IEEE aj March Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Advertisements

Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0027r0 Submission Jan 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group January 2014 Closing Report.
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0956r1 Submission July 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group July 2014 Closing Report.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
A Proposed Timeline for IEEE ba TG
TGaz Next Generation Positioning Mar Closing Report
TGv Closing Report March 2008
IEEE aj January 2016 Closing Report
TGax March 2017 Closing Report
IEEE TGz Vancouver Agenda
IEEE aj Task Group May 2017 Agenda
TGaf Waikoloa Closing Report
TGae Closing Report – January 2010
TGae Closing Report – March 2010
TGae Closing Report – May 2010
TGaf Geneva Closing Report
IEEE ah Timeline Projection
TGaf Indian Wells Closing Report
TGaf San Antonio Closing Report
IEEE aj Task Group September 2017 Agenda
Tgae Closing Report – November 2009
Functional requirements for az
TGaf Waikoloa Closing Report
QoSMAN SG Closing Report – Nov 2009
TGaj Editor Report for CC22
TGaj Editor Report for CC22
TGad March 2011 Closing Report
IEEE MEDIA INDEPENDENT HANDOVER DCN:
TGak November Closing Report
TGba January 2018 Closing Report
TGae Closing Report – July 2010
TGad May 2011 Closing Report
TGm Closing Report – May 2010
2019 March TGba Closing Report
TGaj Editor Report for LB220
TGba September 2017 Closing Report
Task Group AY September 2017 Closing Report
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGaj Editor Report for LB226
TGaq Closing Report Date: Authors: July 2016 July 2016
TGae Closing Report – July 2011
TGae Closing Report – January 2011
Task Group AY May 2016 Closing Report
TGax September 2017 Closing Report
TGaf San Antonio Closing Report
Motion for EC Approval to forward the draft to Revcom
IEEE aj Task Group January 2017 Agenda
TGaj editor report for Sponsor Ballot
TGae Closing Report – November 2011
IEEE aj Task Group March 2017 Agenda
IEEE aj May Closing Report
IEEE aj Task Group May 2016 Agenda
TGaz Next Generation Positioning Jan Closing Report
Teleconference Call Agenda
TGaq Closing Report Date: Authors: March 2015 March 2015
TGax November 2017 Closing Report
IEEE aj Task Group May 2017 Agenda
IEEE TGaf Beijing Closing Report
TGae Closing Report – September 2010
TGaj editor report for Sponsor Ballot
Presentation transcript:

IEEE 802.11aj March Closing Report November 2011 doc.: IEEE 802.11-11/0xxxr0 March 2017 IEEE 802.11aj March Closing Report Date: 2017-03-16 Author: Jiamin Chen (Huawei) Osama Aboul-Magd (Samsung)

November 2011 doc.: IEEE 802.11-11/0xxxr0 March 2017 Abstract This document is the TGaj closing report for the March 2017 session. Jiamin Chen (Huawei) Osama Aboul-Magd (Samsung)

Work Completed Approved January 2017 meeting minutes (11-17/0086r0) November 2011 doc.: IEEE 802.11-11/0xxxr0 March 2017 Work Completed Approved January 2017 meeting minutes (11-17/0086r0) The following comment resolution proposal has been presented and approved 11-17/0460r1 – Proposed resolution for CID 701 in LB228 Completed all comment resolution of the LB228 for D5.0 Re-approved TGaj 5C doc (11-12/0141r7 ) for forwarding D5.0 to Sponsor Ballot Approved the report to EC and the request for unconditional approval to forward 11aj D5.0 to sponsor ballot 11-17/0492r0 – P802.11aj report to EC on unconditional approval for sponsor ballot Updated TG timeline Jiamin Chen (Huawei) Osama Aboul-Magd (Samsung)

March 2017 Plan for May meeting Comment resolution for TGaj Initial Sponsor Ballot Timeline update if needed Jiamin Chen (Huawei)

Conference Call Time 27th April, 2017, 10 pm ET for 1 hour March 2017 Conference Call Time 27th April, 2017, 10 pm ET for 1 hour (28th April, 2017, 10 am Beijing Time) Jiamin Chen (Huawei)

March 2017 Thank you! Jiamin Chen (Huawei)