RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
An Airline Perspective Prepared by Capt. Ian Varcoe, Air New Zealand.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
GAGAN USER GROUP INTERACTION PROGRAM WITH HELICOPTER OPERATORS 10 th July 2014 Airports Authority of India New Delhi Airports Authority of India- FPD section1.
Continuous Climb Operations (CCO) Saulo Da Silva
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Protection Values for VOR-Defined ATS Routes
Standard Terminal Arrival Routes STARs
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
APAC PBN Seminar F.LECAT (ICAO)
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
AIR TRAFFIC CONTROL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
LECTURE 4: ICAO CHART requirements
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Lecture 10: Traffic alert and Collision Avoidance System (TCAS)
Lecture 10: Traffic alert and Collision Avoidance System (TCAS)
APAC PBN Seminar F.LECAT (ICAO)
Aerodrome Operations under Limited Visibility Conditions
Vertical, lateral separations based on time / distance
Performance Based Communication and Surveillance (PBCS)
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
AIR TRAFFIC ONTROL.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
PBN OVERSIGHT IN AUSTRALIA
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
OPERATIONS ON PARALLEL OR NEAR-PARALLEL RUNWAYS
longitudinal separations based on time / distance
An Airline Perspective
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Performance Based Navigation: Navigation Specifications
AIR TRAFFIC CONTROL SERVICE
SEPARATION Module 1, Topic 1.
Ground System implication for ASAS implementation
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Oceanic and International Operations
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Session – 4: Existing ICAO Standards relating to Air Traffic Control
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Ops Specs The performance data for takeoff and landing an aircraft can be obtained from the aircraft's flight manual or pilot's operating handbook. The.
RNAV and RNP Strategy in Japan
Magesh Mani BSACIST.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
Presentation transcript:

RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,

RNAV – process in Tartu How EAVA can co-operate with service providers Tapani Keskikuru EAVA ATSTO

Backround European Nav strategy …NDB, VOR will be history ( target 2016) http://www.ecacnav.com/downloads/NAV%20Application%20+%20NAVAID%20Infrastructure%20Strategy%2015MAY08%20Agreed%20at%20SCG-8.pdf PRNAV approaches, replacing conventional Non-Precision approaches (VOR, NDB) and even CAT I ILS – with VNAV/BARO 17.09.2019

Background 17.09.2019

Background What are the near future nav. requirements from service providers RNAV approaches with VNAV – CAT I minima, without any ground equipment (not to forget lights !!,, ) WAM ,no need for SSR antennas, less expensive, surveillance can be built wherever, spread wherever 17.09.2019

Backround 17.09.2019

EAVA and Tartu PRNAV Tartu case : ATCOs Marika, Piret and Martin, local knowledge not much tools for ATC to separate IFR / IFR flights in TMA, no equipment for operators Tartu speciality : IFR (and VFR) training flights 17.09.2019

Requirements: Update approaches, started before EAVA joined ( operational in 2013) for operators for students, future pilots Need to have tools for ATCOs to separate IFR traffic in TMA, present NDB surroundings is for one IFR, if levels crossed Up to date approaches, for students ! 17.09.2019

EAVA and Tartu PRNAV from pilot/ operator point of view benefits are obvious from airport point of view benefits are obvious, from ATC point of view benefits are obvious 17.09.2019

EAVA and Tartu PRNAV from safety point of view benefits are obvious ( one example - no circling) from environmental side shorter routes in many cases continuous climb/ descend in many cases shorter holding time on ground/ in air or no delay at all noise can be taken account 17.09.2019

EAVA and Tartu PRNAV No ICAO procedures for RNAV separations are published ! PANS-ATM ICAO DOC 4444 „Lateral separation of aircraft on published adjacent instrument flight procedures for arrivals and departures 5.4.1.1.1 Lateral separation shall be applied so that the distance between those portions of the intended routes for which the aircraft are to be laterally separated is never less than an established distance to account for navigational inaccuracies plus a specified buffer. This buffer shall be determined by the appropriate authority and included in the lateral separation minima as an integral part thereof. 5.4.1.1.2 Lateral separation of aircraft is obtained by requiring operation on different routes or in different geographical locations as determined by visual observation, by the use of navigation aids or by the use of area navigation (RNAV) equipment. 17.09.2019

EAVA and Tartu PRNAV Lateral separation of departing and/or arriving aircraft, using instrument flight procedures, will exist: a) where the distance between RNAV 1, Basic RNP 1, RNP APCH and/or RNP AR APCH tracks is not less than 13 km (7 NM); or 5.4.1.1.1 Lateral separation shall be applied so that the distance between those portions of the intended routes for which the aircraft are to be laterally separated is never less than an established distance to account for navigational inaccuracies plus a specified buffer. This buffer shall be determined by the appropriate authority and included in the lateral separation minima as an integral part thereof. 5.4.1.1.2 Lateral separation of aircraft is obtained by requiring operation on different routes or in different geographical locations as determined by visual observation, by the use of navigation aids or by the use of area navigation (RNAV) equipment. 17.09.2019

EAVA and Tartu PRNAV Lateral separation of departing and/or arriving aircraft, using instrument flight procedures, will exist: b) where the protected areas of tracks designed using obstacle clearance criteria do not overlap and provided: operational error is considered. 5.4.1.1.1 Lateral separation shall be applied so that the distance between those portions of the intended routes for which the aircraft are to be laterally separated is never less than an established distance to account for navigational inaccuracies plus a specified buffer. This buffer shall be determined by the appropriate authority and included in the lateral separation minima as an integral part thereof. 5.4.1.1.2 Lateral separation of aircraft is obtained by requiring operation on different routes or in different geographical locations as determined by visual observation, by the use of navigation aids or by the use of area navigation (RNAV) equipment. 17.09.2019

EAVA and Tartu Rnav Note 1.— The 13 km (7 NM) value was determined by collision risk analysis using multiple navigation specifications. Information on this analysis is contained in Circular 324, Guidelines for Lateral Separation of Arriving and Departing Aircraft on Published Adjacent Instrument Flight Procedures. 5.4.1.1.1 Lateral separation shall be applied so that the distance between those portions of the intended routes for which the aircraft are to be laterally separated is never less than an established distance to account for navigational inaccuracies plus a specified buffer. This buffer shall be determined by the appropriate authority and included in the lateral separation minima as an integral part thereof. 5.4.1.1.2 Lateral separation of aircraft is obtained by requiring operation on different routes or in different geographical locations as determined by visual observation, by the use of navigation aids or by the use of area navigation (RNAV) equipment. 17.09.2019

EAVA and Tartu Rnav PANS-OPS (ICAO 8168) guidelines for obstacle clearance criteria 5.4.1.1.1 Lateral separation shall be applied so that the distance between those portions of the intended routes for which the aircraft are to be laterally separated is never less than an established distance to account for navigational inaccuracies plus a specified buffer. This buffer shall be determined by the appropriate authority and included in the lateral separation minima as an integral part thereof. 5.4.1.1.2 Lateral separation of aircraft is obtained by requiring operation on different routes or in different geographical locations as determined by visual observation, by the use of navigation aids or by the use of area navigation (RNAV) equipment. 17.09.2019

EAVA and Tartu PRNAV -Plan is to create SID/STAR for Tartu linking TMA EXIT/ENTRY points to RNAV approaches with “designated points” where safety buffers are not overlapping ( ICAO DOC 4444) -Make easy tool for ATC to give clearances for IFR aircraft keeping them on arrival/departure segments which are not overlapping, while no vertical separation exists. 17.09.2019

17.09.2019

EAVA and Tartu Rnavs 17.09.2019

EAVA and Tartu PRNAV 17.09.2019

EAVA and Tartu PRNAV How to continue; AIS to create maps, data into EAVA simu and drive first simulations Make first changes if needed , create ATC documentation In parallel, to create data for SMS 17.09.2019

EAVA and Tartu PRNAV End result: Tartu PRNAV SIDs and STARs get CAA approval for Tartu ATC procedures for PRNAV SID/STAR in non –radar environment give a tool for ATC to have more than one IFR a/c in TMA on crossing levels 17.09.2019

EAVA and Tartu Rnavs End result: procedures ready ATC has necessary “tools” and uses them to provide user friendly service SMS ready training material ready 17.09.2019

EAVA envolvement - previous knowledge Synthetic Training Device ( simulator) easy to make changes and run tests - up to date training facilities - If needed, capability to show CAA the procedures in SIMU environment during acceptance period - capability to train TARTU ATC instructors ( or all staff) 17.09.2019

Our goal 17.09.2019

Not to confuse 17.09.2019

End result - 17.09.2019

All happy ! 17.09.2019