Z(m) A D1 Detector Roman.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
1 Open charm simulations ( D +, D 0,  + c ) Sts geometry: 2MAPS +6strip (Strasbourg geo) or 2M2H4S (D+ and D - at 25AGeV); TOOLS: signal (D +  K - 
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Annual Meeting 2005/05/29.
18 december 2002, NIKHEF Jamboree Tracking and Physics Studies, Jeroen van Tilburg 1 Tracking and Physics Studies in LHCb Jeroen van Tilburg NIKHEF Jaarvergadering.
A. BHASIN ALICE offline Software Week 13th June 2002 Dimuon High Lelvel Trigger (DHLT) ● Goals ● FM Algorithm ● Proposal for a new Algorithm.
BES III reconstruction software planning for Summer 2004 BES III reconstruction software planning for Summer 2004 Li Weidong
Weidong Li January 7, 2004 BES III Software Meeting Status Report: BESF software development environment Weidong Li.
BES III Software: Overview, Status and Plan Weidong Li Representing BES III Software Group BES Annual Meeting, Beijing 1 st June 2005.
CBM Simulation Walter F.J. Müller, GSI CBM Simulation Week, May 10-14, 2004 Tasks and Concepts.
NEC' /09P.Hristov1 Alice off-line computing Alice Collaboration, presented by P.Hristov, CERN NEC'2001 September 12-18, Varna.
Features needed in the “final” AliRoot release P.Hristov 26/10/2006.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
1 OO Muon Reconstruction in ATLAS Michela Biglietti Univ. of Naples INFN/Naples Atlas offline software MuonSpectrometer reconstruction (Moore) Atlas combined.
Javier Castillo 1 Muon Embedding Status & Open Issues PWG3 - CERN - 15/02/2011.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
SIlicon VErtex TrAcker Rather than fixed common geometry the common analysis and simulation tools are needed. Such software package should provide : 
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
Big picture: What’re the sub-topics of the software framework? What’s the relationship of them? How to arrange data pipe? 1.
BESF Framework Development Weidong Li
BESIII offline software group Status of BESIII Event Reconstruction System.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
14/06/2010 Stefano Spataro Status of LHE Tracking and Particle Identification Status of LHE Tracking and Particle Identification Stefano Spataro III Panda.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
Muon identification in ATLAS Peter Kluit (NIKHEF).
MUC Reconstruction status and GDML Management You Zhengyun School of Physics, PKU
April12 DST calibration status
Software Overview S. Margetis Kent State University HFT CD0 Review.
Measurement of track length and time-of-flight hypothesis
Physics Software Towards first Physics data Reconstruction Alignment
Stress tests for CLAS12 software
Status of Brunel team and next steps
ALICE Offline Week, CERN
OO Muon Reconstruction in ATLAS
Overview of CLAS12 Calibration
US ATLAS Physics & Computing
Special edition: Farewell for Stephen Bailey
Special edition: Farewell for Eunil Won
Status report on MDC reconstruction software
STAR Detector Event selection and triggers Corrections to data
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
MUC simulation and reconstruction
Workshop on Forward Calorimetry Prague, April 16 Impact of Bhabha scattering on the BeamCal performances Vladimir Drugakov NC PHEP, Minsk/DESY Zeuthen.
The TOTEM T2 Telescope based on triple-GEM chambers
Presentation transcript:

BES III Software: Short-term Plan (2005.6 - 2005.10) Weidong Li 14th June 2005

To-do List (1) Analysis software development Particle identification Vertex finding Calibration algorithms and detector alignment services Trigger simulation Event filter software and testbed Geometry services migrate to new detector description More realistic detector simulation Backgrounds Digitization Raw data production 29 May 2005 Weidong LI

To-do List (2) Event display Reconstruction algorithms Root event input MDC TOF EMC MUC hits Reconstructed tracks or clusters Reconstruction algorithms Move to latest release 4.2 performance tuning Performance studies Efficiency and resolution Algorithms’ benchmarking and profiling Any memory leakage Another design iteration for EDM Documents 29 May 2005 Weidong LI