Presentation is loading. Please wait.

Presentation is loading. Please wait.

BES III core/reconstruction software planning for Release 3.0 BES III core/reconstruction software planning for Release 3.0 Li Weidong 2003.12.3.

Similar presentations


Presentation on theme: "BES III core/reconstruction software planning for Release 3.0 BES III core/reconstruction software planning for Release 3.0 Li Weidong 2003.12.3."— Presentation transcript:

1 BES III core/reconstruction software planning for Release 3.0 BES III core/reconstruction software planning for Release 3.0 Li Weidong 2003.12.3

2 3 December 2003BES III Software Meeting2 Release 3.0 Plan  Release contents Raw Event Format Identifier Geometry Information Service Geometry information database access Raw Event Data Model (MDC, EC, dE/dx and MC) Part of reconstruction code (MDC, EC, dE/dx and MC)  Time schedule beginning of December 2003 to mid of January 2004

3 3 December 2003BES III Software Meeting3 Raw Event Format  who: Zhang Xiaomei  dependences: a key and fundamental package  risks: lots of validation and test work will be involved.  backup plan: Previous Event I/O service  status: A few Discussions with Zhu Kejun Work out a proposed event format Implementation design is in progress

4 3 December 2003BES III Software Meeting4 Identifier  who: Li Weidong  how: Identifier value is a simple 32 bit unsigned integer. Identifier helper class provides methods to generate or decode an identifier for the different levels of the detector element hierarchy.  status: basic idea was presented in the software meeting 19/11/03 further discussed with Shilei, Wangzhe and Xiaomei first implementation is ready waiting for integration into Geometry Service

5 3 December 2003BES III Software Meeting5 Geometry Service  who: Zhang Xiaomei and Li Weidong  how: Define common interfaces for different sub-detectors Data caching ability One service per sub-detector system  dependencies: Qiumei’s Database access code MDC, EMC and MC geometry data class  risks: may not provide a unified interface for both Rec and M.C. applications, but Rec algorithm developers can use those services.  status: Initial discussions started (Shilei, Dayong, Wangzhe, YuanYe and Chengdong)

6 3 December 2003BES III Software Meeting6 DC reconstruction  who: Zang Shilei  how: Retrieve Geom information and store them in the Rec module Write partially-functioned or dummy modules to form the skeleton of track reconstruction.  dependencies: Geometry Service, Database Access, Raw Event Format packages  risks: Time is tight and the dependencies.  backup plan: Generate single track event; write some basic classes for track finding module.  status: Geometry data classes have been designed.  ref: Belle CDC Rec modules and panther tables

7 3 December 2003BES III Software Meeting7 dE/dx Reconstruction  who: Wang Dayong  how: Refine the main packages of the dE/dx Module to the level of public members and methods Implement and test database I/O interface of dE/dx Data Co-design and share Geo and Rec data format with Zang- Shilei and YuanYe; databse I/O test with Ma Qiumei  risks: Foundation of the correction models not so sure.  backup plan: Try best to raise the refinement; Otherwise limited and branch methods at the time also fulfill the requirements of system test.  status: The first version with only skeleton of branch methods finished and is being test

8 3 December 2003BES III Software Meeting8 EMC reconstruction  who: Wang Zhe  how: Event Model; Environment Model; MakeShower  dependencies: Identifier, MC EMC hit, Database  risks: Geometry, MC EMC hit  backup plan: fake Geometry, fake hit  status: Event Model finished  ref: Belle ECL reconstruction software

9 3 December 2003BES III Software Meeting9 Database Access  who: Ma Qiumei  how: Following the successful implementation for MC, build the geometry database of DC and EMC and provide interface programs.  dependencies: Geometry data files from DC and EMC software developers  status: The geometry database for MC has been setup and the corresponding geometry service available to MC Rec module. Design and preparation are in progress

10 3 December 2003BES III Software Meeting10 CMT  who: Teng Tao  how: Start some experiment and initial work in consultation with Xingtao and Xiaomei. Write requirement files package by package. The current directory structure may need small modification.  risks: lack of technical expertise and may not work for the whole system.  backup plan: automake compile system  status: CMT tool has been installed and works well Study on CMT is in progress  ref: CMT manual and Gaudi and Athena examples


Download ppt "BES III core/reconstruction software planning for Release 3.0 BES III core/reconstruction software planning for Release 3.0 Li Weidong 2003.12.3."

Similar presentations


Ads by Google