DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch, Tullis C. Onstott and Hank Sobel
Group Name Interested principals and collaborators
Science Objectives Why is DUSEL the best or only place this experiment can be done? Why is it important to do these experiments in the near future? Expected results and their significance
Proposed Experiments (Describe A+ Experiments in multiple slides: maybe 1 to 5 slides) Approach – maybe including list of sub-proposal topics and how these can be amalgamated into a coherent program to address the objectives Use pictures and graphs to explain the experiment(s) and its/their physical form
Facility Needs Facilities E&O Risk identification and management Space, access, power, equipment, communications, services, special materials, etc. required to successfully conduct experiment E&O Risk identification and management Potential problems that could affect successful outcome Potential problems that could affect other experiments or facility
Schedule Development needs prior to conducting experiments at Homestake S-4 activities to be proposed (e.g. workshops, teleconferences, trips to Homestake, etc.) Schedule Estimated time required and sequence of tasks; start with S-4 activities
Estimated Costs (These estimates will be for DEDC and DUSEL-Homestake eyes only) Cost estimates S-4 proposal cost ISE Project cost Tasks required to refine ISE Project cost estimate