NAVSEA 05L4 Damage Control USS COLE DDG67.

Slides:



Advertisements
Similar presentations
AFT END ARRANGEMENT By Group 1.
Advertisements

Damage Control.
Inspected in port Shanghai from 26th to 28th Sept by NCL
SPC-LE SPEC’S NAV & PILOTING SPC-LE.
ADX 150 – Engine Repair ADX 170 – Climate Controls
USS Liberty, a pictorial story Donald W Pageler.
Access Road Stern Bow Suggested lay down area. Looking from bow down port side of vessel to the stern Non detect, clean overburden.
Flotation Requirements for Recreational Boats
Lesson 4 Shell Plating and Framing.
Military Time and Shipboard Terminology
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
Starboard Side: Looking Forward Notch accessed by removing small Teak pieces A fore/Aft floor support was fit into this notch, which was, of course, one.
General Arrangement Plan
General Arrangement Plan
1 USING MOLLART SPRAY MIST SYSTEM. 2 SETTING UP IN CONVENTIONAL MANNER DATUM YOUR PART AS NORMAL PROCEDURE.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
E8, , Wing Damage.
Ship Design & Engineering
Office of Marine Safety Stability and Flooding Eric Stolzenberg.
Ship Design & Engineering
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
General sea terms.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
General Arrangement Plan
BOATING BASICS MR. O TRANSPORTATION.
Dewatering Equipment.
3 CASE STUDIES - POTENTIALLY POLLUTING WRECKS SS JACOB LUCKENBACH SS PALO ALTO F/V MWAALIL SAAT.
Floors and Double Bottoms
Decks, Bulkheads, and Flooding
Scavenge fires Oily carbon deposits build up in the scavenge trunking during normal operation of the engine. Drains are provided in order to remove such.
Framing Systems Double Bottom Construction Stem & Stern Construction
Investigator Casualty Guide Identifying & Assessing Damage “Looking Deeper” March 2013.
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
Deck Beams. athwart ship member located under the deck plating usually fitted on every frame more desirable to fit extra beams then to increase thickness.
USS DEWERT (FFG-45) Example of Major Casualty Training Scenario for Final Evaluation.
Space Shuttles By Frederick. Launching Space Shuttles To lift the 4.5 million pound (2.05 million kg) shuttle from the pad to orbit (115 to 400 miles/185.
One Corps Serving the Armed Forces and the Nation Mel Price Locks & Dam Miter Gate Inspections Navigation Lock and Dam Inspection and Emergency Repairs.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
Chapter five Group weights, water draft, air draft and density.
What Makes Up a Ship?.
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
Lecture 2: Ship structural components
Coolant Fill Coolant Check and Fill. Oil Fill & Dip Stick Main Engine Oil Fill Dip Stick Delo 400 – 40 wt. Engine Oil.
USS PAUL HAMILTON FY 16 Extended Dry-Docking Selected Restricted Availability Dry Dock Availability Competition Area: Coast Wide – West Coast Rough Estimate.
The Cooling System (Reasons for)
Module 3 – Naval Skills Section 2 – Ship Structure Chapter 1 – Ship Construction Unit 1 - Ship Construction and Damage Control.
HSM-51 Warlords MH-60 Romeo Distinguishing Features
Friday – port side engine room weekly checks
Teknologi Dan Rekayasa
3204 Orion Beneteau 32 Nav Settee Lazarette Head V Berth Aft Cabin
Seamanship: Sea Terms SCC_SM01_P_Terms
Ship Construction Framing Systems Double Bottom Construction Stem & Stern Construction.
7 K NU NCC, ERNAKULAM MAIN PARTS OF A SHIP.
4203 Sea Angel Catalina 42 Galley Head Aft Cabin V Berth
DANGER DANGER DANGER INTAKE DANGER INTAKE DANGER DANGER DANGER R R E E
تخمین مخازن در چاههای اکتشافی
Topic 5: Hydraulics and Pneumatics
Booster Hose Reel Location/Operations.
DC FITTINGS LOCATION & IDENTIFICATION
A2/B2 CROSSCONNECT VALVE FPL (located on D1 Level)
Expeditions to bring Evidence
Seamanship: Sea Terms SCC_SM_SeaTerms_P
Bangladesh University of Engineering & Technology Department of Naval Architecture and Marine Engineering NAME-118 Ship design & DRAWING I LEVEL-1 , TERM-II.
3203 Santorini Beneteau 32 Nav Settee Lazarette Head V Berth Aft Cabin
Damage Control Rapid Plotting
THE STARK INCIDENT DIRECT DAMAGE COST CAME TO $142,000,000.
SEAMANSHIP
Presentation transcript:

NAVSEA 05L4 Damage Control USS COLE DDG67

Mess Decks MAIN DECK Frame 220 Looking forward on Mess Decks

MAIN DECK Frame – 220 Port side Looking forward Mess Decks

Galley MAIN DECK Frame 215 Looking into Galley

MAIN DECK Frame 215 Looking Stb to Port At serving line

MAIN DECK Frame 206 DCRS 5 DCRS 5

Looking Aft on Port side Galley CPO Mess MAIN DECK Frame 174 Looking Aft on Port side

Galley CPO Mess MAIN DECK Frame 174 Looking aft

Into Oil Lab and General Galley CPO Mess MAIN DECK Looking down into The access 2-183-2-T Into Oil Lab and General Work shop access

Galley CPO Mess CPO MESS Frame 174 Looking outboard Towards port side

Shop is normally at waterline, after blast 3’ of water in space General Workshop Port side Ground ZERO for blast Shop is normally at waterline, after blast 3’ of water in space HT Shop

HT Shop

MER1 Upper level SCU 1

MER1 Frame 219 Looking aft by General Workshop

MER1 Port side Between HT shop And air lock

MER1 Mid level Looking towards aft

Looking towards port side Supply Support Looking towards port side Frame 220 Supply Support MER 1

MER 2 OVBD valve removed Hole cut in Hull To dewater Supply MER2 MER 1

MER1 Lower level Looking Aft towards Escape trunk

AUX2 Frame 220 Port side AUX 2 MER 1

MER 2 STB shaft at Bulkhead seal to AUX 2 AUX 2 MER 1 MER2

MER 2 STB shaft at Bulkhead seal to AUX 2 AUX 2

MER 2 STB shaft at Bulkhead seal to AUX 2 AUX 2 MER 1