Month 2002 doc.: IEEE /xxxr0 November 2003

Slides:



Advertisements
Similar presentations
Doc.: IEEE /702r0 Submission September 2003 Adrian Stephens, Intel CorporationSlide 1 Report of High Throughput Usage Model Special Committee.
Advertisements

Doc.: IEEE /518r1 Submission July 2003 Adrian Stephens, IntelSlide 1 Report of the Usage Model Special Committee Adrian P Stephens
IEEE s: ESS Mesh Networking Task Group
TGn Chair’s Status Update
TGn Editor Report Jan 2009 Date: Authors:
TGmb Editor Report - Jan 2010
IEEE s: ESS Mesh Networking Task Group
Intel Validation of TGn Simulation Scenarios
Simulation Metrics, & Criteria Ad Hoc Chairs Perspective Jan. 2001
<month year> doc.: IEEE <030158r0> March 2004
TGn PSMP Ad-hoc July 2007 Date: Authors: July 2007
High Throughput Coexistence issues – a personal comment
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
802.11F Meeting Report March 2001 Month 1998 doc.: IEEE /xxx
Month 2002 doc.: IEEE /xxxr0 March 2008 Motion
IEEE s: ESS Mesh Networking Task Group
TGn Closing Report September 2003
<month year> doc.: IEEE <030158r0> March 2004
IEEE 802 JTC1 Standing Committee Slides for IEEE 802 EC opening
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGn Opening Report Orlando , Fl, US March 2004
Outputs of the Usage Model Special Committee
TGn Simulation Methodology Ad Hoc Overview
Proposed PAR and 5 Criteria for High Throughput Task Group
TGn FRCC Jan 2004 Report Adrian P Stephens
Month 2002 doc.: IEEE /xxxr0 September 2004 Motion
SMSC March 2004 Session Speaker List
A Comment on Black-Box adaptation for simulation methodology
TGn Editor – Adrian Stephens
TGn Editor Report Jan 2009 Date: Authors:
Stephen McCann, Siemens Roke Manor
Avoiding unnecessary delays in the WG Letter Ballot process
Adrian P Stephens Chair, FRCC
Adrian P Stephens Chair, FRCC
Taipei Liaison Report Date: Authors: January 2008
TGn FRCC Jan 2004 Report Adrian P Stephens
IEEE s: ESS Mesh Networking Task Group
TGn FRCC Report March 2004 Adrian P Stephens Chair TGn FRCC
Task Group N Procedural Planning May 10, 2004
TGn Closing Report November 2003
TGn FRCC Jan 2004 Report Adrian P Stephens
Updates to TGn FRCC Documents
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Proposed PAR and 5 Criteria for High Throughput Task Group
IEEE 802 JTC1 Standing Committee Nov 2015 opening report for EC
Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005]
TGn Chair’s Status Update
PHY Abstraction to be used in MAC simulation
Atlanta Liaison Report
TGn Closing Report September 2003
TGn Closing Report Los Angeles, CA, US 802 Interim
WME+ / Fasttrack Differences
VHT SG November 2008 Closing Report
TGn Editor Report March 2007
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Tge draft ballot information
November 2010 Closing Report
Wireless Network Management
TGh Wednesday Report Mika Kasslin Nokia January 2001
Avoiding unnecessary delays in the WG Letter Ballot process
TGn Editor Report March 2007
Intel Validation of TGn Simulation Scenarios
TGs Closing Plenary Report
HRb SG Status and Information
Task Group N Schedule March 15, 2004
TGn Closing Report Orlando , Fl, US March 2004
TGn FRCC Jan 2004 Report Adrian P Stephens
January Session Supplementary Material
Clause Comment# 775,778,1558,1559 Resolutions
Adrian P Stephens Chair, FRCC
Presentation transcript:

(adrian.p.stephens@intel.com) Month 2002 doc.: IEEE 802.11-02/xxxr0 November 2003 802.11 TGn Functional Requirements and Comparison Criteria Special Committee Report Adrian P Stephens Intel Corporation (adrian.p.stephens@intel.com) Adrian Stephens, Intel John Doe, His Company

November 2003 FRCC Activities Bi-weekly telecons starting after notification period after approval at Singapore meeting 2 Telecons Held according to published schedule Email comments received on FR R1 These comments partly discussed Adrian Stephens, Intel

FRCC Output Documents 11-03-813 Functional Requirements November 2003 FRCC Output Documents 11-03-813 Functional Requirements Currently R3 includes merged comments and decisions made at 4 Nov 2003 telecon 11-03-814 Comparison Criteria Currently R2 – no feedback on this yet 11-03-815 Cumulative Minutes 11-03-802 Usage Models FRCC is responsible for maintaining these R2 contains updated simulation scenarios and enterprise usage model Adrian Stephens, Intel

November 2003 November TGn Meeting Need to consider changes to usage models, answer unresolved issues and approve simulation scenarios. Consider and approve Functional Requirements document Consider and approve Comparison Criteria documents Adrian Stephens, Intel

November 2003 Future Activities Work of the FRCC completes when its output documents are approved by TGn Telecons bi-weekly until January 2004 session (18 Nov, 2 Dec, 16 Dec, 30 Dec) January 2004 TGn session: 12-16 Jan 2004 Adrian Stephens, Intel